05000328/LER-1983-013, Forwards LER 83-013/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-013/03L-0
ML20079P281
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/24/1983
From: Green H
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20079P283 List:
References
NUDOCS 8303040575
Download: ML20079P281 (1)


LER-1983-013, Forwards LER 83-013/03L-0
Event date:
Report date:
3281983013R00 - NRC Website

text

- _ - _ -..

1 d

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 1750 Chestnut Street Tower II February 24, 1983 cc w=

M m

co 3.

, 'S D

N*

50

,,;N Mr. James P. O'Reilly, Director D

U.S. Nuclear Regulatory Commission f'

If;,p o

Office of Inspection and Enforcement [0O 2

Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 2 - DOCKET NO. 50-328 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQR0-50-323/83013 The enclosed report provides details concerning the inoperability of the upper head injection (UHI) system level switches.

This report is submitted in accordance with Sequoyah unit 2 Technical Specification 6.9.1.13.b.

Very truly yours, TENNESSEE VALLEY AU ORI i ff Y

H. J. Green Director of Nuclear Power Enclosure cc (Enclosure):

Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 NRC Inspector, Sequoyah l

8303040575 830224 PDR ADOCK 05000328 PDR An Equal Opportunity Employer