05000327/LER-1983-014, Forwards LER 83-014/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-014/03L-0
ML20071B607
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/22/1983
From: Green H
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20071B608 List:
References
NUDOCS 8302280457
Download: ML20071B607 (1)


LER-1983-014, Forwards LER 83-014/03L-0
Event date:
Report date:
3271983014R00 - NRC Website

text

A m wi e

i*

~ TENNESSEE VALLEY AUTHORITY -

CH ATTANOOGA. TENNESSEE 374o1 1750 Chestnut Street Tower II February 22, 1983

]

m p r +-

cn m.

/

o S?

~

q 21 1

.-Q
  • y 2.

4*4 Mr. James P. O'Reilly, Director

.7 N'I U.S. Nuclear Regulatory Commission

  1. .i Office of Inspection and Enforcement Cf-Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCKET NO. 50-327 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-327/83014 The enclosed report provides details concerning the hydrogen recombiner being inoperable because of a bad kilowatt meter.

This report is submitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.10.b.

Very truly yours, TE i.SSEE VALLEY AUTHORITY J. Green rector of Nuclear Power Enclosure cc (Enclosure):

Document Control Desk

,3 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 NRC Inspector, Sequoyah oyy1Clg, COD 8302200457 830222 PDR ADOCK 05000327 S

PDR An Equal Opportunity Employe: