| Title | Failure to Take Timely Corrective Actions for Invalid Local Leak Rate Test |
| Description | The inspectors identified a noncited violation of 10 CFR 50, Appendix B, Criterion XVI, Corrective Actions for the licensees failure to take corrective action for an invalid local leak rate test performed on the Unit 2 escape hatch, 2C-2. Specifically, the licensee failed to take appropriate and timely corrective action to develop an appropriate testing method for the inner and outer escape hatch door seals. The issue was entered into the licensees corrective action program as Condition Report CR-ANO-2-2011-3198. The inspectors determined that the licensees failure to develop an adequate testing method that did not use the strong backs to precondition the escape hatch door seals prior to the 2R20 fall 2009 outage was a performance deficiency. Specifically, the licensee failed to provide timely corrective actions to a condition adverse to quality that had been identified in a previous NRC identified noncited violation and was within the licensees ability to foresee and correct. The performance deficiency was determined to be more than minor because it was associated with the procedure quality attribute of the Barrier Integrity cornerstone and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers (containment) protect the public from radionuclide releases caused by accidents or events and is therefore a finding. Using Manual Chapter 0609.04, Phase 1 - Initial Screening and Characterization of Findings, the finding was determined to have very low safety significance, Green, because the finding does not represent a degradation of the radiological barrier, or the smoke and toxic gas barrier functions provided for the control room, or does not represent an actual open pathway in the physical integrity of the reactor containment or a heat removal component. The finding was determined to have a crosscutting aspect in the area of problem identification and resolution, associated with the corrective action program in that the licensee did not thoroughly evaluate the problem in a manner to make certain that the resolution addressed the causes and the extent of condition to ensure a new test method, that did not use preconditioning, would be completed in a timely manner to resolve the problem. |
| Site: | Arkansas Nuclear |
|---|---|
| Report | IR 05000313/2011004 Section 4OA2 |
| Date counted | Sep 30, 2011 (2011Q3) |
| Type: | NCV: Green |
| cornerstone | Barrier Integrity |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | A Sanchez J Rotton K Clayton L Ricketson R Azua R Kumana W Schaup |
| CCA | P.2, Evaluation |
| INPO aspect | PI.2 |
| ' | |