05000302/LER-2005-005, Inadvertent B Train Engineered Safeguards Actuation Due to Inadequate Procedure Guidance

From kanterella
Jump to navigation Jump to search
Inadvertent B Train Engineered Safeguards Actuation Due to Inadequate Procedure Guidance
ML060190516
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/11/2006
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0106-01 LER 05-005-00
Download: ML060190516 (8)


LER-2005-005, Inadvertent B Train Engineered Safeguards Actuation Due to Inadequate Procedure Guidance
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3022005005R00 - NRC Website

text

1C Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.73 January 11, 2006 3F0106-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

CRYSTAL RIVER UNIT 3 - LICENSEE EVENT REPORT 50-302/2005-005-00

Dear Sir:

Florida Power Corporation, currentl doing business as Progress Energy Florida, Inc., hereby submits Licensee Event Report (LER) 50-302/2005-005-00. The LER discusses an inadvertent B Train Engineered Safeguards (ES) actuation due to inadequate guidance in shutdown procedures for removal of the ES report is being submitted pursuant to 10CFR50.73(a)(2)(iv)(A).

No new regulatory commitments are made in this letter.

If you have any questions regarding this submittal, please contact Mr. Paul Infanger, Supervisor, Licensing and Regulatory Programs at (352) 563-4796.

4on A. Franke Plant General Manager Crystal River Nuclear Plant JAF/dwh Enclosure xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 06/30/2007 (6-2004)

, the NRC digits/characters for each block) matonn is not required to respond to, the

3. PAGE CRYSTAL RIVER UNIT 3 05000302 1 OF 7
4. TITLE Inadvertent B Train Engineered Safeguards Actuation Due To Inadequate Procedure Guidance
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED SEQUNTIA REVFACIITY AMEDOCKET NUMBER MONTH DAY YEAR YEAR SEQUENTIAL REV MONTH DAY YEAR N/A 05000 FACILITY NAME DOCKET NUMBER 11 14 20 2005 - 005 -

00 01 11 2006 N/A 05000

9. OPERATING MODE
11. THIS REPORT IS SUBMITT-D PURSUANT TO THE REQUIREMENTS OF 10 CFR§: (Check all that apply)

Cl 20.2201(b)

El 20.2203(a)(3)(i)

El 50.73(a)(2)(i)(C)

El 50.73(a)(2)(vii) 6 El 20.2201(d)

[E 20.2203(a)(3)(ii)

El 50.73(a)(2)(ii)(A)

El 50.73(a)(2)(viii)(A)

El 20.2203(a)(1)

El 20.2203(a)(4)

El 50.73(a)(2)(ii)(B) al 50.73(a)(2)(viii)(B)

El 20.2203(a)(2)(i)

El 50.36(c)(1)(i)(A)

Dl 50.73(a)(2)(iii)

El 50.73(a)(2)(ix)(A)

10. POWER LEVEL EC 20.2203(a)(2)(ii)

El 50.36(c)(1)(ii)(A) 0 50.73(a)(2)(iv)(A) al 50.73(a)(2)(x) al 20.2203(a)(2)(iii) a 50.36(c)(2)

D 50.73(a)(2)(v)(A) a 73.71(a)(4)

El 20.2203(a)(2)(iv) al 50.46(a)(3)(ii)

El 50.73(a)(2)(v)(B) al 73.71 (a)(5) 0%

El 20.2203(a)(2)(v)

El 50.73(a)(2)(i)(A)

El 50.73(a)(2)(v)(C)

El OTHER El 20.2203(a)(2)(vi)

El 50.73(a)(2)(i)(B)

El 50.73(a)(2)(v)(D)

Specify in Abstract below or in (If more space is required, use additional copies of (if more space is required, use additional copies of (If more space is required, use additional copies of (If more space is required, use additional copies of (If more space is required, use additional copies of (If more space is required, use additional copies of NRC Form 366A)

ATTACHMENT 2 LIST OF COMMITMENTS The following table identifies those actions committed to by PEF in this document. Any other actions discussed in the submittal represent intended or planned actions by PEF. They are described for the NRC's information and are not regulatory commitments. Please notify the Supervisor, Licensing & Regulatory Programs, of any questions regarding this document or any associated regulatory commitments.

RESPONSE

COMMITMENT

DUE DATE SECTION No regulatory commitments are being made in this submittal.

NR OM.... {1--nn