Finding | |
|---|---|
| Title | Failure to Identify, Evaluate, and Correct A SRV Failure to Open Upon Manual Actuation |
| Description | A self-revealing preliminary White finding and AV of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, and Technical Specification (TS) 3.5.E, Automatic Depressurization System, was identified for the failure to identify, evaluate, and correct a significant condition adverse to quality associated with the A SRV. Specifically, Entergy failed to identify, evaluate, and correct the A SRVs failure to open upon manual actuation during a plant cooldown on February 9, 2013. In addition, the failure to take actions to preclude repetition resulted in the C SRV failing to open due to a similar cause following the January 27, 2015, LOOP event. Entergy entered this issue in to the CAP as CR-PNP-2015-01983, CR-PNP-2015-00561, and CR-PNP-2015-01520. Immediate corrective actions included replacing the A and C SRVs and completing a detailed operability analysis of the installed SRVs which concluded that a reasonable assurance of operability existed. Entergys failure to identify, evaluate, and correct the condition of the A SRVs failure to open upon manual actuation during a plant cooldown on February 9, 2013, was a performance deficiency. In addition, the failure to take actions to preclude repetition resulted in the C SRV failing to open due to a similar cause following the January 27, 2015 LOOP event. The self-revealing finding was within Entergys ability to foresee and correct because indications were available to determine that the A SRV valve did not open upon manual actuation. This was discovered as a result of an extent of condition review of the C SRV failing to open upon manual actuation following the January 27, 2015 LOOP event. This performance deficiency is more than minor because it could reasonably be viewed as a precursor to a significant event if two of the four SRVs failed to open when demanded to depressurize the reactor, following the failure of high pressure injection systems or torus cooling, to allow low pressure injection systems to maintain reactor coolant system inventory following certain initiating events. In addition, it is associated with the Mitigating Systems cornerstone attribute of equipment performance and affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors screened this issue for safety significance in accordance with IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, issued June 19, 2012. The screening determined that a detailed risk evaluation was required because it was assumed that for a year period, two of the four SRVs were in a degraded state such that they potentially would not have functioned to open at some pressure lower than rated pressure and would not fulfill their safety function for greater than the TS allowed outage time. Specifically, the assumptions of failures to open were based on: a failed actual opening demand at 200 psig reactor pressure on January 27, 2015, for the C SRV; examination of the valve internals at the testing vendor (National Technical Systems); and a previous failed actual opening demand at 114 psig reactor pressure on February 9, 2013, for the A SRV. The staff determined that there wasnt an existing SDP risk tool that is suitable to assess the significance of this finding with high confidence, mainly because of the uncertainties associated with: the degradation mechanism and its rate; the range of reactor pressure at which the degraded valves could be assumed to fully function; any potential benefit from an SRV lifting at rated pressure, such that the degradation would be less likely to occur and, therefore, prevent a subsequent failure at low pressure in the near-term; the time based nature of plant transient response relative to when high pressure injection sources fail and the associated impact of reduced decay heat on the SRV depressurization success criteria; and the ability to credit other high pressure sources of water. Based on the considerations above, the risk evaluation was performed using IMC 0609, Appendix M, Significance Determination Process Using Qualitative Criteria, issued April 12, 2012. The NRC made a preliminary determination that the finding was of low to moderate safety significance (White) based on quantitative and qualitative evaluations. The detailed risk evaluation is contained in Attachment 4 to this report. This finding does not present a current safety concern because the A and C SRVs were replaced during the outage following the January 27, 2015 LOOP and reactor trip event. Also, Entergy performed a detailed operability analysis of the installed SRVs which concluded that a reasonable assurance of operability existed. This finding had a cross-cutting aspect in Problem Identification and Resolution, Evaluation, because Entergy did not thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance. Specifically, Entergy staff did not thoroughly evaluate the operation of the A SRV during the February 9, 2015 plant cooldown and should have reasonably identified that the A SRV did not open upon three manual actuation demands. |
| Site: | Pilgrim |
|---|---|
| Report | IR 05000293/2015007 Section 4OA5 |
| Date counted | Mar 31, 2015 (2015Q1) |
| Type: | Violation: White |
| cornerstone | Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 93812 |
| Inspectors (proximate) | C Cahill D Schroeder E Burket E Dipaolo H Nieh J Lilliendahl S Pindale T Dunn |
| Violation of: | 10 CFR 50 Appendix B Criterion XVI Technical Specification |
| CCA | P.2, Evaluation |
| INPO aspect | PI.2 |
| ' | |