ML091520491

From kanterella
Revision as of 07:56, 26 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Palisades - NRC Region Iii, Initial License Exam, Job Performance Measure, JPM: RO System D, Title: Sample Containment for Hydrogen
ML091520491
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200319 List:
References
Download: ML091520491 (10)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE

JPM: RO SYSTEM d TITLE: SAMPLE CONTAINMENT FOR HYDROGEN

CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 2 of 10 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task: Left channel of Containment Hydrogen monitoring in service.

Alternate Path: YES

Facility JPM #: PL-OPS-HYR-003J

K/A: 028A4.03 Importance: RO: 3.1 SRO: 3.3

K/A Statement: Location and operation of hydrogen sampling and analysis of containment atmosphere, including alarms and indications

Task Standard: Left channel of Containment Hydrogen monitoring placed in service in the 'Accident Mode'.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

EOP-4.0, Loss Of Coolant Recovery SOP-38, Gaseous Waste Monitoring System

Validation Time: 12 minutes Time Critical: NO

Candidate:

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes

Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________ Signature JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 3 of 10 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-38, Gaseous Waste Monitoring System, Section 7.5.1, Rev. 24

Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE

DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The plant has been tripped due to a primary coolant leak.
  • Both channels of Hydrogen Monitoring have been in standby for greater than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

INITIATING CUES:

JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 4 of 10 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate EOP-4.0, Loss Of Coolant Accident, Step 12 Step 12 of EOP-4.0 located S U Comment:

Proc. Step TASK ELEMENT 2 STANDARD Grade n/a Locate SOP-38, Gaseous Waste Monitoring System, Section 7.5.2, To Sample Containment For H 2 SOP-38, step 7.5.2 located.

S U Comment: Evaluator provides the operator a working copy SOP-38, Section 7.5.2.

Proc. Step TASK ELEMENT 3 STANDARD Grade7.5.2a ENSURE sampling system in STANDBY for at least six hours.

Operator determines sampling system in standby for at least six hours (given in initial conditions).

S U Comment: EVALUATOR CUE:

If Operator asks if step 7.5.1 actions are complete, CUE that step 7.5.1 actions are complete.

JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 5 of 10 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade7.5.2b CHECK desired hand switch in normal position Left Channel HS-2419 HS-2419 verified in the normal position S U Comment:

Proc. Step TASK ELEMENT 5 STANDARD Grade7.5.2c CHECK Range selector switch to the "0-10% range, for desired channel."

Left channel Hydrogen Monitor Range select switch verified set to the 0-10% range position.

S U Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade7.5.2d If CHP or CHR signal present or imminent, THEN ENABLE the sample valves to be opened by turning the appropriate Key Switch to the ACCI position.

Left Channel HS-2419 (Key 364)

Key 364 obtained AND Inserts Key in HS-2419. AND Places HS-2419 to the ACCI position.

S U Comment: EVALUATOR NOTE:

HS-2419 to ACCI position is required by EOP-4.0 step 12.

EVALUATOR CUE:

If asked if HS-2419 is to be placed in the ACCI position, REPORT that the procedural direction is to be followed.

CRITICAL STEP

JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 6 of 10 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade7.5.2e For the desired channel, OPERATE the following hand switches to the OPEN position AND RELEASE: Left Channel HS-2417 HS-2417 placed to the open position. AND HS-2417 released. S U Comment:

CRITICAL STEP

Proc. Step TASK ELEMENT 8 STANDARD Grade7.5.2f For the desired channel, PLACE the following hand switches to the OPEN position:

Left Channel HS-2413A HS-2413B HS-2415A HS-2415B HS-2413A placed to open position (red open light on, green close light off). AND HS-2413B placed to open position (red open light on, green close light off).

AND HS-2415A placed to open position (red open light on, green close light off). AND HS-2415B placed to open position (red open light on, green close light off).

S U Comment:

CRITICAL STEP

JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 7 of 10 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade7.5.2g ENERGIZE Recorder AR-2401, Containment Hydrogen Recorder, as follows: 1. PLACE Power Switch to ON (Left Side of Recorder)

2. PLACE Chart Drive Switch to ON (Top of Recorder)

Recorder AR-2401 power switch placed to on. AND Recorder AR-2401 chart drive switch placed to on S U Comment:

Proc. Step TASK ELEMENT 10 STANDARD Grade7.5.2h PLACE the desired hand switch to the ANALYZE position.

Left Channel HS-2427L HS-2427L placed to the analyze position.

S U Comment: EVALUATOR NOTE: Sample light will not light as expected.

EVALUATOR NOTE: EK-0227,Cont H 2 Mont C-161 Fail (on front of Panel C-11A) will annunciate as expected.

CRITICAL STEP

Proc. Step TASK ELEMENT 11 STANDARD Grade7.5.2i PUSH ALARM RESET pushbutton to clear any alarms Alarm reset pushbutton on left channel hydrogen monitor pushed.

S U Comment: EVALUATOR NOTE: Sample light will not light as expected.

JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 8 of 10 JULY 2008 Proc. Step TASK ELEMENT 12 STANDARD Grade7.5.2j.1 IF the SAMPLE light does NOT light, THEN: 1. PUSH desired REMOTE SELECTOR pushbutton Left Channel HS-2426L HS-2426L is pushed. AND SAMPLE light lights.

S U Comment: EVALUATOR NOTE: Sample light will light as expected.

CRITICAL STEP

Proc. Step TASK ELEMENT 13 STANDARD Grade7.5.2j.2 ENSURE the desired Function Selector Switch in the SAMPLE position.

Left Channel HS-2428L HS-2428L is verified in the SAMPLE position.

S U Comment:

Proc. Step TASK ELEMENT 14 STANDARD Grade7.5.2k WHEN Hydrogen Monitor has been in ANALYZE for at least 15 minutes, THEN READ % H 2. Operator determines that 15 minutes will have to elapse to perform this step.

S U Comment: EVALUATOR CUE:

CUE Operator that another Operator will perform this step.

JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 9 of 10 JULY 2008 Proc. Step TASK ELEMENT 15 STANDARD Graden/a Notify CRS that the left channel of Containment Hydrogen monitoring is in service. CRS notified that the left channel of Containment Hydrogen monitoring has been placed in service.

S U Comment:

END OF TASK

JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 10 of 10 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The plant has been tripped due to a primary coolant leak.
  • Both channels of Hydrogen Monitoring have been in standby for greater than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

INITIATING CUES: