ML091520492
| ML091520492 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/07/2008 |
| From: | NRC/RGN-III |
| To: | Entergy Nuclear Palisades |
| Shared Package | |
| ML082200319 | List: |
| References | |
| Download: ML091520492 (10) | |
Text
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
RO SYSTEM e TITLE:
PERFORM A DIESEL GENERATOR (D/G)
VOLTAGE TEST ON 1-1 D/G CANDIDATE:
EXAMINER:
JPM RO SYSTEM e PALISADES NUCLEAR PLANT Page 2 of 9 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task: Perform Diesel Generator Surveillance MO-7A-1 and MO-7A-2 Alternate Path: NO Facility JPM #: PL-OPS-EDG-005J K/A: 064A4.06 Importance:
RO: 3.9 SRO: 3.9 K/A Statement: Manual start, loading, and stopping of the ED/G Task Standard: 1-1 D/G Auto Voltage Regulator High and Low Limits verified.
Preferred Evaluation Location: Simulator
__X__
In Plant Preferred Evaluation Method:
Perform
__X__
Simulate
References:
MO-7A-1, Emergency Diesel Generator 1-1 Validation Time: 10 minutes Time Critical:
NO Candidate:
Time Start: ________
Time Finish:
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
JPM RO SYSTEM e PALISADES NUCLEAR PLANT Page 3 of 9 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
MO-7A-1, Emergency Diesel Generator 1-1, Sections 5.5 and 5.6, Rev. 67 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- Diesel Generator 1-1 running unloaded at 60 Hz.
- MO-7A-1, "Emergency Diesel Generator 1-1" is in progress; all steps up to 5.6 are completed.
- Month is January.
- Plant is in Mode 1
- Auxiliary Operator is stationed at EC-22, Diesel Generator 1-1 Local Panel at extension 3583.
INITIATING CUES:
- During performance of MO-7A-1, the Control Room Supervisor directs you to perform Section 5.6 "Voltage Regulator Test."
JPM RO SYSTEM e PALISADES NUCLEAR PLANT Page 4 of 9 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Operator obtains a copy of MO-7A-1, Sections 5.5 and 5.6 MO-7A-1, Sections 5.5 and 5.6 obtained S U Comment:
NOTE: Evaluator provides the operator a working copy of MO-7A-1, Sections 5.5 and 5.6.
Proc. Step TASK ELEMENT 2 STANDARD Grade 5.6.1 DETERMINE the Voltage Regulator Mode Select switch position from the table for the month.. AND PERFORM the following:
Voltage Regulator Mode Select Switch Position is AUTO for month of January Operator determines that the Voltage Regulator Mode Select switch position is AUTO.
S U Comment:
NOTE: The Voltage Regulator Mode Select switch position is determined by the Month of the test.
NOTE: EVALUATOR CUE: If asked as System Engineer what switch position to use, CUE that the procedure, MO-7A-1 is to be followed.
Proc. Step TASK ELEMENT 3 STANDARD Grade 5.6.1a IF position is AUTO, THEN ENSURE Voltage Regulator Mode Select switch is in the AUTO position (location C-04 panel).
Voltage Regulator Mode Select switch is verified in AUTO position.
S U Comment:
JPM RO SYSTEM e PALISADES NUCLEAR PLANT Page 5 of 9 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 5.6.1b.1 IF position is MANUAL, THEN PERFORM the following:
Operator determines that this step is not applicable.
S U Comment:
Proc. Step TASK ELEMENT 5 STANDARD Grade 5.6.1b.2 IF the plant is in Mode 1, 2, 3, or 4, THEN PERFORM off-site source checks.
Operator determines that this step is not applicable.
S U Comment:
Proc. Step TASK ELEMENT 6 STANDARD Grade 5.6.2 DETERMINE the switch from the table for the performance month. AND PERFORM the Following:
Operator determines that the Field Rheostat switch on C-04 is to be used.
S U Comment:
NOTE: The Field Rheostat switch on C-04 is determined by the Month of the test.
NOTE: EVALUATOR CUE: If asked as System Engineer what switch to use, CUE The procedure, MO-7A-1 is to be followed.
CRITICAL STEP
JPM RO SYSTEM e PALISADES NUCLEAR PLANT Page 6 of 9 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 5.6.2a Slowly raise generator voltage to between 2575 VAC and 2625 VAC on EVI-1213L, Local Volt Meter or as directed by the System Engineer.
Operator adjusts generator voltage between 2575 VAC and 2625 VAC on EVI-1213L with the Field Rheostat switch on C-04.
S U Comment:
NOTE: EVALUATOR CUE: If asked as System Engineer what generator voltage limits to use, CUE that the procedure, MO-7A-1 is to be followed.
NOTE: EVALUATOR CUE: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade 5.6.2b RECORD generator voltage and field voltage (location EC-26 panel)
Local Volt Meter (EVI-1213L0 Volts:
Field Voltage (EVI-1213DC)n Volts: ____
Recorded generator and field voltages (from EC-26 panel:
Local Volt Meter (EVI-1213L) Volts: 2575 to 2625 Field Voltage (EVI-1213DC) Volts: __80V_
S U Comment:
NOTE: EVALUATOR CUE If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
NOTE: EVALUATOR CUE: If asked as AO to report field voltage, REPORT: field voltage reads 80 V on EVI-1213DC.
JPM RO SYSTEM e PALISADES NUCLEAR PLANT Page 7 of 9 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade 5.6.2c Slowly lower generator voltage to between 2275 VAC and 2325 VAC on EVI-1213L, Local Volt Meter or as directed by the System Engineer.
Operator adjusts generator voltage between 2275 VAC and 2325 VAC on EVI-1213L with the Field Rheostat switch on C-04.
S U Comment:
NOTE: EVALUATOR CUE: If asked as System Engineer what generator voltage limits to use, CUE that the procedure, MO-7A-1 is to be followed.
NOTE: EVALUATOR CUE: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
CRITICAL STEP Proc. Step TASK ELEMENT 10 STANDARD Grade 5.6.2d RECORD generator voltage and field voltage (location EC-26 panel)
Local Volt Meter (EVI-1213L0 Volts:
Field Voltage (EVI-1213DC)n Volts: ____
Recorded generator and field voltages (from EC-26 panel:
Local Volt Meter (EVI-1213L) Volts: 2275 to 2325 Field Voltage (EVI-1213DC) Volts: __70V_
S U Comment:
NOTE: EVALUATOR CUE If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
NOTE: EVALUATOR CUE: If asked as AO to report field voltage, REPORT: field voltage reads 70 V on EVI-1213DC.
JPM RO SYSTEM e PALISADES NUCLEAR PLANT Page 8 of 9 JULY 2008 Proc. Step TASK ELEMENT 11 STANDARD Grade 5.6.2e RAISE generator voltage to 2400 VAC (2390 VAC - 2410 VAC) on EVI-1107L, Local Volt Meter.
Generator voltage raised to between 2390 VAC and 2410 VAC on EVI-1107L with the Field Rheostat switch on C-04.
S U Comment:
NOTE: EVALUATOR CUE If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
CRITICAL STEP Proc. Step TASK ELEMENT 12 STANDARD Grade 5.6.3 ENSURE Voltage Regulator Mode Select switch is in AUTO position (location C-04 panel).
Performed By: Signed, Time and Dated Verified By: Signed, Time and Dated Voltage Regulator Mode Select switch verified in the AUTO position Preformed By: N/A Verified By: Signed, Time and Dated S U Comment:
NOTE: EVALUATOR: Operator will not sign the Performed By line, the Verified By line will be signed (Voltage Selector switch in proper position and not manipulated)
Proc. Step TASK ELEMENT 13 STANDARD Grade n/a Notify CRS that 1-1 D/G Voltage Regulator Test has been completed per Section 5.6 of MO-7A-2, for 1-2 D/G.
CRS notified that Section 5.6 of MO-7A-2 for Voltage Regulator Test Complete.
S U Comment:
END OF TASK
JPM RO SYSTEM e PALISADES NUCLEAR PLANT Page 9 of 9 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
- Diesel Generator 1-1 running unloaded at 60 Hz.
- MO-7A-1, "Emergency Diesel Generator 1-1" is in progress; all steps up to 5.6 are completed.
- Month is January.
- Plant is in Mode 1
- Auxiliary Operator is stationed at EC-22, Diesel Generator 1-1 Local Panel at extension 3583.
INITIATING CUES:
- During performance of MO-7A-1, the Control Room Supervisor directs you to perform Section 5.6 "Voltage Regulator Test."