Finding | |
|---|---|
| Title | |
| Description | The inspectors reviewed a self-revealing Green, non-cited violation of Technical Specification 3.3.4 Remote Shutdown System, for the licensees failure to maintain adequate configuration control of fuses associated with an emergency diesel generator (EDG). The licensees failure to maintain adequate configuration control by not verifying that fuses were properly installed, and adequate post maintenance testing was performed, following maintenance activities was a performance deficiency. Specifically, following the 1R17 refueling outage, from approximately June 13, 2013 until November 22, 2013, EDG 1-3 would not have been able to perform its remote shutdown function due to not being able to be adequately operated at the local EDG control cubicle. The licensee entered this issue into the corrective action program as Notification 50595473, and took prompt actions to restore the fuses to the correct position and verify the positions of the fuses in the other EDG output breaker cubicles. The failure to properly install fuses in the local manual operation circuitry of EDG 1-3 was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone, and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, it affected the ability to reach and maintain safe shutdown conditions in case of a fire causing a control room abandonment. The inspectors evaluated this finding using Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination Process," dated September 20, 2013. Because it affected the ability to reach and maintain safe shutdown conditions in case of a fire that led to control room evacuation, the Phase 2 methodology of Inspection Manual Chapter 0609, Appendix F, was not appropriate for this finding. Therefore, the senior reactor analyst performed a Phase 3 evaluation to determine the risk significance. The analyst determined that the performance deficiency only increased the risk of the plant as it related to the need to locally control EDG 1-3 following a postulated control room evacuation. The Senior Risk Analyst determined that the change in core damage frequency was less than 1 x 10-6, and the finding was not significant with respect to large, early release frequency. The analyst determined that this finding was of very low risk significance (Green). This finding had a cross-cutting aspect in the area of human performance associated with the work practices component, because the licensee did not ensure supervisory and management oversight of work activities, such that nuclear safety was supported [H.5]. |
| Site: | Diablo Canyon |
|---|---|
| Report | IR 05000275/2015002 Section 4OA3 |
| Date counted | Jun 30, 2015 (2015Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | J Reynoso M Hayes M Kennard R Alexander T Buchanan T Hipschman |
| Violation of: | Technical Specification |
| CCA | H.5, Work Management |
| INPO aspect | WP.1 |
| ' | |