December 16, 2013
Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.
Zion, IL 60099-2797
SUBJECT:
ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Sauger:
On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
. Sincerely,
/RA/ John B. Hickman, Project Manager
Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs
Docket Nos. 50-295 and 50-304
Enclosure:
Request for Additional Information
cc w/enclosure: Zion Service List
Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.
Zion, IL 60099-2797
SUBJECT:
ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Sauger:
On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.
Sincerely,
/RA/ John B. Hickman, Project Manager
Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs
Docket Nos. 50-295 and 50-304
Enclosure:
Request for Additional Information
cc w/enclosure: Zion Service List
DISTRIBUTION: ROrlikowski, RIII AKock, NRR KLois, NRR ML13347B300 OFC DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston BWatson JHickman DATE 12 /16 / 2013 12 /16 / 2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY Zion Nuclear Power Station, Units 1 and 2 Service List
cc: Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd. Zion, IL 60099-2797
Patrick Thurman, Esq.
VP Regulatory Affairs, Licensing and
Document Control ZionSolutions
, LLC 101 Shiloh Blvd.
Zion, IL 60099-2797
Gary Bouchard VP Engineering, Ops & Nuclear Security and Decommissioning Plant Manager
ZionSolutions
, LLC 101 Shiloh Blvd.
Zion, IL 60099
Russ Workman General Counsel EnergySolutions 423 West 300 South, Suite 200 Salt Lake City, UT 84101 Mayor of Zion Zion, IL 60099
Mr. Kent McKenzie, Emergency Management Coordinator Lake County Emergency Management Agency 1303 N. Milwaukee Avenue
Libertyville, IL 60048-1308
Regional Administrator U.S. NRC, Region III
2443 Warrenville Road Lisle, IL 60532-4352
John E. Matthews Morgan, Lewis & Bockius LLP
1111 Pennsylvania Avenue, NW Washington, DC 20004
Matias F. Travieso-Diaz Pillsbury Winthrop Shaw Pittman LLP
2300 N St., NW Washington, DC 20037
Tom Reilly, Executive Principal Vista 360 649 Innsbruck
Libertyville, IL 60048
Director Spent Fuel & Decommissioning Strategy Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL 60555
J. Bradley Fewell Associate General Counsel Exelon Corporation, LLC
4300 Winfield Rd.
Warrenville, IL 60555
Document Control Desk - Licensing Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL 60555
Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR ZION NUCLEAR POWER STATION, UNITS 1 AND 2
The request for additional information (RAI) is in response to the 2013 Decommissioning Funding Status (DFS) report for Zion Nuclear Power Station, Units 1 and 2. On March 26,
2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI #1: Decommissioning Costs On March 26, 2013, ZionSolutions, LLC did not provide the difference between actual and
estimated costs for decommissioning work performed during the previous year.
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based. Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.