J. Sauger Ltr. Request for Additional Information for Decommissioning Funding Status Report for Zion Units 1 and 2
ML13347B300
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/16/2013
From: John Hickman
NRC/FSME/DWMEP/DURLD/RDB
To: Sauger J
ZionSolutions
Hickman J
References
Download: ML13347B300 (4)


Text

December 16, 2013 Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.

Zion, IL 60099-2797

SUBJECT:

ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Sauger:

On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-295 and 50-304

Enclosure:

Request for Additional Information cc w/enclosure: Zion Service List

Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.

Zion, IL 60099-2797

SUBJECT:

ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Sauger:

On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-295 and 50-304

Enclosure:

Request for Additional Information cc w/enclosure: Zion Service List DISTRIBUTION: ROrlikowski, RIII AKock, NRR KLois, NRR ML13347B300 OFC DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston BWatson JHickman DATE 12 /16 / 2013 12 /16 / 2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY

Zion Nuclear Power Station, Units 1 and 2 Service List cc:

Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.

Zion, IL 60099-2797 Patrick Thurman, Esq.

VP Regulatory Affairs, Licensing and Document Control ZionSolutions, LLC 101 Shiloh Blvd.

Zion, IL 60099-2797 Gary Bouchard VP Engineering, Ops & Nuclear Security and Decommissioning Plant Manager ZionSolutions, LLC 101 Shiloh Blvd.

Zion, IL 60099 Russ Workman General Counsel EnergySolutions 423 West 300 South, Suite 200 Salt Lake City, UT 84101 Mayor of Zion Zion, IL 60099 Mr. Kent McKenzie, Emergency Management Coordinator Lake County Emergency Management Agency 1303 N. Milwaukee Avenue Libertyville, IL 60048-1308 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Matias F. Travieso-Diaz Pillsbury Winthrop Shaw Pittman LLP 2300 N St., NW Washington, DC 20037 Tom Reilly, Executive Principal Vista 360 649 Innsbruck Libertyville, IL 60048 Director Spent Fuel & Decommissioning Strategy Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 J. Bradley Fewell Associate General Counsel Exelon Corporation, LLC 4300 Winfield Rd.

Warrenville, IL 60555 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR ZION NUCLEAR POWER STATION, UNITS 1 AND 2 The request for additional information (RAI) is in response to the 2013 Decommissioning Funding Status (DFS) report for Zion Nuclear Power Station, Units 1 and 2. On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).

RAI #1: Decommissioning Costs On March 26, 2013, ZionSolutions, LLC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

Per 10 CFR 50.82(a)(8)(v),

The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.

Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.