UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406
-2713 August 31, 2016 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)
Dear Mr. Hanson:
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid
-cycle performance review of Three Mile Island Nuclear Station, Unit 1
. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 201 5, through June 30, 201 6. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Three Mile Island Nuclear Station, Unit 1
, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Three Mile Island Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 201 8. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events," and Order EA
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans."
In Staff Requirements Memorandum
- SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
-Baselining of Agency Activities,"
(ADAMS Accession # ML16104A158)
the Commission approved the NRC staff recommendation to discontinue the formal mid
-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue
end-of-cycle assessment letters.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337
-5046 with any questions you have regarding this letter.
Sincerely,/RA/
Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects
Docket No.
50-289 License No.
Enclosure:
Inspection Plan
ML162135A334 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME AZiedonis/AZ SShaffer/SS SKennedy/SK DATE 08/29/2016 08/17/2016 08/29/2016 Letter to Mr. Bry an Hanson from Silas R. Kennedy dated August 31, 2016.
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)
DISTRIBUTION w/encl: (via e-mail) DDorman, ORA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP SElkhiamy, DRP MHenrion, DRP AZiedonis, DRP, SRI (Acting SRI ends 9/3)
BLin, DRP, RI ADiaz, DRP, AA JBowen, RI, OEDO
RidsNrrPMThreeMileIsland Resource RidsNrrDorlLpl1
-2 Resource ROPReports Resource RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource
Page 1 of 2 08/29/2016 13:39:14Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteThree Mile IslandInspection / Activity Plan 07/01/2016
-06/30/2018711110T-TRIENNIAL HEAT SINK 11 IPHeat Sink Performance7111107T07/18/2016 07/22/201671124-RAD SAFETY INSPECTION 11 IPRadiation Monitoring Instrumentation71124.0508/08/2016 08/12/201671124-RAD SAFETY INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/14/201611/18/2016 1 IPOccupational ALARA Planning and Controls71124.0211/14/201611/18/2016 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/14/201611/18/2016 1 IPOccupational Dose Assessment71124.0411/14/201611/18/2016 1 IPOccupational Exposure Control Effectiveness71151-OR0111/14/201611/18/20166/26EXAM-TMI INITIAL OL EXAM 41 FY17-TMI INITIAL OPERATOR LICENSING EXAM U0194405/29/2017 06/02/2017 1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U0194406/26/2017 07/07/20177111105T-TRIENNIAL FIRE PROTECTION 41 IPFire Protection [Triennial]7111105T01/23/2017 01/27/2017 1 IPFire Protection [Triennial]7111105T02/06/2017 02/10/20177111111B-TMI REQUAL INSP WITH P/F RESULTS 21 IPLicensed Operator Requalification Program7111111B03/13/2017 03/17/2017 EP-EP EXERCISE EVALUATION 41 IPExercise Evaluation711140104/10/2017 04/14/2017 1 IPPerformance Indicator Verification7115104/10/2017 04/14/201771124-HP INSPECTION 11 IPOccupational ALARA Planning and Controls71124.0205/08/2017 05/12/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/2017 05/12/2017 1 IPOccupational Dose Assessment71124.0405/08/2017 05/12/2017 1 IPRadiation Monitoring Instrumentation71124.0505/08/2017 05/12/201771124-REMP11 IPRadiological Environmental Monitoring Program71124.0707/24/2017 07/28/2017 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 07/24/2017 07/28/201771124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/11/2017 09/15/201771124-HP INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/25/2017 09/29/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/29/2016 13:39:14Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteThree Mile IslandInspection / Activity Plan 07/01/2016
-06/30/201871124-HP INSPECTION 11 IPOccupational ALARA Planning and Controls71124.0209/25/2017 09/29/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/25/2017 09/29/2017 1 IPOccupational Dose Assessment71124.0409/25/2017 09/29/20177111108P-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P09/25/2017 10/06/201771124-HP INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 1 IPOccupational ALARA Planning and Controls71124.0211/13/201711/17/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 1 IPOccupational Dose Assessment71124.0411/13/201711/17/2017 1 IPOccupational Exposure Control Effectiveness71151-OR0111/13/201711/17/2017 EP-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140203/05/2018 03/09/2018 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140303/05/2018 03/09/2018 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/05/2018 03/09/2018 1 IPPerformance Indicator Verification7115103/05/2018 03/09/201871124-RAD SAFETY INSP 11 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/12/2018 02/16/2018 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 02/12/2018 02/16/20187111121-CDBI61 IPComponent Design Bases Inspection711112102/26/2018 03/02/2018 1 IPComponent Design Bases Inspection711112103/12/2018 03/16/2018 1 IPComponent Design Bases Inspection711112103/26/2018 03/30/201871152B-PI&R BIENNIAL 11 IPProblem Identification and Resolution71152B04/30/2018 05/04/2018 1 IPProblem Identification and Resolution71152B05/14/2018 05/18/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.