Updated Inspection Plan for Surry Power Station, Units 1 and 2 - Report 05000280/2017005 and 05000281/2017005
ML17233A198
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/21/2017
From: Masters A D
NRC/RGN-II/DRP/RPB5
To: Stoddard D G
Virginia Electric & Power Co (VEPCO)
References
IR 2017005
Download: ML17233A198 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 August 21, 2017 Mr. Daniel President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT: UPDATED INSPECTION PLAN FOR SURRY POWER STATION, UNITS 1 AND 2

- REPORT 05000 280/2017005 AND 05000 281/2017005

Dear Mr. Stoddard:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Surry Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security

-related inspections, which will be sent via separate, non

-publicly available

, correspondence.

Additionally, the NRC plans on conducting two non-ROP baseline inspections which include an initial license examination and Post Approval License Renewal Phase 4.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." Please contact me at 404

-997-4465 with any questions you may have regarding this letter.

Sincerely,/RA/ Anthony D. Masters, Chief Reactor Projects Branch 5 Division of Reactor Projects

Docket Nos.: 50-280, 50-281 License Nos.:

DPR-32, DPR-37

Enclosure:

Surry Inspection

/ Activity Plan (09/01/2017

- 06/30/2019)

ML OFFICE RII/DRP RII/DRP RII/DRP NAME BBishop SNinh AMasters DATE 8/15/2017 8/15/2017 8/ 21/2017 Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteSurryInspection / Activity Plan 09/01/2017

-06/30/2019 Page 1 of 2 08/21/2017 10:02:36DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)

71,2 IPDesign Bases Assurance Inspection (Teams)7111121M08/28/2017 09/01/2017OL EXAM-INITIAL LICENSE EXAM PREP 31 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES V2350210/02/2017 10/06/2017OL EXAM-INITIAL LICENSE EXAM 31 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES V2350210/30/201711/10/2017 RP-RP PUBLIC BASELINE INSPECTION 21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/27/2017 12/01/2017 1,2 IPRadiological Environmental Monitoring Program71124.0711/27/2017 12/01/2017 1,2 IPPerformance Indicator Verification7115111/27/2017 12/01/2017 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 81,2 IPFire Protection [Triennial]7111105T02/26/2018 03/01/2018 1,2 IPFire Protection [Triennial]7111105T03/12/2018 03/16/2018 EP-EP PROGRAM INSPECTION 31,2 IPAlert and Notification System Testing711140204/09/2018 04/13/2018 1,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140304/09/2018 04/13/2018 1,2 IPEmergency Action Level and Emergency Plan Changes711140404/09/2018 04/13/2018 1,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140504/09/2018 04/13/2018 1,2 IPPerformance Indicator Verification7115104/09/2018 04/13/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/30/2018 05/04/2018 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/30/2018 05/04/2018 EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR 31,2 IPDesign Bases Assurance Inspection (Programs)7111121N06/18/2018 06/22/2018 1,2 IPDesign Bases Assurance Inspection (Programs)7111121N07/09/2018 07/13/2018 1,2 IPDesign Bases Assurance Inspection (Programs)7111121N07/23/2018 07/27/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 51,2 IPProblem Identification and Resolution71152B09/10/2018 09/14/2018 1,2 IPProblem Identification and Resolution71152B09/23/2018 09/27/2018 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteSurryInspection / Activity Plan 09/01/2017

-06/30/2019 Page 2 of 2 08/21/2017 10:02:36 RP-RP OCCUPATIONAL - WEEK 1 31,2 IPRadiological Hazard Assessment and Exposure Controls71124.0111/05/201811/09/2018 1,2 IPOccupational ALARA Planning and Controls71124.0211/05/201811/09/2018 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/05/201811/09/2018 1,2 IPOccupational Dose Assessment71124.0411/05/201811/09/2018 1,2 IPRadiation Monitoring Instrumentation71124.0511/05/201811/09/2018 1,2 IPOccupational Exposure Control Effectiveness71151-OR0111/05/201811/09/2018 1,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/05/201811/09/2018 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018 RP-RP OCCUPATIONAL - WEEK 2 21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0111/26/201811/30/2018 1,2 IPOccupational ALARA Planning and Controls71124.0211/26/201811/30/2018 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/26/201811/30/2018 1,2 IPOccupational Dose Assessment71124.0411/26/201811/30/2018 1,2 IPRadiation Monitoring Instrumentation71124.0511/26/201811/30/2018 1,2 IPOccupational Exposure Control Effectiveness71151-OR0111/26/201811/30/2018 1,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/26/201811/30/2018 LR-POST-APPROVAL LR PHASE 4 21,2 IPPost-Approval Site Inspection for License Renewal 7100301/28/2019 02/01/2019 MODS-EVALUATIONS OF CHANGES, TESTS AND EXPERI 31,2 IPEvaluations of Changes, Tests, and Experiments7111117T04/22/2019 04/26/2019 RP-RP PUBLIC 21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/20/2019 05/24/2019 1,2 IPRadiological Environmental Monitoring Program71124.0705/20/2019 05/24/2019 1,2 IPOccupational Exposure Control Effectiveness71151-OR01 05/20/2019 05/24/2019 1,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 05/20/2019 05/24/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.