IR 05000277/2014001

From kanterella
Revision as of 13:39, 14 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
ROP 15 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277/2014001 and 05000278/2014001)
ML15062A180
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/04/2015
From: Bower F L
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Nuclear
BOWER, FL
Shared Package
ML15049A477 List:
References
IR 2014001
Download: ML15062A180 (5)


Text

March 4, 2015

Mr. Bryan Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555

SUBJECT: ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION (REPORT 05000277/2014001 AND 05000278/2014001)

Dear Mr. Hanson:

On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you ssment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to the baseline inspection program t Fuel Storage Installation at Operating The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, -Design--12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site is being coordinated for the week of June 22, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. From January 1 to December 31, 2014, the NRC issued one traditional escalated enforcement action associated with the violation found in the inspection report 07200029/14-008 (ML14307A797). Therefore, the NRC plans to conduct IP -up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirto follow-up on this violation. In accordance with Title 10 of the Code of Federal RegulationsPublic Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,/RA/ Fred L. Bower, III, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56

Enclosure:

Peach Bottom Atomic Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML15062A180 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber/ GSB FBower/ FLB DATE 02/19/15 02/ 19 /15 Page 1 of 201/26/201509:41:20Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SitePeach BottomInspection / Activity Plan01/01/2015-06/30/20163/23EXAM-INITIAL OL EXAM3 2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAMU0191102/23/201502/27/2015 2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAMU0191103/23/201504/03/20157111111B-REQUAL INSP W/ P/F RESULTS2 2,3 IPLicensed Operator Requalification Program7111111B03/23/201503/27/2015EP-EP PROGRAM INSPECTION1 2,3 IPAlert and Notification System Testing711140203/09/201503/13/2015 2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140303/09/201503/13/2015 2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/09/201503/13/2015TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION4 2,3 IPFire Protection [Triennial]7111105T03/16/201503/20/2015 2,3 IPFire Protection [Triennial]7111105T03/30/201504/03/201571152B-PI&R - BIENNIAL5 2,3 IPProblem Identification and Resolution71152B04/06/201504/10/2015 2,3 IPProblem Identification and Resolution71152B04/20/201504/24/2015ISFSI-ISFSI LOADING INSPECTION1 2,3 IPOperation Of An ISFSI6085505/11/201505/15/2015 2,3 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.105/11/201505/15/2015RS7-71124.071 2,3 IPRadiological Environmental Monitoring Program71124.0706/22/201506/26/201571124.08-RADWASTE1 2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0807/20/201507/24/2015RS45-71124.03, .04, .051 2,3 IPOccupational Dose Assessment71124.0407/20/201507/24/2015 2,3 IPRadiation Monitoring Instrumentation71124.0507/20/201507/24/20157111108G-U3 INSERVICE INSPECTION1 3 IPInservice Inspection Activities - BWR7111108G09/14/201509/18/2015RS123-71124.01, .02, .031 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0109/28/201510/02/2015 2,3 IPOccupational ALARA Planning and Controls71124.0209/28/201510/02/2015 2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/28/201510/02/2015 2,3 IP71151-OR0109/28/201510/02/2015 2,3 IP71151-PR0109/28/201510/02/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 201/26/201509:41:20Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SitePeach BottomInspection / Activity Plan01/01/2015-06/30/20167111117T-PERMANENT PLANT MODIFICATIONS3 2,3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T01/25/201601/29/2016 2,3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T02/08/201602/12/2016EP-EP EXERCISE EVALUATION4 2,3 IPExercise Evaluation711140104/25/201604/29/2016RS1234-HP INSPECTION1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/2016 2,3 IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/2016 2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/07/201603/11/2016 2,3 IPOccupational Dose Assessment71124.0403/07/201603/11/20167111107T-TRIENNIAL HEAT SINK1 2,3 IPHeat Sink Performance7111107T06/13/201606/17/2016RS567-HP TEAM INSPECTION3 2,3 IPRadiation Monitoring Instrumentation71124.0506/20/201606/24/2016 2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/20/201606/24/2016 2,3 IPRadiological Environmental Monitoring Program71124.0706/20/201606/24/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.