IR 05000333/2015005

From kanterella
Revision as of 13:15, 6 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Mid-Cycle Assessment Letter for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2015005)
ML15239A699
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/01/2015
From: Scott M L
Division Reactor Projects I
To: Brian Sullivan
Entergy Nuclear Northeast
Burritt A L
References
IR 2015005
Download: ML15239A699 (6)


Text

September 1, 2015

Mr. Brian Sullivan Site Vice President Entergy Nuclear Northeast James A. Fitzpatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2015005)

Dear Mr. Sullivan:

On August 12, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at FitzPatrick during the most recent quarter was within the Regulatory Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low safety significance (Green) and one PI was of low to moderate safety significance (White) in the Initiating Events cornerstone. Specifically, the "Unplanned Power Changes per 7,000 Critical Hours" PI exceeded the Green-to-White threshold value in the fourth quarter of 2012. In the fourth quarter of 2014, the NRC completed a review of the White PI using Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area." The results of this inspection were documented in the fourth quarter integrated inspection report 05000333/2014005, dated February 6, 2015 (ADAMS Accession No. ML15037A280). The NRC concluded that the corrective actions taken, which included replacement of the condenser tubes, were adequate to preclude repetition of the unplanned power changes and were sufficient to meet the inspection objectives. The PI is currently White and will continue to be a White ROP Action Matrix input until the PI results allow it to transition below the Green-to-White threshold. The NRC will notify you via separate correspondence when the plant will transition to the Licensee Response Column.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure 60855, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," Temporary Instruction (TI) 2515/190, "Inspection of the Licensee's Proposed Interim Actions as a Result of the Near-term Task Force Recommendation 2.1 Flooding Reevaluation," and TI 2515/191, "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The onsite component at your site has been planned to occur the week of May 2, 2016. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Arthur Burritt at (610)337-5069 with any questions you have regarding this letter.

Sincerely,/RA/ Michael L. Scott, Director Division of Reactor Projects Docket No. 50-333 License No. DPR-59

Enclosure:

FitzPatrick Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML15239A699 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME TSetzer/TCS ABurritt/ALB MScott/MLS DATE 8/19/15 8/19/15 8/21/15 Page 1 of 308/18/201513:09:05Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteFitzPatrickInspection / Activity Plan07/01/2015-06/30/20177111107T-TRIENNIAL HEAT SINK11 IPHeat Sink Performance7111107T08/10/201508/14/2015TI-190-NTTF 2.1 QUESTIONS FLOODING21 IPInspection of Interim Actions of Near-Term Task Force Recommendation 2.1 Flooding Reevaluations2515/19009/21/201509/25/201571124-RAD SAFETY INSPECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/14/201509/18/20151 IPOccupational ALARA Planning and Controls71124.0209/14/201509/18/20151 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/14/201509/18/20151 IPOccupational Dose Assessment71124.0409/14/201509/18/2015ISFSI-ISFSI OPERATIONAL INSPECTION11 IPOn-Site Fabrication Of Components And Construction On An ISFSI6085310/05/201510/09/20151 IPOperation Of An ISFSI6085510/05/201510/09/20151 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.110/05/201510/09/2015EP-EP EXERCISE51 IPExercise Evaluation - Hostile Action (HA) Event711140710/19/201510/23/20151 IPExercise Evaluation - Scenario Review711140810/19/201510/23/20153/7EXAM-INITIAL OL EXAM41 FY16-FITZ INITIAL OPERATOR LICENSING EXAMU0193202/15/201602/19/20161 FY16-FITZ INITIAL OPERATOR LICENSING EXAMU0193203/07/201603/11/201671124-RAD SAFETY INSP11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/16/201511/20/20151 IPOccupational ALARA Planning and Controls71124.0211/16/201511/20/20151 IPRadiation Monitoring Instrumentation71124.0511/16/201511/20/20157111121P-CDBI PROGRAM INSPECTION31 IPComponent Design Bases Inspection711112102/22/201602/26/20167111111B-FITZ REQUAL INSP WITH P/F RESULTS21 IPLicensed Operator Requalification Program7111111B04/25/201604/29/201671124-RAD SAFETY INSPECTION11 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0604/04/201604/08/20161 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0104/04/201604/08/20167111121T-CDBI TEAM INSPECTION51 IPComponent Design Bases Inspection711112104/11/201604/15/20161 IPComponent Design Bases Inspection711112104/25/201604/29/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 308/18/201513:09:05Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteFitzPatrickInspection / Activity Plan07/01/2015-06/30/201771124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0805/16/201605/20/201671124-RAD SAFETY INSPECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0106/13/201606/17/20161 IPOccupational ALARA Planning and Controls71124.0206/13/201606/17/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0306/13/201606/17/20161 IPOccupational Dose Assessment71124.0406/13/201606/17/201671152BI-PI&R BIENNIAL11 IPProblem Identification and Resolution71152B07/18/201607/22/20161 IPProblem Identification and Resolution71152B08/01/201608/05/2016EP-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140207/25/201607/29/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140307/25/201607/29/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140507/25/201607/29/201671124-RAD SAFETY INSPECTION11 IPRadiation Monitoring Instrumentation71124.0508/22/201608/26/20167111108G-INSERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G09/26/201609/30/201671124-RAD SAFETY INSPECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/26/201609/30/20161 IPOccupational ALARA Planning and Controls71124.0209/26/201609/30/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/26/201609/30/20161 IPOccupational Dose Assessment71124.0409/26/201609/30/20161 IPRadiation Monitoring Instrumentation71124.0509/26/201609/30/20161 IPOccupational Exposure Control Effectiveness71151-OR0109/26/201609/30/201671124-HP INSPECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0104/24/201704/28/20171 IPOccupational ALARA Planning and Controls71124.0204/24/201704/28/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/24/201704/28/2017TI-191-FUKUSHMIA LESSONS-LEARNED11 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19105/15/201705/19/20177112407-REMP/PI11 IPRadiological Environmental Monitoring Program71124.0706/05/201706/09/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0106/05/201706/09/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 3 of 308/18/201513:09:05Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteFitzPatrickInspection / Activity Plan07/01/2015-06/30/2017ISFSI-ISFSI LOADING CAMPAIGN INSPECTION11 IPOperation Of An ISFSI6085506/12/201706/16/20171 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.106/12/201706/16/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.