TAC:55476
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Request for: Approved, Closed | |
Initiation
Questions Answers Results Other: ML113201659, ML19211A683, ML19250A799, ML19260C541, ML19270H670, ML19305D654, ML19309F147, ML19338D111, ML19339A494, ML19340C533, ML19345A918, ML19345E813, ML19347C731, ML19350C136, ML19350C628, ML20002D280, ML20004E248, ML20008F373, ML20008F375, ML20009A583, ML20009C950, ML20009E854, ML20009E864, ML20037D431, ML20037D434, ML20037D461, ML20090D398 | |
| From | |
MONTHYEARML19250A7991979-10-17017 October 1979
[table view]Commits to Implement Requirements of NUREG-0578 for Followup Actions to TMI-2 Accident.Forwards Description of Actions Already Taken,Planned Actions & Expected Implementation Dates ML19211A6831979-12-14014 December 1979 Notifies That Util Will Be in Compliance by 800131 W/Lessons Learned Task Force Recommendations Re Relief & Safety Valves Direct Position Indication & Inadequate Core Cooling Detection Instrumentation ML19270H6701979-12-28028 December 1979 Submits Info Re Auxiliary Feedwater Sys for TMI Lessons Learned Task Force Recommendations 2.1.7a & 2.1.7b.Forwards Electrical,Flow & Logic Diagrams Available in Central Files ML19257A5341979-12-31031 December 1979 Forwards Application for Amend to Licenses DPR-42 & DPR-60, Changing Auxiliary Feedwater Sys Tech Specs ML19260C5411979-12-31031 December 1979 Forwards Rept on Implementation of TMI Lessons Learned Task Force Recommendations Re Emergency Power Supply,Relief & Safety Valve Testing & Direct Position Indication of Relief & Safety Valves ML19305B3431980-03-13013 March 1980 Supplements Re Lessons Learned Task Force Implementation.Includes Info Re Emergency Power Supply, Direct Position Indication of Relief & Safety Valves & Instrumentation for Inadequate Core Cooling ML19305D6541980-04-11011 April 1980 Forwards Addl Info Re Implementation of short-term Lessons Learned Task Force Recommendations ML19309F1471980-04-25025 April 1980 Requests NRC Review of Proposed Implementation of short-term Lessons Learned Task Force Recommendations Re Item 2.1.6.b, Plant Shielding Review, Item 2.1.9, Reactor Vessel Head Vent, & Item 2.2.26, Onsite Technical Support Ctr ML19338D1111980-09-12012 September 1980 Notifies of Delay Until 801114 for Submittal of Proposed Tech Specs for Lessons Learned Category a Requirements, Requested by NRC ML19339A4941980-10-29029 October 1980 Responds to NRC Re Interim Criteria for Shift Staffing.Requirements Outlined Have Been Implemented Re Administrative Procedures,Movement of Key Individuals About the Plant & Overtime Work ML19340C5331980-11-13013 November 1980 Describes Status of Environ Qualification Deficiency Re Namco EA-180 Limit Switch Installation Discovered During IE Bulletin 79-01B Investigations.Matl Necessary to Upgrade Switch Installation Has Been Ordered ML19345A9181980-11-20020 November 1980 Requests Relief from TMI Action Plan Implementation Schedule of NUREG-0737,Item II.F.2,re Final Instrumentation for Detection of Inadequate Core Cooling.Affidavit Encl ML19340E0211980-12-15015 December 1980 Notification of 801112 Meeting W/Util Re Draft Emergency Plan.Trip Rept Encl ML19340D3171980-12-18018 December 1980 Responds to NRC 801024 Request for Addl Auxiliary Feedwater Sys Info.Specific Responses,Related Tables & Drawings & Correction to Util Encl ML19340D3331980-12-19019 December 1980 Application for Amend of Licenses DPR-42 & DPR-60,changing Tech Specs Re TMI Lessons Learned Category a Procedural & Equipment Requirements ML19340D3341980-12-19019 December 1980 Proposed Changes to Tech Specs Sections 3,4 & 6 Re TMI Lessons Learned Category a Procedural & Equipment Requirements ML19340D3311980-12-19019 December 1980 Forwards Application for Amend of Licenses DPR-42 & DPR-60, Changing Tech Specs Re TMI Lessons Learned Category a Procedural & Equipment Requirements.Fee Encl ML19347C7311980-12-30030 December 1980 Forwards Commitments to Hardware,Procedural & Organizational Implementation Requirements of NUREG-0737.Implementation Dependent on Equipment Availability & Firm Regulatory Position ML20002D2801981-01-16016 January 1981 Forwards Rept of ECCS outages,1976-80,per NUREG-0737,Item II.K.3.17.ECCS Outage Frequency Does Not Constitute Excessive Unavailability.No Tech Spec Changes Are Warranted ML1132016591981-01-30030 January 1981 Forwards Info Re post-TMI Requirements.Revised Emergency Plan & Meteorological Sys Description Will Be Mailed by Wk of 810201.Shift Technical Advisor,Containment Pressure Setpoint,Eccs Sys Outages & Control Room Info Encl ML19345E8131981-01-30030 January 1981 Forwards Info Re Shift Technical Advisor & Control Room Habitability for NRC Review of Implementation of TMI Action Plan Requirements Per NUREG-0737 ML20037D4341981-02-28028 February 1981 Background Info for Reactor Vessel Head Vent Operation, Revision 0 ML20037D4611981-02-28028 February 1981 Reactor Vessel Head Vent Operation, Revision 0 ML20008F3751981-03-0202 March 1981 Notice of Issuance & Availability of Amends 46 & 40 to Licenses DPR-42 & DPR-60,respectively ML20008F3731981-03-0202 March 1981 Amends 46 & 40 to Licenses DPR-42 & DPR-60,respectively, Incorporating New Requirements for Instruments & Equipment & Shift Manning,Resulting from NRC Assessment of TMI-2 Accident ML19350C1361981-03-27027 March 1981 Informs That Implementation of NUREG-0737,post-TMI Item I.C.5 Requirement,Will Be Delayed Until 810701 Due to Mgt Procedures Being Written in Series Rather than in Parallel. Procedures Build on Requirements Per Higher Level Directive ML19350C6281981-03-31031 March 1981 Advises of Delay in Implementation of NUREG-0737 post-TMI Requirements Due to Unavailability of Variance Computer Hardware.Projected Inservice Date Is Now 810501 ML20009E8641981-05-31031 May 1981 Revised Main Control Room Habitability Study ML20004E2481981-06-0808 June 1981 Forwards Addl Info Re post-TMI Requirements for Emergency Operations Facility Per 810408 Commitment.Includes Descriptions of Emergency Response Facility Implementation & Technical Support Ctr ML20037D4311981-07-0606 July 1981 Forwards Background Info for Reactor Vessel Head Vent Operation, Revision 0 & Reactor Vessel Head Vent Operation, Revision 0 in Response to NUREG-0737,Items II.B.1 & II.D.1 ML20009A5831981-07-0606 July 1981 Informs That Util Will Provide NRC W/Description of C-E Heated Junction Thermocouple Sys by 810901 Upon Demonstration of Feasibility.Submittal Will Include Info Re NUREG-0737,Item II.F.2 ML20009D0121981-07-0808 July 1981 Discusses Review of 790430,0518 & 0622 Responses to IE Bulletin 79-06A & 79-06A,Revision 1.Encl Safety Evaluation Completes TMI Item II.K.1 & Bulletins.Responses to IE Bulletin 79-06C Will Be Reviewed as Part of Item II.K.3.5 ML20009D0151981-07-0808 July 1981 Safety Evaluation Re Applicant Responses to IE Bulletins 79-06A & 79-06A,Revision 1.Actions Taken by Licensee Demonstrate Understanding of Concerns & Implications of TMI-2 Accident ML20009C9501981-07-10010 July 1981 Order Confirming Licensee Commitments Re post-TMI Related Requirements of NUREG-0737.Requests That Applicant Satisfy Specific Requirements of Nureg,Described in Attachment, within 30 Days ML20009E8541981-07-20020 July 1981 Forwards Revised Main Control Room Habitability Study, Per NUREG-0737,Item III.D.3.4.Revision Corrects Errors in Radiological Analysis Assumptions.Mods Recommended in Toxic Chemical Study Will Be Scheduled for Completion by 830101 ML20090D3981984-06-20020 June 1984 Toxic Chemical Study ML20090D3651984-07-0909 July 1984 Forwards Suppl 1 to 840410 Application for Amend to Licenses DPR-42 & DPR-60,changing Tech Specs to Delete Requirement for Ammonia,Hydrocloric Acid & Formaldehyde Gas Detection Sys in Main Control Room,Per NUREG-0737,Item III.D.3.4 ML20090D3761984-07-0909 July 1984 Suppl 1 to 840410 Application for Amend to Licenses DPR-42 & DPR-60,changing Tech Specs to Delete Requirement for Ammonia,Hydrocloric Acid & Formaldehyde Gas Detection Sys in Main Control Room,Per NUREG-0737,Item III.D.3.4 1980-09-12 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:55476&oldid=5497840"