ML021680081

From kanterella
Revision as of 17:56, 16 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Technical Requirements Manual, Volume I
ML021680081
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/03/2002
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021680081 (8)


Text

To: 00935 US NRC DOCUMENT CNTRL DESK DETROIT EDISON -

FERMI 2

AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 06/03/02 PAGE 1

WASHINGTON, DC 20555 Media:

8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 55 11 IR 06/03/02 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.

CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166.

(734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: e49968 Vo I

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 55 dated 06/03/02 Immediately, upon receipt of the item(s) below, please insert and/or remove the documents indicated. Please destroy the removed documents. Please be sure that Revision 54 dated 3/22/02 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Immediately following Title Page 3.6 Containment Systems Title Page Rev 54 03/22/02 List of Effective Pages LEP-I through LEP-4 Rev 54 03/22/02 Page TRM 3.6-4 Rev 31 10/99 Title Page Rev 55 06/03/02 List of Effective Pages LEP-1 through LEP-4 Rev 55 06/03202 Page TRM 3.6-4 Rev 55 06/02 END

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMA4 TION DTC: TMTRM File: 1754 DSN: TRM VOL I Rev: 55 Date: 06/03/02 Recipient 5*

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL LIST OF EFFECTIVE PAGES Revision Page Revision TRM i TRM ii TRM iii TRM iv TRM v TRM vi TRM 1.0-a TRM 1.0-1 TRM 2.0-1 TRM 3.0-a TRM 3.0-1 TRM 3.0-2 TRM 3.0-3 TRM 3.0-4 TRM 3.1-a TRM 3.1-1 TRM 3.2-1 TRM 3.3-a TRM 3.3-b TRM 3.3 - c TRM 3.3-d TRM 3.3-1 TRM 3.3-2 TRM 3.3-3 TRM 3.3-4 TRM 3.3-5 TRM 3.3-6 TRM 3.3-7 TRM 3.3-8 TRM 3.3-9 TRM 3.3-10 TRM 3.3-11 TRM 3.3-12 TRM 3.3-13 TRM 3.3-14 TRM 3.3-15 TRM 3.3-16 TRM 3.3-17 TRM 3.3-18 TRM 3.3-19 TRM 3.3-20 TRM 3.3-21 TRM 3.3-22 TRM 3.3-23 TRM 3.3-24 TRM 3.3-25 TRM 3.3-26 TRM 3.3-27 TRM 3.3-28 TRM 3.3-29 TRM 3.3-30 TRM 3.3-31 TRM Vol.

I Revision 31 Revision 31 Revision 31 Revision 34 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 54 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 34 Revision 39 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 52 Revision 31 Revision 31 Revision 39 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM 3.3-32 TRM 3.3-33 TRM 3.3-34 TRM 3.3-35 TRM 3.3-36 TRM 3.3-37 TRM 3.3-38 TRM 3.3-39 TRM 3.3-40 TRM 3.3-41 TRM 3.3-42 TRM 3.3-43 TRM 3.3-44 TRM 3.3-45 TRM 3.3-46 TRM 3.3-47 TRM 3.3-48 TRM 3.3-49 TRM 3.4-a TRM 3.4-1 TRM 3.4-la TRM 3.4-lb TRM 3.4-2 TRM 3.4-3 TRM 3.4-4 TRM 3.4-5 TRM 3.4-6 TRM 3.4-7 TRM 3.4-8 TRM 3.4-9 TRM 3.4-10 TRM 3.5-1 TRM 3.6-a TRM 3.6-1 TRM 3.6-2 TRM 3.6-3 TRM 3.6-4 TRM 3.6-5 TRM 3.6-6 TRM 3.6-7 TRM 3.6-8 TRM 3.6-9 TRM 3.6-10 TRM 3.6-11 TRM 3.6-12 TRM 3.6-13 TRM 3.6-14 TRM 3.6-15 TRM 3.6-16 TRM 3.6-17 TRM 3.6-18 TRM 3.6-19 Revision 31 Revision 31 Revision 31 Revision 31 Revision 41 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 45 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 36 Revision 34 Revision 34 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 55 Revision 31 Revision 33 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 REV 55 06/03/02 Page VOL I LEP-I

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Revision Page Revision TRM 3.6-20 TRM 3.6-21 TRM 3.6-22 TRM 3.6-23 TRM 3.6-24 TRM 3.6-25 TRM 3.6-26 TRM 3.6-27 TRM 3.6-28 TRM 3.6-29 TRM 3.6-30 TRM 3.6-31 TRM 3.6-32 TRM 3.6-33 TRM 3.6-34 TRM 3.6-35 TRM 3.7-a TRM 3.7-b TRM 3.7-1 TRM 3.7-2 TRM 3.7-3 TRM 3.7-4 TRP 3.7-5 TRM 3.7-6 TRM 3.7-7 TRM 3.7-8 TRM 3.7-9 TRM 3.7-10 TRM 3.7-11 TRM 3.7-12 TRM 3.7-13 TRM 3.7-14 TRM 3.7-15 TRM 3.7-16 TRM 3.7-17 TRM 3.7-18 TRM 3.7-19 TRM 3.7-20 TRM 3.8-a TRIM 3.8-1

-RM 3.8-2 TRM 3.8-3 TRM 3.8-4 TRM 3.8-5 TRM 3.8-6 TRM 3.8-7 TRM 3.8-8 TRM 3.8-9 TRM 3.8-10 TRM 3.8-11 TRM 3.8-12 TRM 3.8-13 TRM Vol.

I Revision 31 Revision 31 Revision 31 Revision 31 Revision 47 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 44 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 50 Revision 50 Revision 50 Revision 50 Revision 50 Revision 50 Revision 31 Revision 31 TRM 3.8-14 TRM 3.8-15 TRM 3.8-16 TRM 3.8-17 TRM 3.8-18 TRM 3.9-a TRM 3.9-1 TRM 3.9-2 TRM 3.9-3 TRM 3.9-4 TRM 3.9-5 TRM 3.10-1 TRM 3.11-a TRM 3.11-1 TRM 3.12-a TRM 3.12-1 TRM 3.12-2 TRM 3.12-3 TRM 3.12-4 TRM 3.12-5 TRM 3.12-6 TRM 3.12-7 TRM 3.12-8 TRM 3.12-9 TRM 3.12-10 TRM 3.12-11 TRM 3.12-22 TRM 3.12-13 TRM 3.12-14 TRM 3.12-15 TRM 3.12-16 TRM 3.12-17 TRM 3.12-18 TRM 3.12-19 TRM 3.12-20 TRM 3.12-21 TRM 3.12-22 TRM 3.12-23 TRM 3.12-24 TRM 3.12-25 TRM 3.12-26 TRM 3.12-27 TRM 3.12-28 TRM 3.12-29 TRM 3.12-30 TRM 4.0-1 TRM 5.0-a TRM 5.0-1 TRM 5.0-2 TRM 5.0-3 TRM 5.0-4 TRM 5.0-5 Revision 46 Revision 31 Revision 31 Revision 43 Revision 33 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 53 Revision 53 Revision 53 Revision 31 Revision 40 Revision 40 Revision 31 Revision 49 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 REV 55 06/03/02 Page LEP-2

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Revision Page Revision TRM 5.0-6 TRM 5.0-7 TRM 5.0-8 TRM 5.0-9 TRM B1.0-1 TRM B2.0-1 TRM B3.0-1 TRM B3.0-2 TRM B3.0-3 TRM B3.0-4 TRM B3.0-5 TRM B3.0-6 TRM B3.0-7 TRM B3. 1-1 TRM B3.2-1 TRM B3.3.1-1 TRM B3.3.1-2 TRM B3.3.2-1 TRM B3.3.2-2 TRM B3.3.3-1 TRM B3.3.4-1 TRM B3.3.4-2 TRM B3.3.5-1 TRM B3.3.5-2 TRM B3.3.6-1 TRM B3.3.6-2 TRM B3.3.6-3 TRM B3.3.6-4 TRM B3.3.6-5 TRM B3.3.7-1 TRM B3.3.7-2 TRM B3.3.8-1 TRM B3.3.9-1 TRM B3.3.10-1 TRM B3.3.11-1 TRM B3.3.12-1 TRM B3.3.13-1 TRM B3.3.14-1 TRM B3.4.1-1 TRM B3.4.1-2 TRM B3.4.1-3 TRM B3.4.1-4 TRM B3.4.1-5 TRM B3.4.2-1 TRM B3.4.3-1 TRM B3.4.4-1 TRM B3.4.5-1 TRM B3.4.6-1 TRM B3.4.7-1 TRM B3.5-1 TRM B3.6.1-1 TRM B3.6.2-1 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 54 Revision 54 Revision 54 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 45 Revision 31 Revision 31 Revision 31 Revision 31 Revision 34 Revision 34 Revision 34 Revision 34 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM B3.6.3-1 TRM B3.6.4-1 TRM B3.6.5-1 TRM B3.6.6-1 TRM B3.6.7-1 TRM B3.6.8-1 TRM B3.7.1-1 TRM B3.7.2-1 TRM B3.7.3-1 TRM B3.7.4-1 TRM B3.7.4-2 TRM B3.7.5-1 TRM B3.7.6-1 TRM B3.7.7-1 TRM B3.7.8-1 TRM B3.7.9-1 TRM B3.7.9-2 TRM B3.8.1-1 TRM B3.8.2-1 TRM B3.8.3-1 TRM B3.8.4-1 TRM B3.8.5-1 TRM B3.8.6-1 TRM B3.9.1-1 TRM B3.9.2-1 TRM B3.9.3-1 TRM B3.9.4-1 TRM B3.10-1 TRM B3.11.1-1 TRM B3.12.1-1 TRM B3.12.2-1 TRM B3.12.3-1 TRM B3.12.4-1 TRM B3.12.5-1 TRM B3.12.6-1 TRM B3.12.7-1 TRM B3.12.8-1 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 43 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 44 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 REV 55 06/03/02 Page TRM Vol.

I LEP-3

FERMI 2 TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1

0 2

0 3

0 4

0 5

0 6

0 7

0 8

0 9

0 10 0

11 0

12 0

13 0

14 0

15 0

16 0

17 0

REV 55 06/03/02 TRM Vol.

I LEP-4

PCIVs TR 3.6.3 TABLE TR3.6.3-I (Page 2 of 22)

Primary Containment Isolation Valves MAXIMUM ISOLATION TIME FUNCTION (seconds)(u)

1.

Automatic Isolation Valves(a) (continued)

c.

Group 3 - Residual Heat Removal (RHR) System RHR Drywell Spray Isolation Valves Loop A: E1150-F016A 150 E1150-F021A 60 Loop B: E1150-FO16B 150 E1150-F021B 60 RHR Containment Cooling/Test Isolation Valves Loop A: E1150-F024A 45*'

Loop B: E1150-F024B 45*

RHR Suppression Pool Spray Isolation Valves Loop A: E1150-F027A 60 Loop B: EII50-F027B 60 RHR Suppression Pool Spray/Test Isolation Valves Loop A: E1150-F028A 45*

Loop B: E1i50-F028B 45*

d.

Group 4 - Residual Heat Removal Shutdown Cooling and Head Spray RHR Shutdown Cooling Suction Isolation Valves inboard:

E1150-F009 51 Outboard: EI!50-F008 51 RýR Reactor Pressure Vessel Head Spray Isolation Valves

nboard:

E1150-F022 36 Outboard: E1150-F023 120

e.

Group i - Core Spray System Core Spray Pump Flow Test Valves' Loop A: E2150-F015A 150 Loop 5: E2150-F015B 150 (continued)

"-o ensure LPC: response time of 72 seconds per OPL-4.

TRMI Vol.

i TRM 3.6-4 REV 55 06/02