ML082600515
| ML082600515 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/08/2008 |
| From: | Susquehanna |
| To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML082600515 (27) | |
Text
Sep.
08, 2008 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-44430 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 09/08/2008 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS
- FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 07/30/2008 ADD MANUAL TABLE OF CONTENTS DATE: 09/05/2008 CATEGORY:
DOCUMENTS TYPE: TRM2
/,00(
Sep.
08, 2008 Page 2
of 2
ID:
TEXT 3.7.7 ADD:
REV:
2 REMOVE:
REV:l CATEGORY:
DOCUMENTS TYPE: TRM2 ID:
TEXT LOES ADD:
REV:
47 REMOVE:
REV:46 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
09/05/2008 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 47 09/05/2008
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 13 01/31/2008
Title:
TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS/
TEXT 2.1 1
02/04/2005<; '/
Title:
PLANT PROGRAMS AND SETPOINTS PLANT
-PROGRAMIS/
TEXT 2.2 7
0523/200
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4
\\05/23/2008
Title:
APPLICABILITY TECHNICA REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT 3.1.1 i
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD-INJECTI'ONJ('AT WS-ARIT)
INSTRUMENTATION TEXT 3.1.2
\\
0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 3
04/09/2007
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 7
04/19/2007
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
- age-_
.of Report-Date: 09/05/08
SsE)ý
-;ý.,NUTAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL-UNIT 2 TEXT 3.3.1 0
11/19/2002'
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION 0
TEXT 3.3.2
Title:
INSTRUMENTATION 2
11/09/2007 SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
1i1/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION..
TEXT 3.3.4 5
05/23/2008
Title:
INSTRUMENTATION TRM POST-ACCIDENT.,MONITORING INSTRUMENTATION TEXT 3.3.5 0
1-1/1.k9,/20o02
Title:
INSTRUMENTATION-THIS PAGE INTENTIONALLY LEFT/BLANK.
TEXT 3.3.6 2
10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION: INSTRUMENTATION TEXT 3.3.7 1
11/q9/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEMý TEXT 3.3.8 1
10/2ý2/2003,
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 2
04/09/2007
ýTitle:. INSTRUMENTATION LPRIM UPSCALE.ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATIONIPUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003,
Title:
INSTRUMENTATION MVP ISOLATION, INSTRUMENTATION TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT' SYSTEM REACTORCOOLANT SYSTEM CHEMISTRY Page2' of 15 Report.Date: 09/05/08 Page 2,
of 15 Report Date: 09/05/08
S S-I W4A"NUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2" TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.5.1 0
11/19/2002 COOLANT*SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)-
1 12/14/2,004 COOLANT SYSTEM-REACTOR:RECIRCULATION FLOW AND 1
0'4k26/-2b06 COOLANT SYSTEM REACTOR'VESSEL MATERIALS 1
02'/04/2005 ROD LINE LIMIT
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/04/2007
Title:
ECCS ANDRCIC ECCS AND'`RCIC SYSTEMMONITORING INSTRUMENTATION, TEXT 3.5.3 0
11/19/2002*
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY tTO ADS TEXT 3.6.1 0
1i/19/-2002-
Title:
CONTAINMENT VENTING OR PURGING.:.-'...
TEXT 3.6.2 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL-VACUUM BREAKER TEXT 3.6.3 0
11/19/2002;
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION
ý POSITION INDICATION TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT-CLOSED' SYSTEMBOUNDARIES TEXT 3.7.1 0
/19202
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER 'SYSTEM (ESW)
SHUTDOWN
,of"
.Repor-iDate:
09/05/08..
Page 3 of 15 Report Date: 09/05/08
,'SSRS *WUMAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL' UNIT. 2 TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT-TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT 0-1 /,19/2002, SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 1
04/26/2006 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SYSTEMSý SPRAY AND SPRINKLER SYSTEMS 2
08/:18/200:5 SYSTEMS C02 SYSTEMS 1
04/2'6,/2i006.
SYSTEMS HALON SYSTEMS TEXT 3.7.3.5
Title:
PLANT SYSTEMS 1
04726/62006*
FIRE HOSE STATIONS". -ý : 1 7
TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT TEXT 3.7.4
Title:
PLANT TEXT 3.7.5.1
Title:
PLANT TEXT 3.7.5.2
Title:
PLANT 1
04/,26/2006:-
SYSTEMS YARD FIRE,,HYDRANTS'AND HYDRANT HOSE HOUSES 1
04/26/2006' SYSTEMS FIRE; RATED ASSEMBLIES' 7
11/09/2007 SYSTEMS FIRE DETECTION INSTRUMENTATION 1
04:/,26/2006 SYSTEMS SOLID RADWASTE, SYSTEM' 0
11/19,/2002 SYSTEMS MAIN CONDENSER1 OFFGAS HYDROGEN MONITOR-0A 11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Page4 of 15 Report Date: 09/05/Q8 Paýfe 4 '
Of 15 Report Date: 09/05/08
S~S2:11 14A\\MAIL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT,..2 TEXT 3.7.5.3 1
04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUPTANKS TEXT 3.7.6 2
06/27/2008
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION, TEXT 3.7.7 2
09/D5/2008..
Title:
PLANT SYSTEMS MAIN CONDENSER:OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6
0,6/21/2007
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1
08/28/-2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14`200.4
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS "(SFSPS)
TEXT 3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT 3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT 3.8.2.2
Title:
ELECTRICAL AUTOMATIC 2
02/04/,2-005 POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT.
DEVICES TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5 '-
Title:
ELECTRICAL 2
1:1/09/2,007.,
POWER MOTOR OPERATED VALVES,, (MOV), THERMAL OVERLOAD 2
12/,4/2904 POWER MOTOR OPERATED VALVES. (MOV)
THERMAL OVERLOAD 0
11/19/2002 POWER DIESEL GENERATOR.(<DO) -MAINTENANCE ACTIVITIES, 1
002/04/2005 POWER 24 VDC ELECTRICALi-SýBSYSTEM
_0<<
11/19/2002 POWER DEGRADED VOLTAGE PROTECTION.
PROTECTION PROTECTION,-
Page.5.
of 15 Report Date~ 09/05/08 Page 5 of 15 Report Date: 09/05/08
SSE'S IMMUAfLT Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0
11/19/2002
Title:
ELECTRICAL POWER,'EMERGENCY SWITCHGEARI ROOM COOLING TEXT 3.8.7 0
12/14/20016
'Title:
BATTERY MAINTENANCE AND :MONITORING PROGRAM, TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
1I1/19/-2002.
Title:
REFUELING OPERATIONS COMMUNICATIONS, TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM" TEXT 3.10.1 1
04/26-/2006'
Title:
MISCELLANEOUS-'SEALED:SOURCE CONTAMINATION TEXT 3.10.2 1
04/-0-9/2'007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS "IINSTRUMENTATION TEXT 3.10.3 1
04/26/200 6 Title ::MISdELLANEOUS, INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 1
08/28/2006
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)'
TEXT 3.11.1.1 1
04/A26;/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2
Title:
RADIOACTIVE EFFLUENTS TEXT 3.11.1.3-
Title:
--RADIOACTIVE EFFLUENTS' Page* 6 of 15 1
041'26/2006 LIQUID EFFLU:ENTS DOSE 1..
04/26/2006 LIQUID WASTE TREATMENT.SYSTEM Report Date: 09/05/08
-0 Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4
.Title: RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE' TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE TEXT 3.11.4.2
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
12/14/2004" LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3
04/26/20061 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26A2006 DOSE -. IODINE,
- TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0
11/19./:2002 GASEOUS,RADWASTE TREATMENT SYSTEM 3
11/14,/20Q6, VENTILATION EXHAUST,ý TREATMENT-SYSTEM 3
05/.02/A2,007 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1
04/26/20,06 TOTAL DOSE 3
04/26/2006 MONITORING PROGRAM -
2 04/26/200.6 LAND,.USE.CENSUS, TEXT 3.11.4.31 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM Page 7 of 15 Report Date: 09/05/08 Page 7 of '15 Report Date: 09/05/08
S SES -fflk'AL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/20068
Title:
LOADS CONTROL PROGRAM HEAVY LOADSREQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS'REQUIREMENTS-:
TEXT B3.0 4
05/23/2'008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION'(TRO)Y APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEM'BASES ANTICIPATED ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL, SYSTEM'BASES 'CONTROL ROD TRANSIENT' WITHOUT SCRAM ALTERNATE DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
ii/19/2002
Title:
REACTIVITY CONTROL SYSTfM 'BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
i1/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR).
TEXT B3.3.1 0
11/i9/2002
Title:
INSTRUMENTATION BASES RADIATION :M0ONITORING INSTRUMENTATION TEXT B3.3.2 1
11/09'/2007
Title:
,'INSTRUMENTATION 'BASES SEISMIC MONIt'ORING* 'INSTRUMENTATION TEXT B3.3.3 2
11/09/2007 Title.; :INSTRUMENTATION"BASES<-METEOROLOGICAL-MONITORING INSTRUMENTATION Page 8 of 15 Report Date: 09/05/
08
SES 2NANAI Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.4' 3
11/09/2007
Title:
INSTRUMENTATION BASES TRMPOST ACCIDENT MONITORING (PAM)
INSTRUMENTATION TEXT B3.3.5 2
11/09/2007:
Title:
INSTRUMENTATION BASESTHIS. PAGE :INTENTIONALLY LEFT BLANK1, TEXT B3.3.6 3
10/119/2005
Title:
INSTRUMENTATION BASES.TRM ISOLATIONACTUATION INSTRUMENTATION TEXT B3.3.7 1
-1/09/2007.
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTIONSYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INSTRUMENTATION.BASES TRM.RPS INSTRUMENTATION TEXT B3.3.9
Title:
- INSTRUMENTATION TEXT B3.3.10
Title:
INSTRUMENTATION TEXT B3.3.11
Title:
INSTRUMENTATION TEXT B3.4.1
Title:
04/10/2007 BASES LPRM UPSCALE ALARM INSTRUMENTATION 0
11/,19/2002 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/?2003 BASES MVP ISOLATION INSTRUMENTATION, 0
11/19/2002 SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES.STRUCTURALr-TNTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES.,HIGH/'LOW PRESSURE INTERFACELEAKAGEMONITOR
'TEXT B3.4.4
Title:
REACTOR COOLANT 11/19/2002 SYSTEM BASES-REACTOR RECIRCULATION FLOWAND ROD LINE LIMIT Page 9 of 15 Report Date: 09/05/08 Page 9 of 15 Report Date: 09/05/08
s §,E S, IANJA-L Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.5 0
11/1'9/2002.
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0
.1'/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING -INSTRUMENTATION TEXT B3.5.3 1
i1/09j/2007
Title:
ECCS AND RCIC BASES LONG'TERM NITROGEN SUPPLY TO'ADS-TEXT B3.6.1 0
1i/194/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRY'ELL VACUUM BREAKER-POSITION INDICATION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
-f2/14,/200 0
Title:
CONTAINMENT BASES-PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERV-ICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11'/19/.2002
Title:
PLANT SYSTEMS BASES ULTIMATE 'HEAT SINK'!(UHS)
GROUND WATER LEVEL TEXT B3.7.3.1 2
01/07-/2008
Title:
PLANT SYSTEMS BASES FIRE *SuPPESSION wATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
- °:-T*itr PLANT'-SYSTEMS BASES SPRAY-AND SPR-INKLER 'SYSTEMS Page 10 of 15 Report Date: 09/05/08
SSES" MA.NTAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3
Title:
PLANT TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 C02 SYSTEMS 1
04/26,/2006 HALON SYSTEMS, 1
04-/26/2006 FIRE HOSE STATIONS 1
04/26/2006 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES SYSTEMS BASES SYSTEMS-BASES SYSTEMS BASES
,SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
1/!19/2002 FIRE RATED ASSEMBLIES 1
01/12/2004 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SOLID RADWASTE SYSTEM 0
11/19/2002 MAIN-CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2.002 MAIN.CONDENSER.OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2,002 LIQUID HOLDUP TANKS-,.
2 06/27d2008 ESSW PUMPHOUSEVENTILATION TEXT B3.7.7 i2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 11 of 15 R
D9 ReportDate:' 09/05/08
_j
7' S~PSES I TJAL Manual Naine:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.8 3
06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS J:
TEXT B3.7.9 1
12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
-PLANT SYSTEMS BASES SPENT-FUEL STORAGE POOLS, TEXT B3.8.1 1
02/0'4/2005
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT.PENETRATION-CONDUCTOR*OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1
Title:
ELECTRICAL POWER CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL POWER AUTOMATIC 0
11,/f9/2002 BASES MOTOR OPERATED VALVES (MOV).THERMAL OVERLOAD 1
09/17/2004 PROTECTION BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
TEXT B3.8.3
Title:
ELECTRICAL 0
i1/19/2002 POWER BASES DIESEL-GENERATOR (DG)F'MAINTENANCE ACTIVITIES TEXT B3.8.4 0
I11.9/2002
Title:
ELECTRICAL POWER BASESý 24CVDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0
114,19/2002
Title:
ELECTRICAL POWER BASES DEGRADED, VOLTAGE PROTECTION TEXT B3.8.6 1
02/04/2005
Title:
ELECTRICAL POWERA'BASESEMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 0
12/1f4/2006
Title:
BATTERY MAINTENANCE`AND MONITORING" PROGRAM
- TEXT B3.9.1 0
11/19/2002
-,Title:-REFUELING OPERATIONS BASES-DECAY-TIME" Page 12 of 15 Report Date: 09/05/08
S E S :MANUAL~
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0
Title:
REFUELING OPERATIONS BASES TEXT B3.9.3 0
Title:
REFUELING OPERATIONS BASES 11/19/2002 COMMUNICATIONS 11/19/2002 REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCECONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TESTRPS INSTRUMENTATION TEXT B3.10.3 0
11/19/,2002
Title:
MISCELLANEOUS BASES INDEPENDENT,SPENT FUEL STORAGE INSTALLATION (ISFSI),
TEXT B3.10.4 0
11/19-/2002
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER,(LEFM)
TEXT B3.11.1.1
.Title:
RADIOACTIVE TEXT B3.11'.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0
11/19/.2002 BASES LIQUID,,EFFLUENTS CONCENTRATION, 0
i1/1.9/0021 BASES LIQUID EFFLUENTS DOSE,
0 11/19/20Q2 BASES LIQUIDWASTE TREATMENT SYSTEM 0
11/19/2002 BASES, LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS 0
11/19/2002 BASES*RADIOACTIVE-LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3-.11.2.1 1i 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE-Page 13 of 15.
Report' Date: 09/05/08 Page 13 of 15 Report Date:' 09/05/08
SSESM1AMTAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL iUNITT2 TEXT B3.11.2.2 0
11/1972002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE-- NOBLE GASES
- 1. 1,
ý -
- ý.
0
ý11.
fT ",
TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM 0
11./19/2002 BASES,,DOSE {-.'IODINE, :TRITIUM, AND. RADIONUCLIDES IN TEXT B3.11.2.4 0
11/19'/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS!RADWASTE-TREATMENT SYSTEM' TEXT B3.11.2.5 4
11/14/200,6
Title:
RADIOACTIVE EFFLUENTS BASES VENTIL-ATION,EXHAUST':TREATMENT 'SYSTEM<
TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 1
01.727/2004 BASES RADIOACTIVE GASEOUS'EFFLUENT'.MONITORING TEXT B3.11.3 0
1;171972002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE, TEXT B3.11.4.1 2
01/06/2006
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING.PROGRAM.
TEXT B3.11.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1
Title:
LOADS CONTROL PROGRAM 1
10/04/2007 BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
-LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS" Page 14 of 2~
Report Date: 09/05/08
.Page 14 of 15 Report Date: 09/05/08
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.1
Title:
TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
ADMINISTRATIVE CONTROLS.
0 ADMINISTRATIVE CONTROLS.
0 ADMINISTRATIVE CONTROLS 0
ADMINISTRATIVE CONTROLS 0
ADMINISTRATIVE CONTROLS.-
,09/27/2003 ORGANIZATION-09/27t/2003 REPORTABLE EVENT ACTION 09/27/2003 SAFETY-.LIMIT VIOLATION 09/27/2003 PROCEDURES &i.PROGRAMS 09/27/200,3 REPORTING-.REQUIREMENTS 09/27/2003 RADIATION PROTECTION PROGRAM 0
CONTROLS ADMINISTRATIVE ADMINISTRATIVE 0
09/27/2003 CONTROLS. TRAININGs' Page i~
of 1~5.
Report Date:
09/05/08 Page 15 of 15 Report Date: 09/05/08
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title TOC TABLE OF CONTENTS 1.0 USE AND APPLICATION Page TRM / 1.0-1, Page TRM / 1.0-2 Page.TRM / 1.0-3 2.0 3.0 3.1 3.2 3.3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM /3.0-2\\
Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROLC/SYSTEMS>
Page TRM / 3.1-1
\\
Pages TRM / 3.1"-2 through/TRM / 3.1-5 Pages TRM /o3/16 thrdugh TRM / 3.1-8 Pages TRM/ 3.19-and TRM / 3.1-9a Page TRM-/ 3.171i0>
CORE OPERATING LIMITS REPORT Page'TRM-/3.2-1
ýPages<)T*RM / 3.2-2 through TRM / 3.2-48 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 Page TRM / 3.3-9 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-11 a Effective Date 01/30/2008 08/31/1,998 10/04/2002 08/31/1998 08/31/1998 01/28/2005
-\\06/25/2002 6/4/12/1999
"/03/27/2007
/05/15/2008 12/03/2004 11/15/2004 03/27/2007 11/15/2004 11/15/2005
\\
-V 7'
/
04/14/2008 03/15/2002 11/30/2005 10131/2007 08/31/1998 03/27/2007 02/1-8/1999 02/18/1999 08/31/1998 03/30/2007 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 04/12/2007 12/17/1998 10/31/2007 06/02/2005 04/14/2008
--SUSQUEHANNA-UNIT 2 TRM'/ LOES-T U U AUTTIM /LEFEECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LISTOFEFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.4 Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages 3.4-6 through 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 EMERGENCY CORE COOLING AND-RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM I 3.6-9 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 and TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Page TRM / 3.7-9 Page TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 and TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Effective Date 03/30/20)01 09/13/2005 12/14/1998
,10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/20)03 03/27/20)07 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 03/31/2006 10/23/1998 08/31/1998 10/31/2007 08/31/1998 12/03/2004 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 3.7 07/29/1999 08/31/1998 03/31/2006 08/02/1999 03/31/2006 08/16/2005 01/21/2000 08/02/1999 08/09/2005 08/02/1999 03/31/2006 SUSQUEHANNA
- UNIT 2 TRM / LOES-2 EFFECTIVE DATE 09/04/2008 SUSQUEHANNX-'UNIT 2 TRM / LOES-2 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev, 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Page TRM/ 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 PageTRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM /3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Page TRM I 3.7-40a Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM /3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Effective Date 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 10/31/2007 11/29/2006 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 11/29/2006 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Pages TRM / 3.8-26 through TRM / 3.8-29 MEFFECTIVE DATE 09/04/2008 SUSQUEHANNA - UNIT 2 TRM / LOES-3
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 Effective Date 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 08/16/2006 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04102/2002 11/14/2006
-05/13/2005 04/12/2007 01/21/2004 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 SUSQUEHANNA - UNIT 2-TRM / LOES-4 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective [)ate 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 02/05/1999 03/14/2008 02/05/1999 08/31/1998 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 SUSQUEHANNA-UNIT2' TRM/L0ES5 EFFECTIVE DATE 09/04/2008 SUSQUEHANNA - UNIT'2 -
TRM / LOES-5-- --
.EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section B 3.0 B 3.1 B 3.2 Title B 3.3 B 3.4 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM,/ B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM /B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a through TRM / B 3.3-19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Effective Date 08/31/1998 01/10/2007 04/14/2008 08/31/1998-04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 10/31/2007 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004.
06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/31/2007 10/15/1999 08/31/1998 SUSQUEHANNA -UNIT,2.,.-
E:A :TRM-tlOES-6
.......EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.5 B 3.6 B 3.7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM I B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-1 la Pages TRM / B 3.7-12 through TRM /B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Effective Date 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/19'99 03/31/2006 08/02/19,99 08/02/19'99 03/31/2006 08/02/19,99 03/31/2006 08/02/1999
-.01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/20,06 12/03/20,04 03/09/20,01 04/15/2003 12/03/2004 07/05/2000
-SUSQUEHANNA
- UNIT-2 TRM / LOES-7 EEFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.8 B.3.9 ELECTRICAL POWER BASES Page TRM /B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM I B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM I B 3.10-6 and TRM / 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B-3.1 1-11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 311-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 TRM2 text LOES.doc 8/28/08 Effective Date 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/0212002 08/10/2004 08/31/1998 0410212002 01/28/2005 11/29/2006 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 12/03/2004 08/31/1998 02/12/1999 09/19/2007 02/05/1999 SUSQUEHANNA - UNIT-2......
.TRM1LES -7 EFFECTIVE DATE 09/04/2008
Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation 3.7.7 PPL Rev. 2 3.7 Plant Systems 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation TRO 3.7.7 One channel of Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation shall be OPERABLE.
APPLICABILITY:
During operation of the Main Condenser Air Ejector and Offgas Treatment System.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A
Main Condenser Offgas A.1 Verify that the Offgas System Immediately Pretreatment Logarithmic is not bypassed Radioactivity Monitor inoperable.
AND A.2. Perform TS SR 3.7.5.1 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.3 Restore Main Condenser 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Offgas Pretreatment Radioactivity Monitor to OPERABLE status B.
Main Condenser Offgas B.1 Verify that the Offgas'System Immediately Pretreatment Logarithmic is not bypassed Radioactivity Monitor and AND Turbine Building Vent Monitor Low Range Noble B.2 Perform TS SR 3.7.5.1 Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Gas Channel inoperable AND B.3 Restore Main Condenser Offgas Pretreatment 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Radioactivity Monitor OR Turbine Building Vent Monitor Low Range Noble Gas Channel to OPERABLE status SUSQUEHANNA.-.UNIT2.TM 34F I
D E
/2 TRM./ 3.7-41 EFFECTIVE DATE 09/04/2008
Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation 3.7.7 PPL Rev. 2 TECHNICAL REQUIREMENT SURVEILLANCE....
SURVEILLANCE FREQUENCY TRS 3.7.7.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.7.7.2 Perform SOURCE CHECK 31 days TRS 3.7.7.3 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.7.7.4 Perform CHANNEL CALIBRATION 24 Months
..suSQUEHANNA-7 UNIT 2 TM 372EF IVD E819 TFW EFFECTIVE DATE 08/31/1998