| | Title | Significance | Cross cutting aspect |
|---|
| 05000285/FIN-2013008-01 | Inadequate Procedure for Combating Frazil Ice | | |
| 05000285/FIN-2013008-02 | Frazil Ice Monitor Not Operational | Green | P.3 |
| 05000285/FIN-2013008-03 | Lack of SAFETY-RELATED Equipment for Design Basis LOW River Level | Green | P.2 |
| 05000285/FIN-2013008-04 | NON-CONSERVATIVE Value for Declaring an Alert on LOW River Level | Green | |
| 05000285/FIN-2013008-05 | Inadequate Procedure for Combating Loss of RAW Water | Green | P.2 |
| 05000285/FIN-2013008-06 | Failure to Account for Worst Case Conditions in Fuel Oil Inventory Calculation | Green | P.2 |
| 05000285/FIN-2013008-07 | Administrative Controls for a Technical Specification for LOW River Level | | |
| 05000285/FIN-2013008-08 | Sluice Gate Leakage Not Periodically Verified | Green | P.2 |
| 05000285/FIN-2013008-10 | Failure to Accurately Model RAW Water Flow Into the Intake Structure | Green | P.2 |
| 05000285/FIN-2013008-12 | Inadequate Root Cause for a Significant Condition Adverse to Quality | Green | X.6 |
| 05000285/FIN-2013008-13 | Failure to Establish and Document Basis for Test Acceptance Criteria | Green | H.8 |
| 05000285/FIN-2013008-14 | Failure to Promptly Identify and Correct a Condition Adverse to Quality | | H.14 |
| 05000285/FIN-2013008-15 | Failure to Correct Conditions Adverse to Quality Involving Frequency Compatibility Issues in the 120VAC System | Green | P.2 |
| 05000285/FIN-2013008-16 | Failure to Account for Additional Diesel Loading from NON-SAFETY Loads | Green | P.2 |
| 05000285/FIN-2013008-17 | Failure to Adequately Implement the Maintenance Rule | Green | H.14 |
| 05000285/FIN-2013008-18 | Failure to Establish Adequate Instructions for Restoring Temporary Modifications | Green | H.5 |
| 05000285/FIN-2013008-19 | Failure to Initiate Condition Reports in Accordance with the Corrective Action Program Procedures | Green | P.1 |
| 05000285/FIN-2013008-20 | Failure to Identify Conditions Adverse to Quality | Green | P.1 |
| 05000285/FIN-2013008-21 | Failure to Ensure That Design Requirements Associated with the Containment Electrical Penetration Assemblies Were Correctly Translated Into Installed Plant Equipment | Green | P.1 |
| 05000285/FIN-2013008-22 | Fort Calhouns Station\'S Ability to Classify Components as SAFETY-RELATED | | |
| 05000285/FIN-2013008-23 | Code of Record for SAFETY-RELATED Piping Systems | | |
| 05000285/FIN-2013008-24 | Failure to Effectively Monitor the Performance of Penetration Seals | Green | P.2 |
| 05000285/FIN-2013008-25 | Deficient Evaluation for Known Degraded Conditions: SAFETY-RELATED Air Operated Valve Elastomers Not Qualified for Helb/Loca Temeratures | Green | P.2 |
| 05000285/FIN-2013008-26 | Failure to Properly Inspect, Maintain, and Test Emergency Feedwater Tank Equipment | Green | P.2 |
| 05000285/FIN-2013008-27 | Continuous Monitoring Capability of Post Accident Main Steam Radiation Monitor RM-064 | | |
| 05000285/FIN-2013008-28 | Failure to Perform an Evaluation for a Change to Component Cooling Water MAKE-UP | Green | |
| 05000285/FIN-2013008-29 | Use of Alternate Seismic Evaluation Criteria | | |
| 05000285/FIN-2013008-30 | Evaluation of Change to Alternate Shutdown Cooling Flowpath | Green | |
| 05000285/FIN-2013008-31 | Multiple Examples of Operability Determinations That Lacked Adequate Technical Justification | Green | P.2 |
| 05000285/FIN-2013008-32 | Multiple Examples of Inadequate RISK-BASED Operability Determinations | Green | H.14 |
| 05000285/FIN-2013008-33 | Inadequate Operability Determination Due to Failure to Establish Component Cooling Water System Leakage Criteria | Green | P.2 |
| 05000285/FIN-2013008-34 | Failure to Follow ASME Code Requirements When Establishing New Pump Reference Values as Corrective Actions | Green | P.2 |
| 05000285/FIN-2013008-35 | Failure to Correct Condition Adverse to Quality Associated with Corrective Action Program Procedures and the Operability Process | Green | P.1 |
| 05000285/FIN-2013008-36 | Deficient Evaluation of NRC Bulletin 88-04, Strong Pump Weak Pump Due to Failure to Consider the Effect of AFW Pumps Discharge Check Valves Leakage | Green | P.1 |
| 05000285/FIN-2013008-37 | Improper Storage of the RAW Water to Auxiliary Feedwater Emergency Tank Fill Hose | Green | P.2 |
| 05000285/FIN-2013008-38 | Deficient Evaluation for Known Degraded Conditions - AFW Pumps Discharge Check Valve Leakage and Potential Overpressure of AFW Pump Suction Piping | Green | H.14 |
| 05000285/FIN-2013008-39 | Failure to Properly Implement Applicable ASME OM Code Requirements | Green | P.2 |
| 05000285/FIN-2013008-40 | Failure to Obtain Prior NRC Approval for a Facility Change | Green | H.14 |
| 05000285/FIN-2013008-41 | Inappropriate Modification of Turbine Driven Auxiliary Feedwater Pump Back Pressure Protection Trip | Green | P.2 |
| 05000285/FIN-2013008-42 | Failure to Make Timely Event Notifications for Unanalyzed Conditions | Severity level IV | |
| 05000285/FIN-2013008-43 | Repetitive Issues Involving Untimely Submittal of Required Licensee Event Reports | Severity level IV | |