December 28, 2012
Lou Cortopassi, Vice President
and Chief Nuclear Officer
Omaha Public Power District
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION - NOTIFICATION OF INSPECTION
(NRC INSPECTION REPORT 05000285/2013008) AND REQUEST FOR
INFORMATION
Dear Mr. Cortopassi:
On January 14, 2013, inspectors from the Nuclear Regulatory Commissions (NRC) will perform
a safety culture inspection at Fort Calhoun Station, using applicable portions of NRC Inspection
Procedure 95003, Supplemental Inspection for Repetitive Degraded Cornerstone, Multiple
Degraded Cornerstones, Multiple Yellow Inputs or One Red Input, to evaluate the independent
safety culture assessment performed at Fort Calhoun. This inspection is a part of the MC 0350
oversight inspection activities. Experience has shown that this inspection is a resource
intensive inspection both for the NRC inspectors and your staff. The inspection will focus on
information gathered from site personnel about the safety culture primarily from focus groups.
The inspection team will also conduct interviews and review documents related to activities
identified in the safety culture assessment and other policies and procedures related to site
safety culture. In addition, a selection of observations of various meetings and activities will be
observed by the inspection team.
The inspection will include 2-weeks of onsite inspection by the team. The inspection will consist
of 3 safety culture assessors and 2 NRC inspectors. The current inspection schedule is as
follows:
Preparation Week: January 7, 2013
Onsite weeks:
January 14, 2013
February 11, 2013
In order to minimize the impact to your onsite resources and to ensure a productive inspection,
we have enclosed a request for documents and resources needed for this inspection.
The first group (Section A of the enclosure) identifies information to be provided prior to the
onsite portion of the inspection to support inspector preparation. The second group (Section B
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
L. Cortopassi
- 2 -
of the enclosure) identifies information the inspectors will need upon arrival at the site. It is
important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or onsite portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Erick Matzke. If there are any
questions about this inspection or the material requested, please contact the lead inspector,
Greg Warnick, at (949) 492-2641 (Greg.Warnick@nrc.gov) or Kamishan Martin at (301) 415-
3469 (Kamishan.Martin@nrc.gov).
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Michael Hay, Chief
Reactor Projects Branch F
Division of Reactor Projects
Docket: 50-285
License: DPR-40
Enclosure:
Safety Culture Assessment Evaluation Inspection Document Request
cc w/enclosure: Electronic Distribution for Fort Calhoun Station
L. Cortopassi
- 3 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Acting Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Barry.Westreich@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Mike.Hay@nrc.gov)
Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
Branch Chief, NRR/AHPB (Undine.Shoop@nrc.gov)
Safety Culture Assessor (Kamishan.Martin@nrc.gov)
Lead Inspector 0350 (Greg.Warnick@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)
R:\\_REACTORS\\_FCS\\2012\\FCS 2012 RFI LTR.docx
SUNSI Rev Compl.
Yes No
Yes No
Reviewer Initials
MCH
Publicly Avail.
Yes No
Sensitive
Yes No
Sens. Type Initials
MCH
SRI:Songs
C:DRP/F
GWarnick
MHay
/RA/
/RA/
12/28/12
12/28/12
OFFICIAL RECORD COPY T=Telephone E=E-Mail F=Fax
- 1 -
Enclosure
SAFETY CULTURE SUPPLEMENTAL INSPECTION DOCUMENT REQUEST
From:
Kamishan Martin
Human Factors Engineer, NRC NRR/AHPB
301-415-3469
To:
Erick Matzke
Senior Nuclear Licensing Engineer, Fort Calhoun Station
402-533-6032
Subject:
Information Request to Support January 2013 Evaluation of Independent Safety
Culture Assessment Inspection (IP 95003)
A. The following information is requested in order to support inspection preparation
activities starting January 7, 2013.
Electronically: Accessible Files on Certrec website for: Kamishan Martin, Molly Keefe,
Stephanie Morrow, Alma Allen and Carey Bickett.
Document Requests:
Site Wide Organizational Charts of Fort Calhoun Management through the first line
Supervisor Positions for the following departments
o Operations, Maintenance, Security, Engineering, Health Physics,
Chemistry, Training
List of licensed operators (SRO & RO) by crew (operating & staff)
List of individuals on the root cause evaluation team for the following findings:
o 2011 Red finding involving electrical breakers
o 2009 Yellow finding related to flooding strategies
o 2010 White finding related to electrical automatic shutdown
components
Documents detailing Safety Conscious Work Environment policies at Fort Calhoun
Change Management Procedures site wide
Independent Safety Culture Assessment Report including data charts
Independent Safety Culture Assessment Methodology
Most recent safety culture self-assessment report and related documents
Root Cause Evaluations for the red, white, and yellow findings
Documents related to restart checklist activities
B. The following information is requested in order to support the onsite inspection
activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on January 14, 2013.
Personnel Resource and Document Request
Make available individuals to participate in focus groups from the following
departments:
o Operations, Maintenance, Engineering, health physics, chemistry and
security
- 2 -
Enclosure
Individuals must be randomly selected for involvement in focus group
Make available managers from organization charts as selected by the NRC
inspectors for individual interviews
Access to Employee Concerns Program Manager/Ombudsman pertinent files for
evaluating SCWE and safety culture
Access to Human Resource Manager and pertinent employee files for evaluating
SCWE and safety culture