Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-14-006 and 05000286-14-006)
ML14239A518
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/02/2014
From: Arthur Burritt
Reactor Projects Branch 2
To: Ventosa J
Entergy Nuclear Operations
Burritt A
References
IR-2014-006
Download: ML14239A518 (6)


Text

September 2, 2014

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014006 AND 05000286/2014006)

Dear Mr. Ventosa:

On August 13, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Indian Point Nuclear Generating Units 2 and 3 (Indian Point). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Indian Point was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 92702, Follow-up on Corrective Actions for Violations and Deviations, IP 60845, Operation of Inter-Unit Fuel Transfer Canister and Cask System, IP 60855, Operation Of An Independent Spent Fuel Storage Installation (ISFSI), and Temporary Instruction (TI) 2516/001, Review of License Renewal Activities. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The onsite component has been scheduled for the week of October 27, 2014.

A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos.

50-247 and 50-286 License Nos. DPR-26 and DPR-64

Enclosure:

Inspection Plan

cc w/encl:

Distribution via ListServ

ML14239A518

SUNSI Review

Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP

NAME TSetzer/TCS ABurritt/ALB

DATE 08/20/14 08/21/14

Letter to John Ventosa from Arthur Burritt dated September 2, 2014 SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014006 AND 05000286/2014006)

Distribution w/encl: (via email)

W. Dean, RA

D. Lew, DRA

H. Nieh, DRP

M. Scott, DRP

J. Trapp, DRS

P, Krohn, DRS

A. Burritt, DRP T. Setzer, DRP L. McKown, DRP J. Petch, DRP S. Stewart, DRP, SRI B. Bollinger, DRP, RI (Actg)

G. Newman, DRP, RI D. Hochmuth, DRP, AA A. Bowers, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources A. Dimitriadis, DRS J. Noggle, DRS M. Gray, DRS C. Cahill, DRS J. Rogge, DRS D. Jackson, DRS D. Screnci, PAO, N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO ROPassessment Resource RidsNrrDirslpabResource

Page 1 of 2 08/19/2014 10:26:03 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Indian Point Inspection / Activity Plan 07/01/2014 - 12/31/2015 92702

- OMA NOV FOLLOW-UP

2, 3 IP Followup On Corrective Actions For Violations And Deviations 92702 08/26/2014 08/27/2014 7111111B

- U2 REQUAL INSP WITH P/F RESULTS

2 IP Licensed Operator Requalification Program 7111111B 09/15/2014 09/19/2014 9/15EXAM

- IP2 RETAKE INITIAL OL EXAM

2 FY14-IP2 INITIAL OPERATOR LICENSING RETAKE EXAM U01921 09/15/2014 09/19/2014 ISFSI

- INTER-UNIT FUEL TRANSFER

2, 3 IP Operation of Inter-Unit Fuel Transfer Canister and Cask System 60845 07/21/2014 07/25/2014 71124

- HP

2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/11/2014 08/15/2014 2, 3 IP Occupational ALARA Planning and Controls 71124.02 08/11/2014 08/15/2014

IP Problem Identification and Resolution 71152 08/11/2014 08/15/2014 92709

- STRIKE CONTINGENCY PLANNING

2, 3 IP Licensee Strike Contingency Plans 92709 09/01/2014 10/01/2014 92702

- 92702 FOR IP RFOST/FOST SL-III VIO

2, 3 IP Followup On Corrective Actions For Violations And Deviations 92702 09/01/2014 12/31/2014 EP EXER

- EP EXERCISE INSPECTION

2, 3 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 10/06/2014 10/10/2014 71124

- HP

2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/03/2014 11/07/2014 2, 3 IP Occupational Dose Assessment 71124.04 11/03/2014 11/07/2014 2, 3 IP 71151-OR01 11/03/2014 11/07/2014 2, 3 IP 71151-PR01 11/03/2014 11/07/2014 5/11EXAM

- U3 INITIAL OL EXAM

3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM U01908 04/13/2015 04/17/2015

FY15-IP3 INITIAL OPERATOR LICENSING EXAM U01908 05/11/2015 05/15/2015 71124

- RETS

2, 3 IP Radiation Monitoring Instrumentation 71124.05 02/09/2015 02/13/2015 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/09/2015 02/13/2015 71124

- HP

3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/02/2015 03/06/2015

IP Occupational ALARA Planning and Controls 71124.02 03/02/2015 03/06/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 08/19/2014 10:26:03 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Indian Point Inspection / Activity Plan 07/01/2014 - 12/31/2015 7111108P

- U3 INSERVICE INSPECTION

3 IP Inservice Inspection Activities - PWR 7111108P 03/02/2015 03/13/2015 71124

- HP

2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/04/2015 05/08/2015 2, 3 IP Occupational ALARA Planning and Controls 71124.02 05/04/2015 05/08/2015 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/04/2015 05/08/2015 ISFSI

- ISFSI LOADING INSPECTION

2, 3 IP Operation Of An ISFSI 60855 06/01/2015 09/30/2015

IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2015 09/30/2015 7111107T

- TRIENNIAL HEAT SINK

2, 3 IP Heat Sink Performance 7111107T 07/13/2015 07/22/2015 CDBI

- COMPONENT DESIGN BASIS INSPECTION

2, 3 IP Component Design Bases Inspection 7111121 07/20/2015 07/24/2015 2, 3 IP Component Design Bases Inspection 7111121 08/03/2015 08/07/2015 2, 3 IP Component Design Bases Inspection 7111121 08/17/2015 08/21/2015 7111111B

- IP3 REQUAL INSP W/ P/F RESULTS

3 IP Licensed Operator Requalification Program 7111111B 09/21/2015 09/25/2015 71124

- HP

2, 3 IP Occupational Dose Assessment 71124.04 08/10/2015 08/14/2015 2, 3 IP Radiation Monitoring Instrumentation 71124.05 08/10/2015 08/14/2015 2, 3 IP Performance Indicator Verification 71151 08/10/2015 08/14/2015 EP

- EP PROGRAM INSPECTION

2, 3 IP Alert and Notification System Testing 7111402 08/17/2015 08/21/2015 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 08/17/2015 08/21/2015 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/17/2015 08/21/2015 2516-001

- TI 2516-001 U3 LR COMMITMENTS INSPECTION

3 IP Review of License Renewal Activities 2516/001 11/16/2015 11/20/2015 71124.08

- RADWASTE

2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/16/2015 11/20/2015 PI&R

- PI&R - BIENNIAL

2, 3 IP Problem Identification and Resolution 71152B 11/30/2015 12/04/2015 2, 3 IP Problem Identification and Resolution 71152B 12/14/2015 12/18/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure