IR 05000483/2015406

From kanterella
Revision as of 12:11, 10 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Inspection Report 05000483/2015406
ML15126A476
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/05/2015
From: Mark Haire
Plant Support Branch-1
To: Diya F
Union Electric Co
References
IR 2015406
Download: ML15126A476 (4)


Text

May 5, 2015

SUBJECT:

CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015406

Dear Mr. Diya:

On April 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Callaway Plant, and the NRC inspectors discussed the results of this inspection with Mr. L. Graessle, Senior Director, Operations Support, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspector did not identify any findings or violation of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Branch Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-483 License No. NPF-30

Nonpublic Enclosure:

NRC Inspection Report 05000483/2015406 w/Attachment: Supplemental Information

cc w/encl:

Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008

cc w/o encl:

Electronic Distribution for Callaway Plant

ML15126A476 Entire Report:

SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:

SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 C:PSB1 C:PBC C:PSB1

NAME JBuchanan MHaire GWarnick MHaire

SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE 4/29/15 4/30/15 4/30/15 5/5/15 Letter to Fadi Diya from Mark S. Haire, dated May 5, 2015

SUBJECT:

CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015406

Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Administrative Assistant (Dawn.Yancey@nrc.gov)

Electronic distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSS (Don.Allen@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)