Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML15282A189, ML16085A301, ML16105A297, ML16105A441, ML16168A026, ML16176A316, ML16189A343, ML17062A390, ML17062A403, ML17181A450
|
MONTHYEARML15282A1892015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design Project stage: Other ML15282A2252015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues Project stage: Request ML15282A1822015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 Project stage: Request ML15282A1932015-08-31031 August 2015 ANP-3385NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report Project stage: Request ML15282A2362015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis Project stage: Request ML15282A1902015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate Project stage: Request ML15282A2232015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate Project stage: Supplement ML15282A1882015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design Project stage: Request ML15282A1872015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu) Project stage: Request ML15282A1852015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1922015-08-31031 August 2015 ANP-3386NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) Atrium 10XM Fuel Assemblies, Licensing Report Project stage: Request ML15282A1842015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request ML15282A2402015-09-21021 September 2015 Startup Test Plan Project stage: Request ML15282A2222015-09-21021 September 2015 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology Project stage: Request ML15282A2412015-09-21021 September 2015 List and Status of Plant Modifications Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request 05000259/LER-2015-002, Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time2015-09-21021 September 2015 Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 Fws to NRC, Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Response to RAI ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16105A2972016-04-21021 April 2016 Regulatory Audit Plan for May 3-4, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-077, For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16119A4402016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16119A1332016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (SNPB-RAI) Project stage: RAI CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16120A0722016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124B1062016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16123A3352016-05-16016 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2016-03-29
[Table View] |
Text
June 15, 2016 MEMORANDUM TO:
Tracy J. Orf, Acting Chief Plant Licensing Branch II-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Farideh E. Saba, Senior Project Manager /RA SLingman for/
Plant Licensing Branch II-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF FORTHCOMING CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) AND ITS CONSULTANTS, GENERAL ELECTRIC-HITACHI (GEH) AND CONTINUUM DYNAMICS, INC. (CDI), REGARDING STEAM DRYER STRUCTURAL ADEQUACY FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3, EXTENDED POWER UPRATE (EPU) LICENSE AMENDMENT REQUEST (LAR)
DATE & TIME:
Thursday, June 23, 2016 10:30 a.m. - 1:30 p.m. (Eastern Daylight Time)
LOCATION:
U.S. Nuclear Regulatory Commission (NRC)
One White Flint North, Room O-10B6 11555 Rockville Pike Rockville, Maryland 20852 PURPOSE:
The purpose of this meeting is to discuss the structural adequacy of steam dryers associated with EPU LAR for Browns Ferry Nuclear Plant, Units 1, 2, and 3. This meeting is CLOSED to the public due to discussion of the information that is proprietary in nature.
PARTICIPANTS:
Participants from the NRC include members from the Office of Nuclear Reactor Regulation (NRR).
NRC TVA C. Basavaraju P. Donahue M. Breach G. Doyle Y. Li E. Frevold S. Lingam D. Green F. Saba J. Carneal (GEH)
S. Hambric (Consultant)
D. Pappone (GEH V. Shah (Consultant)
A. Bilanin (CDI), et al.
S. Ziada (Consultant), et al.
MEETING CONTACTS:
Siva P. Lingam, DORL/NRR Farideh E. Saba, DORL/NRR 301-415-1564 301-415-1447 Siva.Lingam@nrc.gov Farideh.Saba@nrc.gov Docket Nos. 50-259, 50-260, and 50-296
Enclosure:
Agenda
ML16161A064 OFFICE LPL4-1/PM LPL2-2/PM LPL2-2/LA LPL2-2/BC (A)
LPL4-1/PM NAME SLingam FSaba BClayton TOrf SLingam DATE 6/14/16 6/14/16 6/14/16 6/15/16 6/15/16
Enclosure AGENDA FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA)
REGARDING STEAM DRYER STRUCTURAL ADEQUACY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 THURSDAY, JUNE 23, 2016 10:30 AM - 1:30 PM CLOSED MEETING TIME TOPIC LEAD 10:30 a.m.
Introductions
NRC/TVA 10:45 a.m.
EMCB-RSD-RAI 14 TVA/GEH 11:15 a.m.
EMCB-RSD-RAI 15 TVA/GEH 11:45 a.m.
EMCB-RSD-RAI 16 TVA/GEH 12:15 p.m.
BREAK 12:30 p.m.
EMCB-RSD-RAI 18 TVA/GEH 1:00 p.m.
Multiple Standpipe Resonance Tests TVA/CDI 1:30 p.m.
Adjourn Notes:
- 1. Times and order of topics are approximate and may change.
- 2. General Electric-Hitachi (GEH) and Continuum Dynamics, Inc. (CDI) may not be present at the same time due to proprietary information.
June 15, 2016 MEMORANDUM TO:
Tracy J. Orf, Acting Chief Plant Licensing Branch II-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Farideh E. Saba, Senior Project Manager /RA SLingman for/
Plant Licensing Branch II-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF FORTHCOMING CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) AND ITS CONSULTANTS, GENERAL ELECTRIC-HITACHI (GEH) AND CONTINUUM DYNAMICS, INC. (CDI), REGARDING STEAM DRYER STRUCTURAL ADEQUACY FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3, EXTENDED POWER UPRATE (EPU) LICENSE AMENDMENT REQUEST (LAR)
DATE & TIME:
Thursday, June 23, 2016 10:30 a.m. - 1:30 p.m. (Eastern Daylight Time)
LOCATION:
U.S. Nuclear Regulatory Commission (NRC)
One White Flint North, Room O-10B6 11555 Rockville Pike Rockville, Maryland 20852 PURPOSE:
The purpose of this meeting is to discuss the structural adequacy of steam dryers associated with EPU LAR for Browns Ferry Nuclear Plant, Units 1, 2, and 3. This meeting is CLOSED to the public due to discussion of the information that is proprietary in nature.
PARTICIPANTS:
Participants from the NRC include members from the Office of Nuclear Reactor Regulation (NRR).
NRC TVA C. Basavaraju P. Donahue M. Breach G. Doyle Y. Li E. Frevold S. Lingam D. Green F. Saba J. Carneal (GEH)
S. Hambric (Consultant)
D. Pappone (GEH V. Shah (Consultant)
A. Bilanin (CDI), et al.
S. Ziada (Consultant), et al.
MEETING CONTACTS:
Siva P. Lingam, DORL/NRR Farideh E. Saba, DORL/NRR 301-415-1564 301-415-1447 Siva.Lingam@nrc.gov Farideh.Saba@nrc.gov Docket Nos. 50-259, 50-260, and 50-296
Enclosure:
Agenda
ML16161A064 OFFICE LPL4-1/PM LPL2-2/PM LPL2-2/LA LPL2-2/BC (A)
LPL4-1/PM NAME SLingam FSaba BClayton TOrf SLingam DATE 6/14/16 6/14/16 6/14/16 6/15/16 6/15/16
Enclosure AGENDA FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA)
REGARDING STEAM DRYER STRUCTURAL ADEQUACY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 THURSDAY, JUNE 23, 2016 10:30 AM - 1:30 PM CLOSED MEETING TIME TOPIC LEAD 10:30 a.m.
Introductions
NRC/TVA 10:45 a.m.
EMCB-RSD-RAI 14 TVA/GEH 11:15 a.m.
EMCB-RSD-RAI 15 TVA/GEH 11:45 a.m.
EMCB-RSD-RAI 16 TVA/GEH 12:15 p.m.
BREAK 12:30 p.m.
EMCB-RSD-RAI 18 TVA/GEH 1:00 p.m.
Multiple Standpipe Resonance Tests TVA/CDI 1:30 p.m.
Adjourn Notes:
- 1. Times and order of topics are approximate and may change.
- 2. General Electric-Hitachi (GEH) and Continuum Dynamics, Inc. (CDI) may not be present at the same time due to proprietary information.