Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017005 and 05000311/2017005)
ML17233A019
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/28/2017
From: Fred Bower
Reactor Projects Branch 3
To: Sena P
Public Service Enterprise Group
References
IR 2017005
Download: ML17233A019 (6)


Text

August 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORTS 05000272/2017005 AND 05000311/2017005)

Dear Mr. Sena:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Salem Nuclear Generating Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

As previously noted in the annual assessment letter dated March 1, 2017 (Report 05000272; 311/2016006; ADAMS Accession No.: ML17058A4011) in addition to baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, for Unit 2.

PSEG has notified Region I of their readiness for this inspection and the onsite inspection is currently planned to begin on September 11, 2017.

The NRC will also be performing IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants and Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects

Docket Nos. 50-272 and 50-311 License Nos. DPR 70 and DPR 75

Enclosure: Salem Inspection Plan

cc: Distribution via ListServ

ML17233A019

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DRP RI/DRP RI/DRP

NAME PFinney/per email MD MDraxton FBower

DATE 8/17/17 8/17/17 8/21/17

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 08/29/2017 - 06/30/2019 Page 1 of 3 08/29/2017 09:40:00 7111111B

- SALEM REQUAL INSP WITH P/F RESULTS

1, 2 IP Licensed Operator Requalification Program - Annual Review 7111111A 09/12/2017 09/16/2017 1, 2 IP Licensed Operator Requalification Program 7111111B 09/12/2017 09/16/2017 71152B

- PI&R BIENNIAL

1, 2 IP Problem Identification and Resolution 71152B 08/28/2017 09/01/2017 1/22EXM

- SALEM INITIAL OL EXAM

1 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U01949 12/11/2017 12/15/2017

FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U01949 01/22/2018 02/02/2018 71124.06

- RETS

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/28/2017 09/01/2017 SUPP

- 95001 - WHITE PI FOR SCRAMS PER 7000 HRS

2 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 09/11/2017 09/15/2017 TI-191

- FUKUSHIMA LESSONS LEARNED

1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 09/18/2017 09/22/2017 71124

- RAD PROTECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/23/2017 10/27/2017

IP Occupational ALARA Planning and Controls 71124.02 10/23/2017 10/27/2017 7111108P

- U1 INSERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 10/23/2017 11/03/2017 71124.08

- RADWASTE

1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/04/2017 12/08/2017 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/04/2017 12/08/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/04/2017 12/08/2017 7111105T

- TRIENNIAL FIRE PROTECTION

1, 2 IP Fire Protection [Triennial]

7111105T 02/12/2018 02/16/2018 1, 2 IP Fire Protection [Triennial]

7111105T 02/26/2018 03/02/2018 71124

- BASELINE HP

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/26/2018 03/02/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 02/26/2018 03/02/2018 1, 2 IP Occupational Dose Assessment 71124.04 02/26/2018 03/02/2018 1/14EXAM

- SALEM INITIAL OL EXAM

1 FY19-SALEM INITIAL OPERATOR LICENSING EXAM U01964 11/26/2018 11/30/2018

FY19-SALEM INITIAL OPERATOR LICENSING EXAM U01964 01/14/2019 01/25/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 08/29/2017 - 06/30/2019 Page 2 of 3 08/29/2017 09:40:00 EP

- EP EXERCISE INSPECTION

1, 2 IP Exercise Evaluation 7111401 05/21/2018 05/25/2018 7111117T

- 50.59 PROCESS

1, 2 IP Evaluations of Changes, Tests, and Experiments 7111117T 04/30/2018 05/04/2018 71124

- BASELINE HP

1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/21/2018 05/25/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/21/2018 05/25/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/21/2018 05/25/2018 ISFSI

- ISFSI OPERATIONAL INSPECTION

1, 2 IP Operation Of An ISFSI 60855 06/18/2018 06/22/2018 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/18/2018 06/22/2018 71124.07

- REMP

1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/25/2018 06/29/2018 71124.06

- RETS & PI VERIFICATION

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 09/10/2018 09/14/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 09/10/2018 09/14/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 09/10/2018 09/14/2018 U2 ISI

- UNIT 2 INSERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 10/22/2018 11/02/2018 71124

- BASELINE HP

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/29/2018 11/02/2018

IP Occupational ALARA Planning and Controls 71124.02 10/29/2018 11/02/2018 1, 2 IP Occupational Dose Assessment 71124.04 10/29/2018 11/02/2018 71152B

- PI&R BIENNIAL

1, 2 IP Problem Identification and Resolution 71152B 01/28/2019 02/01/2019 1, 2 IP Problem Identification and Resolution 71152B 02/11/2019 02/15/2019 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 02/11/2019 02/15/2019 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 02/11/2019 02/15/2019 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/11/2019 02/15/2019 1, 2 IP Performance Indicator Verification 71151 02/11/2019 02/15/2019 71124

- HP

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/04/2019 02/08/2019 1, 2 IP Occupational ALARA Planning and Controls 71124.02 02/04/2019 02/08/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 08/29/2017 - 06/30/2019 Page 3 of 3 08/29/2017 09:40:00 71124

- HP

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/15/2019 04/19/2019 U1 ISI

- INSERVICE INSPECTION - UNIT 1

1 IP Inservice Inspection Activities - PWR 7111108P 04/15/2019 04/26/2019 This report does not include INPO and OUTAGE activities.