Errata - South Texas Project Electric Generating Station, Units 1 and 2 - NRC Integrated Inspection Report 05000498/2018003 and 0500499/2018003
ML18347B541
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/13/2018
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Gerry Powell
South Texas
References
IR 2018003
Download: ML18347B541 (41)


Text

December 13, 2018

SUBJECT:

ERRATA - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC INTEGRATED INSPECTION REPORT 05000498/2018003 AND 0500499/2018003

Dear Mr. Powell:

December 13, 2018

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC INTEGRATED INSPECTION REPORT 05000498/2018003 AND 0500499/2018003

Dear Mr. Powell:

On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your South Texas Project Electric Generating Station, Units 1 and 2. On October 11, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects

Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80

Enclosure:

Inspection Report 05000498/2018003 and 05000499/2018003 w/Attachments:

1. Documents Reviewed 2. NRC Request for Information

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000498, 05000499

License Numbers:

NPF-76, NPF-80

Report Numbers:

05000498/2018003; 05000499/2018003

Enterprise Identifier: I-2018-003-0004

Licensee:

STP Nuclear Operating Company

Facility:

South Texas Project Electric Generating Station, Units 1 and 2

Location:

Wadsworth, Texas

Inspection Dates:

July 1, 2018 to September 30, 2018

Inspectors:

A. Sanchez, Senior Resident Inspector

J. Choate, Resident Inspector

P. Elkmann, Senior Emergency Preparedness Inspector

S. Hedger, Emergency Preparedness Inspector

A. Meyen, Physical Security Inspector

N. Greene, PhD, Senior Health Physicist

L. Carson II, Senior Health Physicist

C. Alldredge, Health Physicist

R. Rolph, US NRC Region I, Health Physicist

J. Braisted, PhD, Reactor Inspector

W. Cullum, Reactor Inspector

Approved By:

Nicholas H. Taylor

Chief, Project Branch B

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at South Texas Project Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below.

Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.

List of Findings and Violations

No findings or violations of more than minor significance were identified during the inspection.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On September 5, 2018, an inadvertent boration of the reactor coolant system occurred while placing a demineralizer bed in service that lowered reactor power to 98 percent power. The reactor operators returned the reactor to rated thermal power later that evening. The reactor remained at rated thermal power until September 22, 2018, when the reactor entered coastdown operation for the upcoming refueling outage. Reactor power decreased to 94 percent power by the end of the inspection period.

Unit 2 operated at rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01Adverse Weather Protection Summer Readiness

The inspectors evaluated summer readiness of offsite and alternate alternating current (AC)power systems.

71111.04Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2, train A essential chilled water system while train B was out of service for planned maintenance on July 2, 2018
(2) Unit 2, train A standby diesel generator while the turbine-driven auxiliary feedwater pump was out of service for planned maintenance on July 16, 2018
(3) Units 1 and 2, diesel driven fire pumps 1 and 3 during maintenance to replace test header return valve FP-0029 on July 23, 2018
(4) Unit 2, train C essential chilled water system while train A was out of service for planned maintenance on August 21, 2018
(5) Unit 2, train C standby diesel generator while train A was out of service for planned maintenance on August 21, 2018

71111.05AQFire Protection Annual/Quarterly Quarterly Inspection

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 1, train B essential chilled water room, Fire Area 29, Fire Zone Z140 on August 15, 2018
(2) Unit 1, component cooling water heat exchangers and common header, Fire Area 27, Zone 142 on September 27, 2018
(3) Unit 1, train B battery and distribution rooms, Fire Area 03, Fire Zone Z043 on September 28, 2018
(4) Unit 1, train B electrical penetration area, Fire Area 03, Fire Zone Z0301 on September 28, 2018

71111.06Flood Protection Measures Internal Flooding

The inspectors evaluated internal flooding mitigation protections in the Units 1 and 2 essential chilled water spaces on August 27, 2018.

Cables (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Unit 1, train C manhole C0XYAE KEM50 on May 10, 2018
(2) Unit 1, train B manhole B0XYAB KEM52 on August 20, 2018
(3) Unit 1, train B manhole B0XYAB KEM51 on September 19, 2018
(4) Unit 2, train A manhole A0XYAB KEM58 on August 20, 2018
(5) Unit 2, train B manhole B0XYAB KEM 55 on August 30, 2018

71111.07Heat Sink Performance Heat Sink (Triennial)

The inspectors evaluated heat exchanger/heat sink performance on the following components from September 10 through September 13, 2018:

(1) Unit 1, train A spent fuel pool heat exchanger, Section 02.02.c
(2) Unit 1, train B reactor containment fan cooler, Section 02.02.c
(3) Unit 2, train B electrical auxiliary building main air handling unit, Section 02.02.c
(4) Units 1 and 2 essential cooling pond, Section 02.02d, specifically Sections 02.02.d.1, 02.02.d.4, and 02.02.d.7 were completed.

71111.11Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification

The inspectors observed and evaluated a Unit 2 operating crew during a scenario involving a deaerator relief valve failing open followed by a loss of train D battery power and a loss of coolant accident on August 29, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated Unit 1 control room operations placing control rods in manual and steam dumps in steam pressure mode while control rod speed loop was being troubleshot and calibrated on August 7, 2018.

The inspectors observed and evaluated Unit 1 control room operations during a thunderstorm and heavy rain, alarm response to a safety-related 125Vdc trouble alarm (grounding), and a report of a fire and possible power line failure while the train C emergency diesel generator was inoperable on August 29, 2018.

71111.12Maintenance Effectiveness Routine Maintenance Effectiveness

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Units 1 and 2, essential chilled water system repeat maintenance rule functional failure for the auxiliary oil pump oil leakage on May 2, 2018
(2) Review of the 10 CFR 50.65.a(3) periodic evaluation completed on September 28, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 1, planned risk due to train C battery room heater non-functional and train C battery power operable, but degraded, on July 30, 2018
(2) Unit 1, planned risk due to train A essential cooling water and essential chilled water unavailable, on August 15, 2018
(3) Unit 1, planned risk due to train D 125Vdc battery and inverter IV-1202 in which the licensee entered the Configuration Risk Management Program (CRMP) on September 6, 2018
(4) Unit 1, emergent risk to the replacement of a failed power supply in control rod cabinet 2BD on September 7, 2018
(5) Unit 1, planned risk due to replacement of the train B residual heat removal pump motor in which operations entered the CRMP on September 24, 2018

71111.15Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 1, turbine driven auxiliary feedwater pump following the discovery of a turbine outboard gland joint leaking on July 16, 2018
(2) Westinghouse Technical Bulletin 17-3 for 7300 Solid State Protection System input relay coil suppression diodes on September 24, 2018
(3) Unit 1, train C reactor vessel water level thermocouple differential temperature issues on September 25, 2018
(4) Unit 1, train A essential cooling water pump following the discovery of degraded performance due to a leaking return header blowdown valve on August 17, 2015
(5) Unit 1, pressurizer surge line displacement during power operations on September 28, 2018

71111.18Plant Modifications

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 2, temporary enclosure around a reactor coolant system leak from a flow transmitter drain line on September 4, 2018

71111.19Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) Unit 1, train C battery heating, ventilation, and air conditioning heating coil following repair of the heating coil on July 31, 2018
(2) Unit 1, train C emergency diesel generator following replacement of an air start solenoid valve and a Bimba valve (controls metering rods for fuel pumps) due to a failed rated load surveillance test on August 29, 2018
(3) Unit 2, reactor coolant flow and feedwater flow in loops 1, 2, 3, and 4 following power supply and card replacement in the 7300 process cabinet 1A on September 4, 2018
(4) Unit 1, train D battery inverter following planned preventative maintenance on September 7, 2018
(5) Unit 1, control rod control circuit following control cabinet power supply replacement on September 7, 2018
(6) Unit 1, train B essential chilled water system following preventative maintenance on September 19, 2018

71111.20Refueling and Other Outage Activities

The inspectors evaluated refueling outage 1RE21 activities September 25, 2018. The inspectors completed inspection procedure Section 03.01.a.

===71111.22Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine===

(1) Unit 1, diesel fire pump 2 on July 25, 2018
(2) Unit 2, train A solid state protection system slave relay testing on July 28, 2018

In-service (3 Samples)

(1) Unit 2, turbine driven auxiliary feedwater pump on July 19, 2018
(2) Unit 1, train A component cooling water system valve operability test on September 11, 2018
(3) Unit 2, train A auxiliary feedwater pump on August 23, 2018

71114.01Exercise Evaluation

The inspectors evaluated the biennial emergency plan exercise conducted June 12 and 13, 2018. The exercise scenario simulated a damaged impeller on a reactor coolant pump leading to fuel damage from loose parts in the reactor vessel, the inability to trip the reactor, a breach of the reactor coolant system inside containment, the failure of ventilation dampers in the fuel handling building to close, a break on the coolant recirculation line outside of containment, and an unfiltered radiological release through the open fuel handling building ventilation.

71114.04Emergency Action Level and Emergency Plan Changes

The licensee submitted a summary of Emergency Plan changes (Revision ICN 20-19) to the NRC on June 15, 2018. The inspectors conducted an in-office review of the changes from June 19 to July 9, 2018. This evaluation does not constitute NRC approval.

The inspector evaluated South Texas Project Electric Generating Station, Change ICN 20-20, submitted on June 19, 2018. The evaluation was performed in-office from August 9 through September 10, 2018. This evaluation does not constitute NRC approval.

71114.06Drill Evaluation Drill/Training Evolution

The inspectors evaluated the licensees simulator-based licensed operator requalification training evolution that involved high reactor coolant system activity, a failed open main steam generator safety, and a small break loss-of-coolant-accident which resulted in an unusual event and an alert declaration on July 24, 2018.

Emergency Planning Drill (1 Sample)

The inspectors evaluated the licensees emergency response combined functional drill that involved high reactor coolant activity (led to an alert declaration), steam generator tube rupture (led to a site area emergency declaration), and a stuck open steam generator power-operated relief valve (led to a general emergency declaration) on September 19, 2018.

71114.08Exercise Evaluation - Scenario Review

The inspectors reviewed and evaluated the proposed scenario for the biennial emergency plan exercise on May 15, 2018. The proposed scenario was evaluated to determine whether it provided the emergency response organization opportunities to demonstrate key emergency response organization skills. This review does not constitute NRC approval.

The inspectors also discussed the proposed scenario with staff at FEMA Region VI.

RADIATION SAFETY

71124.05Radiation Monitoring Instrumentation Walkdowns and Observations

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.

Calibration and Testing Program (1 Sample)

The inspectors evaluated the licensees calibration and testing program.

71124.06Radioactive Gaseous and Liquid Effluent Treatment Walkdowns and Observations

The inspectors evaluated the licensees radioactive gaseous and liquid effluent treatment systems during plant walkdowns.

Calibration and Testing Program (Process and Effluent Monitors) (1 Sample)

The inspectors evaluated the licensees gaseous and liquid effluent monitor instrument calibration and testing.

Sampling and Analyses (1 Sample)

The inspectors evaluated radioactive effluent sampling and analysis activities.

Instrumentation and Equipment (1 Sample)

The inspectors evaluated radioactive effluent instrumentation and equipment.

Dose Calculations (1 Sample)

The inspectors evaluated dose calculations.

71124.07Radiological Environmental Monitoring Program Site Inspection

The inspectors evaluated the licensees radiological environmental monitoring program.

Groundwater Protection Initiative Implementation (1 Sample)

The inspectors evaluated the licensees groundwater monitoring program.

===71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

Radioactive Material Storage===

The inspectors evaluated the licensees radioactive material storage.

Radioactive Waste System Walkdown (1 Sample)

The inspectors evaluated the licensees radioactive waste processing facility during plant walkdowns.

Waste Characterization and Classification (1 Sample)

The inspectors evaluated the licensees radioactive waste characterization and classification.

Shipment Preparations (1 Sample)

The inspectors evaluated the licensees radioactive material shipment preparation processes.

Shipment Records (1 Sample)

The inspectors evaluated the licensees non-excepted package shipment records.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) MS06: Emergency AC Power Systems, Units 1 and 2 (07/01/2017-06/30/2018)
(2) MS07: High Pressure Injection Systems, Units 1 and 2 (07/01/2017-06/30/2018)
(3) MS08: Heat Removal Systems, Units 1 and 2 (07/01/2017-06/30/2018)
(4) EP01: Drill/Exercise Performance Sample (04/01/2017-03/31/2018)
(5) EP02: Emergency Response Organization Drill Participation Sample (04/01/2017-03/31/2018)
(6) EP03: Alert And Notification System (ANS) Reliability Sample (04/01/2017-03/31/2018)

71152Problem Identification and Resolution Annual Follow-up of Selected Issues

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) The failure of the Unit 1 technical support center diesel generator output breaker to close during surveillance testing on March 21, 2018, and again on June 18, 2018

71153Follow-up of Events and Notices of Enforcement Discretion Events

The inspectors evaluated the Unit 1 reactor operator response to an inadvertent boration of the reactor coolant system while placing a demineralizer bed in service that lowered reactor power to 98 percent power at the end of core life on September 5, 2018.

The inspectors evaluated the Unit 2 reactor operator response to a power supply failure in the Westinghouse 7300 process cabinet 1A that resulted in four reactor coolant loop flow and four feedwater flow transmitters failing low on September 4, 2018. The balance of plant operator took immediate actions to control steam generator level and avoided a reactor trip.

EXIT MEETINGS AND DEBRIEFS

On May 11, 2018, the inspectors discussed the proposed biennial exercise scenario with Ms. D. Bordelon, Branch Chief, Technological Hazards Branch, FEMA Region VI, and other members of the FEMA regional staff.

On May 15, 2018, the inspectors discussed the results of the in-office review of the licensees preliminary exercise scenario with Mr. J. Enoch, Manager, Emergency Preparedness, and other members of the licensees staff.

On June 14, 2018, the inspectors discussed the biennial exercise conducted June 12, 2018, with Ms. D. Bordelon, Branch Chief, Technological Hazards Branch, FEMA Region VI, and other members of the FEMA regional staff.

On July 12, 2018, the inspectors presented the emergency preparedness exercise inspection results to Mr. G. T. Powell, President and Chief Executive Officer, and other members of the licensee staff.

On July 26, 2018, the inspectors presented the baseline radiation protection inspection results to Mr. A. Capristo, Executive Vice President, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

On September 10, 2018, the emergency preparedness inspector communicated the emergency plan evaluation results to Mr. S. Korenek, Emergency Planner, Emergency Response, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

On September 13, 2018, the inspectors presented the triennial heat sink performance inspection results to Mr. G. T. Powell, President and Chief Executive Officer, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

On October 11, 2018, the resident inspector presented the quarterly resident inspector inspection results to Mr. G. T. Powell, President and Chief Executive Officer, and other members of the licensee staff. The inspectors confirmed that proprietary information was controlled to protect from public disclosure.

DOCUMENTS REVIEWED

71111.04 - Partial Equipment Alignment

Procedures

Number

Title

Revision

0POP02-DG-0001

Emergency Diesel Generator 11(21)

0POP02-FP-0001

Fire Protection System Operation

Drawings

Number

Title

Revision

5V119V10001

HVAC Essential Chilled Water System

5Q159F22540

Standby Diesel Jacket Water

5Q159F22544

Standby Diesel Starting Systems and Alarms

5Q159F22546

Standby Diesel Starting Air

7Q270F00006

Fire Protection Storage and Pumps

71111.05AQFire Protection Quarterly

Procedures

Number

Title

Revision

0PGP03-ZF-0018

Fire Protection System Functionality Requirements

0-MAB29-FP-0140

Fire Preplan, Mechanical Auxiliary Building CCW Pump and

Chiller, Train B

0EAB03-FP-0031

Fire Preplan Electrical Auxiliary Building Electrical penetration

Area, Train B

0EAB03-FP-0043

Fire Preplan Electrical Auxiliary Building Channel III Battery and

Distribution Room

71111.06 Flood Protection Measures

Work Authorization Number (WAN)

553777

553283

553282

554117

559078

71111.07Heat Sink Performance Heat Sink (Triennial)

Condition Reports (CRs) (Reviewed)

07-16477

17-213

98-15552

15-23265

99-1977

17-12482

18-604

2-29783

16-4069

18-7562

Condition Reports (CRs) (Issued)

18-7217

18-10613

18-10614

18-10615

18-10616

18-10618

18-10620

18-10638

18-10699

18-10712

Work Authorization Numbers

34518929

252482

34590856

33830088

33045590

34595534

34331491

34084950

33709492

34370341

2514939

33593163

34666717

34639238

34713602

33946792

Design Change Notices

97-03085

98-00612

98-00613

98-00614

98-00615

98-00616

98-00617

98-00618

Procedures

Number

Title

Revision

0PGP03-ZE-0080

Essential Cooling Water System Reliability Program

0PGP03-ZO-0057

Operator Time Critical Action Program

0POP02-CC-0001

Component Cooling Water

0POP02-CH-0001

Essential Chilled Water Operations

0POP02-EW-0001

Essential Cooling Water Operations

0POP02-FC-0001

Spent Fuel Pool Cooling and Cleanup System

0POP02-HC-0001

Containment HVAC

0POP02-HE-0001

EAB HVAC Operations

0POP04-AE-0001

First Response to Loss of Any or All 13.8 KV or 4.16 KV Bus

0POP05-EO-ES01

Reactor Trip Response

0PSP15-CC-0001

Component Cooling Water System Pressure Test

Chapter 13

Closed Cooling Water Chemistry Strategic Plan

Drawings

Number

Title

Revision

or Date

0-Y-0101

Essential Cooling Pond General Layout

0-Y-0103

Essential Cooling Pond Sections and Details

0-Y-0104

Essential Cooling Pond Sections and Details

0-Y-36101

Essential Cooling Pond General Layout

0-Y-36103

Essential Cooling Pond Sections and Details

Drawings

Number

Title

Revision

or Date

0-Y-6587

Essential Cooling Pond

13304

Modified DAA-P-7900 Backdraft Damper

N

5R209F05018

Piping and Instrumentation Diagram Component Cooling

Water System

5R-20-9-Z-420421

RCFC CCW Supply and Return Logic Diagram

2

Bolt Torque Sequence

February 13,

1978

C-5053-2

Tube Bundle Details

D-5051-5

Spent Fuel Pool H.E.

November 12,

1976

Calculations

Number

Title

Revision

or Date

0PGP04-ZA-0307

Essential Chilled Water / EAB HVAC Design Basis Loads

with Capacity of 300 Tons per Train

2V149MC5674

Reactor Containment Fan Cooler System Failure Modes

and Effects Analysis (RCFC FMEA)

5V149MC5910

Containment Abnormal Temperature

0, 2

MC-06482A

Essential Chilled Water Minimum Flow Requirements for

EAB, CRE, FHB, and MAB Coolers

MC-6470

RCFC Pressure Increase Following LOOP

NC-7106

Spent Fuel Pool Heatup Analysis

Miscellaneous

Documents

Number

Title

Revision

or Date

17000849

PM to visually monitor sago pond weed

September 11,

2018

2V149VB00114

Design Basis Document RCB HVAC System

2V211VS0001

Specification for Reactor Containment Fan

Cooler 2V211VS001

5R219MQ1022

Design Criteria for Spent Fuel Pool Cooling and Cleanup 5

5R289MB01006

Design Basis Document Essential Cooling Water System 8

CC-4

IST Bases Document - Valves

CR-12-11656-37

2012 Essential Cooling Pond Inspection Report

October 9,

2012

CREE 99-1977-2

Post-DBA Operation with No RCFC

Miscellaneous

Documents

Number

Title

Revision

or Date

DCP 96-10411-11

Evaluate Piping Stresses Due to Increased Pressure

DCP 96-10411-5

Update to Vendor Calculation NESE205 - Code

Calculation for Cooling Coil

DCP-95-8208-5

Increase Closure Time on MOVs (CCMOV0032 &

CCMOV0447)

ST-HL-AE-3341

Service Water System Problems Affecting Safety-

Related Equipment

January 29,

1990

ST-HL-AE-5336

Compliance of Refueling Practices With Licensing Basis April 4, 1996

VTD-A220-0027

Instruction Manual for the Installation, Operation, and

Maintenance of the Reactor Containment Fan Cooler

VTD-A340-0001

AWV Model DAA-P-7900 Backdraft Damper Revised

Operating & Maintenance Manual

June 5, 1980

VTD-W351-0006

Instruction Manual for Westinghouse NSSS Heat

Exchangers

71111.11QOperator Requalification

Condition Reports (CR)

18-9026

Work Authorization Number (WAN)

594022

Procedures

Number

Title

Revision

0POP04-MS-0001

Excessive Steam Demand

0POP04-TM-0001

Turbine Load Rejection

0POP04-TM-0005

Fast Load Reduction

0PMP08-RS-0660

RCS Rod Speed Control Calibration Loop (S-0660)

0POP04-VA-0001

Loss of 120 VAC Class Vital Distribution

0POP04-RC-0003

Excessive RCS Leakage

0POP05-E-EO00

Reactor Trip or Safety Injection

0POP05-EO-EO10

Loss of Reactor or Secondary Coolant

0POP05-EO-ES12

Post LOCA Cooldown and Depressurization

0ERP01-ZV-IN01

Emergency Classification

1POP09-AN-03M2

1-03M-2 Response Instructions

Documents

Number

Title

Revision

Scenario RST218.16

RCS LOCA to ES12

71111.12Maintenance Effectiveness

Condition Reports (CRs)

17-22662

18-7536

Procedures

Number

Title

Revision

SEG-009

Maintenance Rule Basis Document Guideline

SEG-002

Maintenance Rule equipment History Review

0PGP04-ZE-0313

Maintenance Rule Program

71111.13 - Maintenance Risk Assessments and Emergent Work Control

RAsCal Sequence Numbers

238

205

234

206

235

3198

231

231

201

232

Procedures

Number

Title

Revision

0POP02-CV-0004

Chemical and Volume Control System Subsystem

0PGP03-ZA-0090

Work Process Program

0PGP03-ZG-RMTS

Risk Managed Technical Specification Program

0POP01-ZO-0006

Risk Managed Actions (RMAs)

0PGP03-ZA-0091

Configuration Risk Management Program

71111.15 - Operability Determinations and Functionality Assessments

Condition Reports (CRs)

18-8533

17-22601

18-3616

Work Authorization Number (WAN)

586707

Procedures

Number

Title

Revision

0PSP03-AF-0007

Auxiliary Feedwater Pump 14(24) Inservice Test

0PGP03-ZA-0133

Station Leak Management Program

0PSP05-AM-0050

Reactor Vessel Water Level Calibration

0PMP05-RH-0001A

Residual Heat Removal Pump 2B Motor Inspection

Drawings

Number

Title

Revision

or Date

5S141f00024 SHT. 2

Auxiliary Feedwater

5A141F00024 SHT. 1

Auxiliary Feedwater

Miscellaneous

Documents

Number

Title

Revision or

Date

MC6426

IVC/AFW Cooling Load and Room Heat-Up

TB-17-3

7300 NAL Board Influenced by Voltage Transients Caused by

Unsuppressed Solid State Protection System Input Relay Coil

October 23,

2017

71111.18 - Plant Modifications

Condition Reports (CR)

18-10183

Work Authorization Number (WAN)

596738

Procedures

Number

Title

Revision

0PGP03-ZO-0009

Temporary Leak Repair

71111.19 - Post Maintenance Testing

Condition Reports (CRs)

18-10029

00-10707

18-10463

01-11834

98-7133

04-15971

18-10325

18-10371

Work Authorization Number (WAN)

584335

595897

2504

549316

547039

551744

596637

596675

596639

596688

Procedures

Number

Title

Revision

0PGP03-ZF-0001A

Hot Work Program

0PGP03-ZA-0514

Controlled System or Barrier Impairment

0PGP03-ZF-0018

Fire Protection System Functionality Requirements

0PGP03-DJ-0001

Class 1E Battery Monitoring and Maintenance Program

0PGP03-ZA-0010

Performing and Verifying Station Activities

0POP01-ZA-001

Plant Operations Department Administrative Guidelines

0PSP03-DG-0018

Standby Diesel 12(23) Twenty-Four Hour Load Test

0POP11-DJ-0002

Online Class 1E 125V DC Battery and Inverter Removal from

Service and Restoration

0PMP05-VA-0006

20 VAC NSSS Vital 10 KVA Inverter/Rectifier Maintenance

0PMP05-VA-0007

20 VAC NSSS Vital Inverter/Rectifier (10KVA) Performance

Test

0PMP05-CH-0003

York Chiller Inspection & Maintenance 300 Tons

71111.20 - Refueling and Other Outage Activities

Procedures

Number

Title

Revision

0PGP03-ZG-0008

Power Operations

71111.22 - Surveillance Testing

Condition Reports (CRs)

18-5583

18-8940

18-7676

18-8933

18-8940

Procedures

Number

Title

Revision

0PSP03-AF-0007

Auxiliary Feedwater Pump 14(24) Inservice Test

0PDP01-ZE-0002

Environmental Equipment Qualification Program

0PTP03-FP-0106

Fire Protection Water System Functional Test

0PGP03-ZF-0018

Fire Protection System Functionality Requirements

0PSP03-SP-0008A

SSPS Train A Quarterly Slave Relay Test

0PAP01-ZA-0101

Plant Procedure Writers Guide

0POP01-ZA-0016

Emergency Operating Procedure Writers Guide

0PSP03-CC-0007

Component Cooling Water System Train 1A(2A) Valve

Operability test

Drawings

Number

Title

Revision

or Date

7Q270F00006

Fire Protection Storage and Pumps

71114.01 - Exercise Evaluation

Condition Reports (CRs)

16-09927

16-10085

16-10119

16-10746

16-13401

16-15454

16-16045

17-14092

17-14845

17-15175

17-15177

17-15639

17-15956

17-15971

17-15974

17-18119

17-19076

17-19408

17-20136

17-20654

17-22006

17-23936

18-00745

18-02642

18-02752

18-03385

18-05590

18-05947

18-05948

18-06103

18-06387

18-06388

18-07528

18-07598

18-07599

18-07647

18-07645

18-07655

18-07657

18-07659

18-07662

18-07668

18-07669

18-07700

18-07737

18-07742

Procedures

Number

Title

Revision

South Texas Project Emergency Plan, ICN 20-19

June 1,

2017

0PGP03-ZX-0002

Condition Reporting Process,

ZV-0017

Expected Protected Area Exposures during Emergencies,

ZV-0019

Scenario Design and Development,

ZV-0027

Drill and Exercise Performance Objectives and

Demonstration Criteria,

0PGP05-ZV-0001

Emergency Response Exercises and Drills,

0PGP05-ZV-0003

Emergency Response Organization,

0PGP05-ZV-0006

Emergency Notification and Response System

0ERP01-ZV-EF01

Radiological Director

0ERP01-ZV-EF03

Radiological Director

0ERP01-ZV-TS01

TSC Manager

0ERP01-ZV-OS01

OSC Coordinator

0ERP01-ZV-OS03

Radiological Coordinator

0ERP01-ZV-OS06

Emergency Teams

0ERP01-ZV-OF02

Joint Information Center Activation, Operation, and

Deactivation

0ERP01-ZV-RE01

Recovery Operations

0ERP01-ZV-IN01

Emergency Classification

0ERP01-ZV-IN02

Notification to Offsite Agencies

0ERP01-ZV-IN03

Emergency Response Organization Notification

0ERP01-ZV-IN04

Assembly and Accountability

0ERP01-ZV-IN05

Site Evacuation

0ERP01-ZV-IN06

Radiological Exposure Guidelines

0ERP01-ZV-IN07

Offsite Protective Action Recommendations

0ERP01-ZV-SH01

Shift Manager

Miscellaneous

Documents

Number

Title

Revision

or Date

Blue Team Dress Rehearsal Final Report

May 1, 2018

Combined Functional Drill, Final Report, Blue Team,

March 1, 2018

April 9, 2018

71114.04 - Emergency Plan and Emergency Action Level Changes

Condition Reports (CRs)

18-07593

18-08045

Procedures

Number

Title

Revisions

ZV-0023

CFR 50.54(q) Screening Reference Document

0PGP05-ZV-0010

Emergency Plan Change

0ERP01-ZV-OS01

OSC Coordinator

0ERP01-ZV-OS02

Assistant OSC Coordinator

0ERP01-ZV-OS06

Emergency Teams

0PGP03-ZV-0001

Severe Weather Plan

0, 21

0PGP03-ZV-0002

Hurricane Plan

Miscellaneous

Documents

Number

Title

Revision

or Date

NOC-AE-18003586

South Texas Project, Units 1 and 2; Docket Nos.

STN 50-498; STN 50-499; Changes to South Texas

Project Electric Generating Station Emergency Plan

July 19, 2018

South Texas Project Electric Generating Station

Emergency Plan

0, 12, ICN

20-20

NOC-AE-17003490

South Texas Project Units 1 and 2, Docket Nos.

STN 50-498; STN 50-499, Changes to South Texas

Project Electric Generating Station Emergency Plan and

Implementing Procedure

June 15, 2017

Form 1, Screen

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number: 17-13142)

May 15, 2017

Form 2, Effectiveness

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number: 17-13142)

May 15, 2017

Form 1, Screen

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number: 17-13142)

May 4, 2017

Form 2, Effectiveness

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number: 17-13142)

May 4, 2017

Form 1, Screen

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number: 15-25466)

May 4, 2017

Form 2, Effectiveness

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number: 15-25466)

May 4, 2017

Form 1, Screen

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number 15-800)

May 4, 2017

Form 1, Screen

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number: 16-10746)

May 4, 2017

Form 2, Effectiveness

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number: 16-10746)

May 4, 2017

Form 1, Screen

Evaluation Form

Emergency Plan Change ICN 20-19

(CR Number: 17-13142)

May 15, 2017

Procedure 71

(STI 33867119)

Matagorda County Annex W Implementing Procedures,

Reception Center Operations

Letter from Matagorda County, Texas, to

Ms.

V. Wagnon, Emergency Response Division, STP

Nuclear Operating Company

November 7,

2017

Letter from Matagorda Regional Medical Center to

Ms.

V. Wagnon, Emergency Response Division, STP

Nuclear Operating Company

December 12,

2017

Letter from American Red Cross, Greater Houston Area

Chapter, to Ms.

V. Wagnon, STP Nuclear Operating

Company

October 12,

2017

Letter from Palacios Independent School District to

Ms.

V. Wagnon, Emergency Response Division

September 14,

2017

71114.06 - Drill Evaluation

Procedures

Number

Title

Revision

0ERP01-ZV-IN01

Emergency Classification

0ERP01-ZV-IN02

Notifications to Offsite Agencies

0ERP01-ZV-SH01

Shift Manager

0POP04-RC-0001

Radiation Monitoring

0POP04-MS-0001

Excessive Steam Demand

0POP05-EO-EO00

Reactor Trip or Safety Injection

0POP05-EO-EO10

Loss of Reactor or Secondary Coolant

0POP05-EO-EO20

Faulted Steam Generator

Miscellaneous

Documents

Number

Title

Date

RST 218.13

Enhanced E-Plan

July 24, 2018

71114.08 - Exercise Evaluation, Scenario Review

No additional documents were reviewed

71124.05 - Radiation Monitoring Instrumentation

Condition Reports (CRs)

16-14361

16-14363

16-15090

16-15117

16-15149

16-15448

16-05703

17-00514

17-13733

17-15060

17-15478

17-16951

17-17443

17-17496

17-21204

17-21451

17-21637

17-22536

17-23899

17-00833

18-01325

18-00429

18-00640

Procedures

Number

Title

Revision

0PRP05-RA-0002

Radiation Monitoring System Alarm Response

0PRP05-RA-0025

Non-Technical Specification Monitor Set Points

0PRP05-ZO-0025

Operation of the Eberline Model 1000B Calibrator

0PRP05-ZO-0094

Operation of Portable Area Monitors

0PRP05-ZO-0124

Operation of the Shepherd 89-400 Calibrator

0PRP05-ZR-0010

Health Physics Instrumentation Program

0PTP04-ZC-0022

Calibration of Area Alarm Monitors / Underwater Meters

0PTP04-ZC-0025

Calibration of the J.L. Shepherd 89-400 Calibration Source 2

0PTP04-ZC-0036

Calibration of the Eberline AMS-4 Air Monitoring System

0PTP04-ZC-0038

Calibration of the Eberline PPM-1 Portable Personnel

Monitor

0PTP04-ZC-0044

Calibration of Counting Instruments

0PTP04-ZC-0047

Calibration of the Siemens Environmental Systems

Limited/ Thermo Electron Corporation Electronic Personal

Dosimeter

0PTP04-ZC-0053

Calibration of Handheld Survey Meters / Ion Chambers

0PTP04-ZC-0054

Calibration of Area Monitors and Underwater Meters

0PTP04-ZC-0062

Maintenance Calibration of SAM Series Small Article

Monitors

0PTP04-ZC-0064

Monitor Calibration of Canberra Argos-5AB Whole Body

Monitors

0PTP04-ZC-0065

Monitor Calibration of Canberra GEM-5 Gamma Exit

Monitors

0PTP04-ZC-0066

Calibration of Ludlum 3030P Alpha-Beta Sample Counter

0PRP02-ZR-0011

Calibration of WBC System

0PRP10-ZL-0022

Quality Control of Radiological Laboratory Equipment

Calibration Records

Work Number

Title

Date

N1RA-RT-8100

Loop/Instrument N1RA-RT-8100 Area Radiation

Monitor

May 7, 2018

RA-1-87015882

Electrical Penetration Area Radiation Transmitter

April 6, 2017

155-00003-003

GEM-5 Gamma Portal Monitor-Unit 1 Egress

January 8, 2018

Calibration Records

Work Number

Title

Date

155-00004-008

ARGOS-5AB - Personnel Contamination Monitor -

Unit 1 Egress

February 16, 2018

155-00105-011

Eberline PCM1C - Personnel Contamination Monitor

- Unit 1 Hot Chem Lab

February 12, 2018

155-00149-009

SAM13 - the Tool & Equipment Monitor formerly

known as Small Article Monitor

July 10, 2018

Whole Body Counter Calibration Records

Number

Title

Date

U0502

Accuscan Calibration Verification 0PRP02-ZR-0011

June 21, 2018

U0502

Ortec Stand Fast Calibration 0PRP02-ZR-0011

June 19, 2018

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Condition Reports (CRs)

16-14361

16-15448

16-15117

17-01109

17-13049

17-23899

18-01649

18-02556

18-06605

18-06879

18-07624

Procedures

Number

Title

Revisions

OPSP07-VE-0002

Gaseous Effluent Particulate and Iodine Sampling and

Analysis

OPSP07-VE-0005

Gaseous Effluent Dose Assessment

OPCP07-ZS-0010

Waste Monitor Tank Sampling

OPSP07-WL-LPD

Liquid Effluent Permit

OPSP05-RA-8010A

Unit Vent Particulate and Iodine Effluent Monitor

Calibration (RT 8010A)

and 17

OPSP05-RA-8010B

MAB Unit Vent Wide Range Gas Monitor (RT 8010B)

and 20

OPSP05-RA-8038

Liquid Waste Processing System No. 1 Monitor

Calibration (RT -8038)

and 16

Audits and Self-Assessments

Number

Title

Date

LER 2017-002-00

Inoperable Control Room Envelope Makeup

Filtration System Heating Coil

January 22, 2018

Effluent Release Permits

Permit Number

Type

Release System

Date

2731

Liquid

Waste Monitor Tank - 2F

October 23, 2017

2768

Liquid

Waste Monitor Tank -1F

January 14, 2018

2834

Liquid

Waste Monitor Tank -2E

May 31, 2018

Calibrations and Surveillances

Work Order

System

Date(s)

500654 2858

Unit 1, Unit Vent Particulate and Iodine Monitor

RT-8010A

June 12, 2017

October 19, 2017

470609

500357

Unit 2, Unit Vent Particulate and Iodine Monitor

RT-8010A

February 5, 2016

July 20, 2017

454013

490785

Unit 1, Unit Vent Wide Range Particulate and Iodine

Monitor RT-8010B

July 16, 2015

January 12, 2017

489573

2605

Unit 2, Unit Vent Wide Range Particulate and Iodine

Monitor RT-8010B

January 27, 2017

February 6, 2018

477937

504294

Unit 1, Liquid Waste Processing Monitor RT-8038

May 3, 2016

September 20, 2017

473187

2680

Unit 2, Liquid Waste Processing Monitor RT-8038

March 1, 2016

August 3, 2017

Miscellaneous

Documents

Number

Title

Date

STI 34430426

2016 Radioactive Effluent Release Report

April 5, 2017

STI 34589689

2017 Radioactive Effluent Release Report

April 17, 2018

STI 34564851

Offsite Dose Calculation Manual Revision 20

February 1, 2018

71124.07 - Radiological Environmental Monitoring Program

Condition Reports (CRs)

16-14830

17-00229

17-01466

17-15605

17-15749

17-19558

17-21812

17-24091

17-24113

18-00093

18-02069

18-04004

18-07292

Procedures

Number

Title

Revision

0PGP03-ZO-0053 Radiological Ground Water Protection Program

0PRP10-ZL-0002

Quality Assurance for the Radiological Laboratory

0PRP10-ZL-0006

Sample Receipt, Accountability and Storage

0PRP10-ZL-0010

Preparation of Samples for Tritium Analysis by Liquid

Scintillation Counting

0PRP10-ZL-0011

Preparation of Samples for Gamma Analysis

0PRP10-ZL-0022

Quality Control of Radiological Laboratory Equipment

0PRP10-ZL-0030

Interlaboratory Radioassay Measurement Assurance Program 3

0PRP10-ZO-0003 Operation and Calibration of the Radiological Laboratorys

Gamma Counting System

0PRP10-ZU-0001 Radiological environmental monitoring program Sample

Collection

Audits and Self-Assessments

Number

Title

Date

MN-17-0-106455

Quality Monitoring Report: Offsite Dose Calculation

Manual and Effluent Monitoring

November 6,

2017

MN-18-0-106601

Quality Monitoring Report: Radiological Laboratory and

radiological environmental monitoring program Samples

February 19,

2018

MN-18-0-106927

Quality Monitoring Report: Annual Environmental

Operating Report

May 30,

2018

0PGP03-ZX-0003

Assessment Benchmark Report: QA Biannual radiological

environmental monitoring program Assessment

May 31,

2018

Calibrations and Surveillances

Number

Title

Date

PO 222036

Certificate of Calibration for Digital Air Sampler: 12656, 12661,

2667, 12668, 12669, 12670, 12671, 26057

February 14,

2018

WAN 548067

Structural Integrity Inspection of Primary Meteorological

Tower

April 25, 2018

WAN 452308

Below Grade Anchorage Inspection of Primary Meteorological

Tower

September

24, 2014

34583270

Primary Meteorological System Calibration

(60 Meter Tower)

November 30,

2017

34675520

Primary Meteorological System Calibration

(60 Meter Tower)

May 15, 2018

Miscellaneous

Documents

Number

Title

Revision

or Date

2016 Radioactive Effluent Release Report

April 5, 2017

2016 Annual Radiological Environmental Operating

Report

April 2017

2017 Radioactive Effluent Release Report

April 17, 2018

2017 Annual Radiological Environmental Operating

Report

April 2018

STI 34564851

Offsite Dose Calculation Manual

2017 Land Use Census

November 16,

2017

34577948

I&C Maintenance Qualification Checkout Card

November 20,

2017

STPEGS UFSAR: Chapter 2.3

0PRP10-ZL-0030

STPNOC 4th Quarter 2017 Measurement Assurance

Program (MAP) Samples

January 2,

2018

0PRP10-ZL-0030

STPNOC 1st Quarter 2018 Measurement Assurance

Program (MAP) Samples

March 28, 2018

10-22057-5

CFR 50.59 Evaluation: Primary and Backup Met

Tower Computer Upgrade

July 24, 2017

Tower Systems Inc. Inspection Report for 60M Rohn

  1. 80 Guyed Tower

April 25, 2018

Groundwater Protection Plan South Texas Project

June 4, 2018

71124.08 - Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation

Condition Reports

16-15125

17-14550

17-17816

17-18115

17-24019

2-05672

18-01038

18-01066

18-01874

18-03951

18-04328

Procedures

Number

Title

Revision

SEG-0001

System Engineering Administrative Guideline

WCG-0001

Work Screening and Processing

WGC-0002

Work Management Scheduling

0PGP03-ZA-0090

Work Process Program

0PGP03-ZA-0115

Hazardous Material Transportation Incident Response

Procedures

Number

Title

Revision

0PGP03-ZO-0017

Radioactive Waste Process Control Program

0PGP03-ZR-0053

Radioactive Material Control Program

0POP02-WS-0002

High Integrity Container (HIC) Dewatering for Shipment

and Burial

0POP02-WS-0003

Waste Transfer to the Portable Solidification System

OPRP03-ZR-0001

Determination of Radioactive Material Curie Content,

Reportability, DOT Sub-Type, and Waste Classification

OPRP03-ZR-0002

Radioactive Waste Shipments

OPRP03-ZR-0009

CFR 61 Sampling and Analysis Program

OPRP03-ZR-0010

Sorting and Processing of Radioactive Material

OPRP03-ZR-0011

Shipment of Radioactive Material

OPRP03-ZR-0012

Processing, Tracking, and Loading of Spent Radioactive

Filters

OPRP03-ZR-0014

On-Site Staging Facilities Operations

OPRP03-ZR-0016

Receipt Inspection of Polyethylene Reusable Waste

Containers

OPRP04-ZR-0015

Radiological Posting and Warning Devices

OPRP07-ZR-0013

Filter Replacement (Filters Stored in Room 218-J)

OPRP07-ZR-0014

Filter Replacement (Alternate Storage Locations)

OPRP07-ZR-0025

Preparation and Shipment of High Integrity Containers

and Polyethylene Reusable Waste Containers

OPRP11-ZR-0003

Radioactive Material Transportation Accidents

Audits and Self-Assessments

Number

Title

Date

MN-18-106590

Quality Monitoring Report

February 8, 2018

Snap Shot Self-Assessment Radwaste Shipping

Program concerning NRC Inspection

Procedure 71124 Attachment 08

June 6, 2018

Radioactive Material and Waste Shipments

Number

Title

Date

STP-0-17-060 48 In-Core Detectors / LSA II Class B

December 13, 2017

STP-1-16-062 Cask Dewatered Resin / WCS; Andrews, Texas

December 14, 2016

STP-1-18-033 Cask Dewatered Resin / WCS; Andrews, Texas

June 14, 2018

STP-2-17-004 Cask Dewatered SFP Class B Resin / WCS; Andrews,

Texas

February 16, 2017

STP-2-17-048 DAW LSA II/ WCS; Andrews, Texas

August 9, 2017

STP-0-17-020 UniTech Laundry Trailer, Oak Ridge, Tennessee

February 16, 2017

Miscellaneous

Documents

Number

Title

Revision

or Date

2016

Annual Radioactive Effluent Release Report

April 5, 2017

2017

Annual Radioactive Effluent Release Report

April 17, 2018

STPEGS UFSAR: Chapter 11

71151 - Performance Indicator Verification

Condition Reports (CRs)

18-07598

18-07599

Procedures

Number

Title

Revision

or Date

ZV-0013

Alert Radio Maintenance and Distribution,

ZV-0025

ERO Performance Tracking Guide,

0PGP05-ZV-0013

Performance Indicator Tracking Guide, Revision 8

0PGP05-ZV-0007

Prompt Notification System,

0PGP05-ZV-0016

Prompt Notification System Implementing Procedure,

SEG-0007

Mitigating System Performance Indicator Collection,

Processing and Maintenance of Data

Miscellaneous

Documents

Title

Date

MSPI Derivation Report (Emergency AC Power System)-

Unavailability Index

August 1,2018

MSPI Derivation Report (Emergency AC Power System)-

Unreliability Index

August 1, 2018

MSPI Derivation Report (High Pressure Injection System)-

Unavailability Index

August 1, 2018

MSPI Derivation Report (High Pressure Injection System)-

Unreliability Index

August 1, 2018

71152 - Problem Identification and Resolution

Condition Reports (CRs)

18-7612

18-3343

71153 - Follow-up of Events and Notices of Enforcement Discretion

Condition Reports (CRs)

18-10325

18-10360

Procedures

Number

Title

Revision

0POP04-FW-0001

Loss of Steam Generator Level Control

0POP04-VA-0001

Loss of 120VAC Class Vital Distribution

0POP04-RP-0003

Failure of RCS Loop Flow Transmitter

The following items are requested for the

Public Radiation Safety Inspection

at South Texas Project

Dates of Inspection: July 23 thru 27, 2018

Integrated Report 2018003

Inspection areas are listed in the attachments below.

Please provide the requested information on or before July 2, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1-A, applicable organization charts in file/folder 1-B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Natasha Greene at (817) 200-1154 or

Natasha.Greene@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

G. Powell

5.

Radiation Monitoring Instrumentation (71124.05)

Date of Last Inspection:

November 28, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Effluent monitor calibration

2. Radiation protection instrument calibration

3. Installed instrument calibrations

4. Count room and Laboratory instrument calibrations

B.

Applicable organization charts

C.

Copies of audits, self-assessments, vendor or Nuclear Procedures Issues Committee

(NUPIC) audits for contractor support and licensee event reports (LER), performed since

the date of the last inspection related to:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

or whole body counters

2. Installed radiation monitors

D.

Procedure index for:

1. Calibration, use, and operation of continuous air monitors, criticality monitors,

portable survey instruments, temporary area radiation monitors, electronic

dosimeters, teledosimetry, personnel contamination monitors, and whole body

counters.

2. Calibration of installed radiation monitors

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspectors reviews the

procedure index.

1. Calibration of portable ion chambers

2. Whole body counter calibration

3. Laboratory instrumentation quality control

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to the following programs:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

whole body counters

2. Installed radiation monitors

3. Count room radiation instruments

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspectors can perform word searches.

G.

Most recent calibration data for the whole body counters.

H.

Radiation Monitoring System health report for the previous 12 months

G. Powell

6.

Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

Date of Last Inspection:

November 28, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Radiological effluent control

2. Engineered safety feature air cleaning systems

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since the date of the last inspection, related to:

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

D.

Procedure indexes for the following areas

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspectors reviews the

procedure indexes.

1. Sampling of radioactive effluents

2. Effluent monitor setpoint determination

3. Generating radioactive effluent release permits

4. Laboratory instrumentation quality control

5. In-place testing of HEPA filters and charcoal adsorbers

F.

List of corrective action documents (including corporate and sub-tiered systems) written

since the date of the last inspection, associated with:

1. Radioactive effluents

2. Effluent radiation monitors

3. Engineered Safety Feature Air cleaning systems

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspectors can perform word searches.

G.

Annual Radioactive Effluent Release Reports for calendar years 2016 and 2017, or the

two most recent reports.

H.

Current revision of the Offsite Dose Calculation Manual

I.

The 2016 and 2017 inter-laboratory comparison results for laboratory quality control

performance of effluent sample analysis, or the two most recent results.

J.

Effluent sampling schedule for the week of the inspection

K.

New entries into 10 CFR 50.75(g) files since the date of the last inspection

L.

Operations department (or other responsible dept.) log records for effluent monitors

removed from service or out of service

M.

Listing or log of liquid and gaseous release permits since the date of the last inspection

N.

A list of the technical specification-required air cleaning systems with the two most

recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal

G. Powell

adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers

associated with the surveillances

O.

System Health Report for radiation monitoring instrumentation. Also, please provide a

specific list of all effluent radiation monitors that were considered inoperable for 7 days

or more since the date of the last inspection. If applicable, please provide the relative

Special Report and condition report(s).

P.

A list of significant changes made to the gaseous and liquid effluent process monitoring

system since the date of the last inspection. If applicable, please provide the

corresponding updated final safety analysis report section (UFSAR) in which this change

was documented.

Q.

A list of any occurrence in which a non-radioactive system was contaminated by a

radioactive system since the date of the last inspection. Please include any relevant

condition report(s).

G. Powell

7.

Radiological Environmental Monitoring Program (71124.07)

Date of Last Inspection:

January 9, 2017

A.

List of contacts and telephone numbers for the following areas:

1. Radiological environmental monitoring

2. Meteorological monitoring

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since the date of the last inspection, related to:

1. Radiological environmental monitoring program (including contractor environmental

laboratory audits, if used to perform environmental program functions)

2. Environmental TLD processing facility

3. Meteorological monitoring program

D.

Procedure index for the following areas:

1. Radiological environmental monitoring program

2. Meteorological monitoring program

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspectors reviews the

procedure indexes.

1. Sampling, collection and preparation of environmental samples

2. Sample analysis (if performed onsite)

3. Laboratory instrumentation quality control

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to the following programs:

1. Radiological environmental monitoring

2. Meteorological monitoring

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspectors can perform word searches.

G.

Copies of the two most recent calibration packages for the meteorological tower

instruments

H.

Copies of the 2016 and 2017 Annual Radiological Environmental Operating Reports and

Land Use Census, and current revision of the Offsite Dose Calculation Manual.

I.

Copy of the environmental laboratorys inter-laboratory comparison program results for

2016 and 2017, or the two most recent results, if not included in the annual radiological

environmental operating report

J.

Data from the environmental laboratory documenting the analytical detection sensitivities

for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)

K.

Quality Assurance audits (e.g., NUPIC) for contracted services

L.

Current NEI Groundwater Initiative Plan and status

G. Powell

M.

Technical requirements manual or licensee controlled specifications which list the

meteorological instruments calibration requirements

N.

If applicable, per NEI 07-07, provide any reports that document any spills/leaks to

groundwater since the date of the last inspection.

G. Powell

8.

Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation (71124.08)

Date of Last Inspection:

November 28, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Solid Radioactive waste processing

2. Transportation of radioactive material/waste

B.

Applicable organization charts (and list of personnel involved in solid radwaste

processing, transferring, and transportation of radioactive waste/materials)

C.

Copies of audits, department self-assessments, and LERs written since the date of the

last inspection related to:

1. Solid radioactive waste management

2. Radioactive material/waste transportation program

D.

Procedure index for the following areas:

1. Solid radioactive waste management

2. Radioactive material/waste transportation

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspectors reviews the

procedure indexes.

1. Process control program

2. Solid and liquid radioactive waste processing

3. Radioactive material/waste shipping

4. Waste stream sampling and analysis

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to:

1. Solid radioactive waste

2. Transportation of radioactive material/waste

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspectors can perform word searches.

G.

Copies of training lesson plans for 49 CFR 172 subpart H, for radwaste processing,

packaging, and shipping.

H.

A summary of radioactive material and radioactive waste shipments made from the date

of the last inspection, to present

I.

Waste stream sample analysis results and resulting scaling factors for 2016 and 2017,

or the two most recent results.

J.

A listing of onsite radwaste storage facilities. Please include a summary or list of the

items stored in each facility.

ML18347B541

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: BThakaran

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SPE/DRP/B

BC:DRP/B

NAME

BTharakan

NTaylor

SIGNATURE

/RA/

/RA/

DATE

2/13/18

2/13/18