Forwards IE Insp Rept 50-293/79-16 on 790807-10 & Notice of Violation
ML19256F089
Person / Time
Site: Pilgrim
Issue date: 09/14/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19256F085 List:
References
NUDOCS 7911210338
Download: ML19256F089 (2)


See also: IR 05000293/1979016

Text

,

F '

UNITED STATES

[p gg

o

NUCLEAR REGULATORY Commission

[

o

REGION I

$

$

831 PARK AVENUE

I

KING OF PRUS$lA PENNSYt.VANIA 19408

%[

,/

.....

Docket No. 50-293

SEP 14 1979

Boston Edison Company M/C Nuclear

AlTN: Mr. G. Carl Andognini

Manager, Nuclear Operations

Department

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection 50-293/79-16

This refers to the inspection conducted by Mr. R. Architzel of this office

on August 7-10, 1979, at Pilgrim Nuclear Power Station, Unit 1, Plymouth,

Massachusetts, of activities authorized by NRC License No. DPR-35 and to

the discussions of our findings held by Mr. Architzel with Mr. C. Van Trean

of your staff at the conclusion of the inspection, and to a subsequent

telephone discussion between Mr. D. Caphton of this office and Mr. A. Corry

on August 10, 1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that one of your activ-

ities was not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

This

item of noncompliance has been categorized into the levels as described in

our correspondence to you dated December 31, 1974. This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office a written statement or explanation in

reply including:

(1)correctivestepswhichhavebeentakenbyyouandthe

results achieved; (2) corrective steps which will be taken to avoid further

items of noncompliance; and (3) the date when full compliance will be

achieved.

1380

134

33%

7 911210 N

.,

..

Boston Edison Company M/C Nuclear

SEP 141979

2

.

With regard to this item your letter dated August 17, 1979 in response to

our letter and telephone conversation of August 10, 1979 and any subsequent

correspondence will be evaluated for adequacy and a separate response is

not required for this letter.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any such application must be accompanied by an affidavit executed by the

owner of the information, which identifies the document or part sought to

be withheld, and which contains a statement of reasons which addresses with

specificity the items which will be considered by the Commission as listed

in subparagraph (b)(4) of Section 2.790. The information sought to be

withheld shall be incorporated as far as possible into a separate part of

the affidavit.

If we do not hear from you in this regard within the spec-

ified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely.

-

_ .t --

d

. Brunner, Chief

Re ctor Operations and Nuclear

pport Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection Report Number

50-293/79-16

cc w/encls:

P. J. McGuire, Pilgrim Station Manager

A. Z. Roisman, Natural Resourses Defense Council (Without Report)

1380