ML19256F089
| ML19256F089 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/14/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G BOSTON EDISON CO. |
| Shared Package | |
| ML19256F085 | List: |
| References | |
| NUDOCS 7911210338 | |
| Download: ML19256F089 (2) | |
See also: IR 05000293/1979016
Text
,
F '
UNITED STATES
[p gg
o
NUCLEAR REGULATORY Commission
[
o
REGION I
$
$
831 PARK AVENUE
I
KING OF PRUS$lA PENNSYt.VANIA 19408
%[
,/
.....
Docket No. 50-293
SEP 14 1979
Boston Edison Company M/C Nuclear
AlTN: Mr. G. Carl Andognini
Manager, Nuclear Operations
Department
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection 50-293/79-16
This refers to the inspection conducted by Mr. R. Architzel of this office
on August 7-10, 1979, at Pilgrim Nuclear Power Station, Unit 1, Plymouth,
Massachusetts, of activities authorized by NRC License No. DPR-35 and to
the discussions of our findings held by Mr. Architzel with Mr. C. Van Trean
of your staff at the conclusion of the inspection, and to a subsequent
telephone discussion between Mr. D. Caphton of this office and Mr. A. Corry
on August 10, 1979.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Based on the results of this inspection, it appears that one of your activ-
ities was not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
This
item of noncompliance has been categorized into the levels as described in
our correspondence to you dated December 31, 1974. This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office a written statement or explanation in
reply including:
(1)correctivestepswhichhavebeentakenbyyouandthe
results achieved; (2) corrective steps which will be taken to avoid further
items of noncompliance; and (3) the date when full compliance will be
achieved.
1380
134
33%
7 911210 N
.,
..
Boston Edison Company M/C Nuclear
SEP 141979
2
.
With regard to this item your letter dated August 17, 1979 in response to
our letter and telephone conversation of August 10, 1979 and any subsequent
correspondence will be evaluated for adequacy and a separate response is
not required for this letter.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any such application must be accompanied by an affidavit executed by the
owner of the information, which identifies the document or part sought to
be withheld, and which contains a statement of reasons which addresses with
specificity the items which will be considered by the Commission as listed
in subparagraph (b)(4) of Section 2.790. The information sought to be
withheld shall be incorporated as far as possible into a separate part of
the affidavit.
If we do not hear from you in this regard within the spec-
ified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely.
-
_ .t --
d
. Brunner, Chief
Re ctor Operations and Nuclear
pport Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection Report Number
50-293/79-16
cc w/encls:
P. J. McGuire, Pilgrim Station Manager
A. Z. Roisman, Natural Resourses Defense Council (Without Report)
1380
135