IR 05000237/2023005
| ML24241A102 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 08/28/2024 |
| From: | Robert Ruiz NRC/RGN-III/DORS/RPB1 |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2024005 | |
| Download: ML24241A102 (1) | |
Text
SUBJECT:
UPDATED INSPECTION PLAN AND ASSESSMENT FOLLOW-UP LETTER FOR DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 (REPORT 05000237/2023005; 05000249/2024005)
Dear David P. Rhoades:
The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for the Dresden Nuclear Power Station, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Between April 14 and May 2, 2025, and March 2-20, 2026, the NRC will be performing a Functional Engineering Inspections in the areas of Fire Protection and Commercial Grade Dedication, respectively, at your facility.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
August 28, 2024 Please contact me at 630-829-9732 with any questions you have regarding this letter.
Sincerely, Robert Ruiz, Chief Reactor Projects Branch 1 Division of Operating Reactor Safety Docket Nos. 05000237, 05000249; and 07200037 License Nos. DPR-19 and DPR-25 Enclosure:
Inspection Plan cc: Distribution via LISTSERV Signed by Ruiz, Robert on 08/28/24
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available OFFICE RIII RIII NAME NShah:anm RRuiz DATE 08/28/2024 08/28/2024
Site Inspection Activity Plan 07200037 - Dresden (ISFSI)
07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count ISFSI Cask Loading Inspection
3/17/2025 3/21/2025 IP 60855 001001 Operation Of An ISFSI Prepared on 8/21/2024 9:56:06 AM 1 of 4
Site Inspection Activity Plan Dresden 07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count Radiation Protection Baseline Inspection
2,3 7/15/2024 8/16/2024 IP 71151 000746 Performance Indicator Verification 2,3 7/29/2024 8/2/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation 2,3 7/29/2024 8/2/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Security Baseline Inspection
2,3 7/29/2024 8/8/2024 IP 71130.01 000733 Access Authorization 2,3 7/29/2024 8/8/2024 IP 71130.02 000734 Access Control 2,3 7/29/2024 8/8/2024 IP 71130.09 001656 Security Plan Changes 2,3 7/29/2024 8/8/2024 IP 71151 001338 Performance Indicator Verification Inservice Inspection Unit 3
3 10/28/2024 11/8/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Eplan and EAL Changes Review
2,3 11/1/2024 12/31/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Radiation Protection Baseline Inspection
2,3 11/4/2024 11/8/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2,3 11/4/2024 11/8/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2,3 11/4/2024 11/8/2024 IP 71124.04 000728 Occupational Dose Assessment Security Baseline Inspection
2,3 11/18/2024 11/22/2024 IP 71130.14 000743 Review of Power Reactor Target Sets Material Control and Accountability
2,3 1/1/2025 12/31/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
Cyber Security Inspection
2,3 1/27/2025 1/31/2025 IP 71130.10 000741 Cybersecurity Biennial Problem Identification and Resolution Inspection
2,3 3/3/2025 3/21/2025 IP 71152B 000747 Problem Identification and Resolution Dresden April 2025 Initial License Examination
2,3 3/9/2025 3/13/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
2,3 4/13/2025 4/19/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
2,3 4/20/2025 4/26/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Emergency Preparedness Exercise Inspection / Performance Indicator Verification
2,3 4/7/2025 4/11/2025 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 2,3 4/7/2025 4/11/2025 IP 71151 001397 Performance Indicator Verification Force-On-Force Planning and Exercise Weeks - DRE
Prepared on 8/21/2024 9:56:06 AM 2 of 4
Site Inspection Activity Plan 2,3 4/7/2025 4/11/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2,3 4/28/2025 5/2/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Functional Engineering Inspection - Fire Protection
2,3 4/14/2025 5/2/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Radiation Protection Baseline Inspection
2,3 5/5/2025 5/9/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program 2,3 5/5/2025 5/9/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Dresden 2025 Biennial Requalification Program Inspection
2,3 5/18/2025 5/24/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Baseline Inspection
2,3 8/18/2025 8/22/2025 IP 71130.02 000734 Access Control 2,3 8/18/2025 8/22/2025 IP 71130.14 000743 Review of Power Reactor Target Sets 2,3 8/18/2025 8/22/2025 IP 71151 001338 Performance Indicator Verification 2,3 10/13/2025 10/17/2025 IP 71130.07 000739 Security Training 2,3 10/13/2025 10/17/2025 IP 71130.09 001656 Security Plan Changes Inservice Inspection Unit 2
2 10/27/2025 11/7/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Eplan and EAL Changes Review
2,3 11/1/2025 12/31/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Radiation Protection Baseline Inspection
2,3 11/3/2025 11/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2,3 11/3/2025 11/7/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2,3 11/3/2025 11/7/2025 IP 71124.04 000728 Occupational Dose Assessment Corporate Security Baseline Inspection
2,3 1/19/2026 1/23/2026 IP 71130.08 000740 Fitness-For-Duty Program Emergency Preparedness Baseline Inspection / Performance Indicator Verification
2,3 2/9/2026 2/13/2026 IP 71114.02 000717 Alert and Notification System Testing 2,3 2/9/2026 2/13/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2,3 2/9/2026 2/13/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 2,3 2/9/2026 2/13/2026 IP 71151 001397 Performance Indicator Verification Functional Engineering Inspection - Commercial Grade Dedication
2,3 3/2/2026 3/20/2026 IP 71111.21N.03 001808 Commercial Grade Dedication Security Baseline Inspection
2,3 4/6/2026 4/10/2026 IP 71130.05 000737 Protective Strategy Evaluation Security Baseline Inspection
Prepared on 8/21/2024 9:56:06 AM 3 of 4
Site Inspection Activity Plan 2,3 4/13/2026 4/17/2026 IP 71130.08 000740 Fitness-For-Duty Program Dresden April 2026 ILE
2,3 3/15/2026 3/21/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
2,3 4/12/2026 4/18/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
2,3 4/19/2026 4/25/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Radiation Protection Baseline Inspection
2,3 4/20/2026 4/24/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation Prepared on 8/21/2024 9:56:06 AM 4 of 4