ML20005A656

From kanterella
Revision as of 09:54, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Repts 50-317/81-09 & 50-318/81-09 on 810406-0503 & Notice of Violation
ML20005A656
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/11/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20005A657 List:
References
NUDOCS 8106300551
Download: ML20005A656 (2)


See also: IR 05000317/1981009

Text

.

__

y-

/p* *ca jo,

UNITED STATES

w

NUCLEAR REGULATORY COMMISSION

,

g

,~

g

3

8

REGION I

631 PARK AVENUE

8

'g.....[g-

KING OF PMUSSIA. PENNSYLVANIA 19406

Docket Nos. 50-317

50-318

,

. , .

..

.

Baltimore Gas and Electric Company

[ . , , s.,

' 3 '.x

ATTN: Mr. A. E. Lundvall, Jr.

sr ,9 N . h

'A'

Vice President, Supply

Q p#' , i 6-

.F.

l

1

.e M 3- H

P. O. Box 1475

S

.

Baltimore, Maryland 21203

.D

' J " .~,.ou.%

, _ . .

  • , . . - Q, :s
i

-V

'

Gentlemen:

-

'

{' .

Subject:

Inspection 81-09

~

.

This refers to the routine inspection conducted by Mr. Ralph E. Architzel

of this office on April 6-May 3, 1981 at the Calvert Cliffs Nuclear Power

Plant, Units 1 and 2 Lusby, Maryland of activities authorized by NRC

License Nos. OpR-53 and OPR-69 and to the discussions of our findings held

by Mr. Architzel with L. Russell and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, measurements

made by the inspector, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the items

of noncompliance brought to your attention in the enclosare to our letter

dated August 13, 1980 and January 15, 1981. We have no further questions

regarding your action at this time.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into the levels described

in the Federal Register Notice (45 FR 66754) dated October 7, 1980.

You

are required to respond to this letter and in preparing your response, you

should follow the instructions in Appendix A.

With respect to Appendix A, we note that you have corrected Item No. B, and

therefore you need not address yourself to this matter in your response.

\\

40

5. I t

1

i

810630055V

g

.

..

Baltimore Gas and Electric Company

2

JUN 111981

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

- and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information.

Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room. The telephone notification of your

.

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

.

Sincerely,

ec AG,L.h & L A

R.R.Keimig,dhief

Projects Branch #2, Division of

Resident and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Numbers 317/81-09; 318/81-09

cc w/encis:

R. M. Douglas, Manager, Quality Assurance

L. B. Russell, Plant' Superintendent

T. Sydnor, General Supervisor, Operations QA

R. C. . L. Olson, Principal Engineer

J. A. Tiernan, Manager, Nuclear Power

R. E. Danton, General Supervisor, Training and Technical Services