ML20005A656
| ML20005A656 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 06/11/1981 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML20005A657 | List: |
| References | |
| NUDOCS 8106300551 | |
| Download: ML20005A656 (2) | |
See also: IR 05000317/1981009
Text
.
__
y-
/p* *ca jo,
UNITED STATES
w
NUCLEAR REGULATORY COMMISSION
,
g
,~
g
3
8
REGION I
631 PARK AVENUE
8
'g.....[g-
KING OF PMUSSIA. PENNSYLVANIA 19406
Docket Nos. 50-317
50-318
,
. , .
..
.
Baltimore Gas and Electric Company
[ . , , s.,
' 3 '.x
ATTN: Mr. A. E. Lundvall, Jr.
sr ,9 N . h
'A'
Vice President, Supply
Q p#' , i 6-
.F.
l
1
.e M 3- H
P. O. Box 1475
S
.
Baltimore, Maryland 21203
.D
' J " .~,.ou.%
, _ . .
- , . . - Q, :s
- i
-V
'
Gentlemen:
-
'
{' .
Subject:
Inspection 81-09
~
.
This refers to the routine inspection conducted by Mr. Ralph E. Architzel
of this office on April 6-May 3, 1981 at the Calvert Cliffs Nuclear Power
Plant, Units 1 and 2 Lusby, Maryland of activities authorized by NRC
License Nos. OpR-53 and OPR-69 and to the discussions of our findings held
by Mr. Architzel with L. Russell and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, measurements
made by the inspector, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the items
of noncompliance brought to your attention in the enclosare to our letter
dated August 13, 1980 and January 15, 1981. We have no further questions
regarding your action at this time.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance have been categorized into the levels described
in the Federal Register Notice (45 FR 66754) dated October 7, 1980.
You
are required to respond to this letter and in preparing your response, you
should follow the instructions in Appendix A.
With respect to Appendix A, we note that you have corrected Item No. B, and
therefore you need not address yourself to this matter in your response.
\\
40
5. I t
1
i
810630055V
g
.
..
Baltimore Gas and Electric Company
2
JUN 111981
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding;
- and (b) submit within 25 days from the date of this letter a written application
to this office to withhold such information.
Consistent with section
2.790(b)(1), any such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or
part sought to be withheld, and which contains a full statement of the
reasons on the basis which it is claimed that the information should be
withheld from public disclosure.
This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you
in this regard within the specified periods noted above, the report will be
placed in the Public Document Room. The telephone notification of your
.
intent to request withholding, or any request for an extension of the 10
day period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
.
Sincerely,
ec AG,L.h & L A
R.R.Keimig,dhief
Projects Branch #2, Division of
Resident and Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection and Enforcement Inspection
Report Numbers 317/81-09; 318/81-09
cc w/encis:
R. M. Douglas, Manager, Quality Assurance
L. B. Russell, Plant' Superintendent
T. Sydnor, General Supervisor, Operations QA
R. C. . L. Olson, Principal Engineer
J. A. Tiernan, Manager, Nuclear Power
R. E. Danton, General Supervisor, Training and Technical Services