05000416/LER-1982-068, Forwards LER 82-068/03L-0

From kanterella
Revision as of 19:22, 16 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 82-068/03L-0
ML20065N361
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/08/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20065N363 List:
References
AECM-82-468, NUDOCS 8210220181
Download: ML20065N361 (1)


LER-1982-068, Forwards LER 82-068/03L-0
Event date:
Report date:
4161982068R00 - NRC Website

text

.Y o

]

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi N

P. O. B OX 1840, J AC K S O N. MIS SIS SIP PI 3 9 2 05 October 8, 1982 Nii[5N?i7d*[

Office of Inspection & Enforcement

'c

^

N U. S. Nuclear Regulatory Commission Region 11 C$

101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 4

J o^

~

." :n Attention:

Mr. J. P. O'Reilly, Regional Administrator 2

o tri c::a r, O

Dear Mr. O'Reilly:

. k' o

SUBJECT: Grand Gulf Nuclear SYhition.

Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Reactor Pressure Vessel Flange and lhad Flange Temperature Measureme'nt Reference: LER 82-068/03 L-0 AECM-82/468 Reactor pressure vessel flange and head flange temperatures were not monitored with periodicity required by T.S.4.4.6.1.4.a.

This is a reportable event under T.S.6.9.1.13.b.

Attached is LER 82-068/03 L-0 with supplementary information.

Yours truly, JPM: sap [v @

O Attachment cc:

Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T.

n 8210220181 821000 DR ADOCK 05000 ggyL Member Middle South Utiitties System