IR 05000324/2022403
| ML22119A135 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 05/09/2022 |
| From: | Gerald Mccoy NRC/RGN-II/DRS/EB2 |
| To: | Krakuszeski J Progress Energy Carolinas |
| References | |
| IR 2022403 | |
| Download: ML22119A135 (8) | |
Text
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY ASELINE SECURITY INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000325/2022403; 05000324/2022403
Dear Mr. Krakuszeski:
On July 11, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0 at your Brunswick Steam Electric Plant. The inspection will be performed to evaluate and verify your ability to provide assurance that your digital computer and communication systems and networks associated with safety, security, or emergency preparedness (SSEP) functions are adequately protected against cyber attacks in accordance with the requirements of Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, and the NRC approved Cyber Security Plan (CSP). The onsite portion of the inspection will take place during the week of July 11, 2022.
Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for the documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should be made available electronically no later than May 19, 2022. The inspection team will review this information and, by June 2, 2022, will request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection. This information will be requested for review in the regional office prior to the inspection by June 18, 2022, as identified above.May 9, 2022 The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, July 11, 2022.
The fourth group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Larry J. Jones Jr. We understand that our regulatory contact for this inspection is David Feitl of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 404-997-4837 or via e-mail at Larry.Jones@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Gerald McCoy, Branch Chief Engineering Branch 2 Division of Reactor Safety Docket No.: 50-325, 50-324 License No.: DPR-71, DPR-62 Enclosure:
Brunswick Steam Electric Plant Cyber-Security Inspection Document Request Signed by McCoy, Gerald on 05/09/22
ML22119A135 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available
OFFICE RII/DRS
NAME G. McCoy
DATE 05/09/2022
BRUNSWICK STEAM ELECTRIC PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Inspection Report: 05000325/2022403 and 05000324/2022403
Inspection Dates: July 11-15, 2022
Inspection Procedure: IP 71130.10, Cyber-Security, Revision 0
NRC Inspectors:Larry J. Jones Jr., Lead David Strickland 404-997-4837 404-997-4440 Larry.Jones @nrc.gov David.Strickland@nrc.gov
NRC Contractors: Alexander Prada Al Konkal Alexander.Prada@nrc.gov Alan.Konkal @nrc.gov
I. Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and CSP elements to develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the sample set required to be inspected by the cyber-security IP. The first RFIs requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office by May 19, 2022, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.
The inspection team will examine the returned documentation from the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI. The inspection team will submit the specific systems and equipment list to your staff by June 2, 2022, which will identify the specific systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection. We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by June 18, 2022.
Enclosure BRUNSWICK STEAM ELECTRIC PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST
The required Table RFI 1 information shall be provided electronically to the lead inspector by May 19, 2022. If a compact disk (CD) is provided, please provide four copies (one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
Table RFI #1 Request: IP Ref A list of all Identified Critical Systems and Critical Digital Assets,-
1 highlight/note any additions, deletions, reclassifications due to new Overall guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last cyber security inspection.
2 A list of EP and Security onsite and offsite digital communication Overall systems 3 Network Topology Diagrams to include information and data flow for Overall critical systems in levels 2, 3 and 4 (If available)
4 Ongoing Monitoring and Assessment program documentation 03.01(a)
5 The most recent effectiveness analysis of the Cyber Security Program 03.01(b)
6 Vulnerability screening/assessment and scan program documentation 03.01(c)
Cyber Security Incident response documentation, including incident detection, response, and recovery documentation as well as 03.02(a)
7 contingency plan development, implementation and including any and program documentation that requires testing of security boundary 03.04(b)
device functionality 8 Device Access and Key Control documentation 03.02(c)
9 Password/Authenticator documentation 03.02(c)
10 User Account/Credential documentation 03.02(d)
11 Portable Media and Mobile Device control documentation, including 03.02(e)
kiosk security control assessment/documentation Design change/ modification program documentation and a List of all 12 design changes completed since the last cyber security inspection, 03.03(a)
including either a summary of the design change or the 50.59 documentation for the change.
Supply Chain Management documentation including any security 03.03(a)
13 impact analysis for new acquisitions, (b) and (c)
Configuration Management documentation including any security 03.03(a)
14 impact analysis performed due to configuration changes since the last and (b)
inspection 15 Cyber Security Plan and any 50.54(p) analysis to support changes to 03.04(a)
the plan since the last inspection 16 Cyber Security Metrics tracked (if applicable) 03.06 (b)
BRUNSWICK STEAM ELECTRIC PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Table RFI #1 Request: IP Ref 17 Provide documentation describing any cyber security changes to the Overall access authorization program since the last cyber security inspection.
18 Provide a list of all procedures and policies provided to the NRC with Overall their descriptive name and associated number (if available)
19 Performance testing report (if applicable) 03.06 (a)
In addition to the above information please provide the following:
(1) Electronic copy of the UFSAR and technical specifications.
(2) Name(s) and phone numbers for the regulatory and technical contacts.
(3) Current management and engineering organizational charts.
Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of specific systems and equipment to your staff by January 4, 2021, for the second RFI (i.e., RFI #2).
II. Additional Information Requested to be Available Prior to Inspection.
As stated in Section I above, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by June 2, 2022, for the second RFI (i.e., RFI #2). The second RFI will request additional information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection. The additional information requested for the specific systems and equipment is identified in Table RFI #2. All requested information shall follow the guidance document referenced above
The Table RFI 2 information shall be provided electronically to the lead inspector by June 18, 2022. If a compact disk (CD) is provided, please provide four copies (one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
Table RFI #2 Request Items For the system(s) chosen for inspection provide:
1 Ongoing Monitoring and Assessment activity performed on the 03.01(a)
system(s)
BRUNSWICK STEAM ELECTRIC PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Table RFI #2 Request Items 2 All Security Control Assessments for the selected system(s) 03.01(a)
All vulnerability screenings/assessments associated with or scans 3 performed on the selected system(s) since the last cyber security 03.01(c)
inspection Documentation (including configuration files and rules sets) for Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),
4 Host-based Intrusion Detection Systems (HIDS), and Security 03.02(b)
Information and Event Management (SIEM) systems for system(s)
chosen for inspection)
Documentation (including configuration files and rule sets) for intra-5 security level firewalls and boundary devices used to protect the 03.02(c)
selected system(s)
6 Copies of all periodic reviews of the access authorization list for the 03.02(d)
selected systems since the last inspection 7 Baseline configuration data sheets for the selected CDAs 03.03(a)
8 Documentation on any changes, including Security Impact Analyses, 03.03(b)
performed on the selected system(s) since the last inspection 9 Copies of the purchase order documentation for any new equipment 03.03(c)
purchased for the selected systems since the last inspection 10 Copies of any cyber security drills performed since the last 03.02(a)
inspection, along with any reports or assessments generated. 03.04(b)
Copy of the individual recovery plan(s) for the selected system(s) 03.02(a)
11 including documentation of the results the last time the backups 03.04(b)
were executed.
Corrective actions taken as a result of cyber security incidents/issues 12 to include previous NRC violations and Licensee Identified Violations 03.05 since the last cyber security inspection
III. Information Requested to be Available on First Day of Inspection
For the specific systems and equipment identified in Section II above, provide the following RFI (i.e., Table 1ST Week Onsite) electronically by July 11, 2022, the first day of the inspection.
Table 1ST Week Onsite Request: Items 1 Any cyber security event reports submitted in accordance with 10 03.04(a)
CFR 73.77 since the last cyber security inspection Updated Copies of corrective actions taken as a result of cyber 2 security incidents/issues, to include previous NRC violations and 03.05 Licensee Identified Violations since the last cyber security inspection, as well as vulnerability-related corrective actions
BRUNSWICK STEAM ELECTRIC PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
a. Updated Final Safety Analysis Report, if not previously provided
b. Original FSAR Volumes
c. Original SER and Supplements
d. FSAR Question and Answers
e. Quality Assurance Plan
f. Technical Specifications, if not previously provided
g. Latest IPE/PRA Report
(2) Vendor Manuals, Assessment and Corrective Actions:
a. The most recent Cyber-Security Quality Assurance (QA) audit and/or self-assessment
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent Cyber-Security Quality Assurance (QA) audit and/or self-assessment.
IV. Information Requested To Be Provided Throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.
(2) inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member)
If you have any questions regarding the information requested, please contact the inspection team leader.
5