Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010
ML22172A033
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/27/2022
From: James Baptist
Division of Reactor Safety II
To: Krakuszeski J
Duke Energy Progress
References
IR 2022010
Download: ML22172A033 (12)


Text

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT - DESIGN BASIS ASSURANCE INSPECTION (TEAMS) INSPECTION REPORT 05000324/2022010 AND 05000325/2022010

Dear Mr. Krakuszeski:

On May 13, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, James B. Baptist, Chief Engineering Br 1 Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000324 and 05000325

License Numbers:

DPR-62 and DPR-71

Report Numbers:

05000324/2022010 and 05000325/2022010

Enterprise Identifier:

I-2022-010-0037

Licensee:

Duke Energy Progress, LLC

Facility:

Brunswick Steam Electric Plant

Location:

Southport, NC

Inspection Dates:

April 25, 2022 to May 13, 2022

Inspectors:

P. Braxton, Reactor Inspector

C. Franklin, Reactor Inspector

L. Haeg, Project Manager

T. Su, Reactor Inspector

Approved By:

James B. Baptist, Chief

Engineering Br 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (teams) inspection at Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21M - Design Bases Assurance Inspection (Teams) The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience:

Design Review - Risk-Significant/Low Design Margin Components (IP Section 02.02) (5 Samples)

(1) Unit 2 Emergency Diesel Generator (EDG) Load Timing Relays 2-DG4-STR/2B-3/4

System transient requirements

Modification performed affecting Design Basis Functions

Operating Environment

Operating Procedures

Surveillance test procedures and performed procedures

System health reports

(2) Unit 2 DC Battery/Battery Charger 2-2A-1-125VDC-CHRGR/BAT, 2-2A-2-125VDC-CHRGR/BAT

Compliance with Updated Final Safety Analysis (UFSAR) and Technical Specifications (TS), and Design Basis Document (DBD)

Material condition and configuration

Operating environment

Consistency between station documentation (e.g. procedures) and vendor specifications

Maintenance effectiveness

Designs requirements

Surveillance testing

(3) Unit 1 Instrument Air N2 Solenoids 1-RNA-SV-5481/5482

System transient requirements

Modification performed affecting Design Basis Functions

Operating Environment

Operating Procedures

Backup Nitrogen Surveillance test procedures reviews

(4) Unit 1 High Pressure Coolant Injection (HPCI), Reactor Core Isolation Cooling (RCIC)1-E41-C001, 1-E51-C001)

Material condition and configuration (e.g., visual inspection during a walkdown)

Operating environment

Design calculations (pump head, capacity, NPSH)

Consistency among design and licensing bases and other documents/procedures

Maintenance effectiveness and records, and corrective action history

Operating procedures

Surveillance testing and recent test results

Component health reports

(5) Unit 2 Nuclear Service Water (NSW)/ Common Service Water (CSW) Pumps and Strainers 2-SW-2A-NUC-PMP, 2-SW-2B-NUC-PMP, 2-SW-2C-CONV-PMP

Material condition and configuration (e.g., visual inspection during a walkdown)

Operating environment

Design calculations (pump head, capacity, NPSH)

Consistency among design and licensing bases and other documents/procedures

Maintenance effectiveness and records, and corrective action history

Operating procedures

Surveillance testing and recent test results

Component health reports Design Review - Large Early Release Frequency (LERFs) (IP Section 02.02)===

(1) Unit 2 Residual Heat Removal (RHR) Heat Exchangers (HX) and Bypass Valve 2-E11-B00B1B, 2-E11-F048B

Material condition and configuration (e.g., visual inspection during a walkdown)

Operating environment

Design calculations

Consistency among design and licensing bases and other documents/procedures

Maintenance effectiveness and records, and corrective action history

Operating procedures

Surveillance testing and recent test results

Component health reports

Modification Review - Permanent Mods (IP Section 02.03) (6 Samples)

(1) EC297884 - 885 - Replace Unit 1/2 CST Lo Level Transmitter
(2) EC408563 - 565 - Replace EDG Sync Check Relays
(3) EC418443 -UAT Backfeed breaker Modification
(4) EC295433 - NSW/CSW Pump Replacements
(5) EC296462, 65, 74 - 1C, 2B, 4C EDG Governor Replacement
(6) EC416835 - RWCU Valve 1-G31-F004 Replacement

Review of Operating Experience Issues (IP Section 02.06) (2 Samples)

(1) IN 2021-01 Lessons Learned from POV DBAI
(2) IN 2010-25 Inadequate Electrical Connections

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On May 13, 2022, the inspectors presented the design basis assurance inspection (teams) inspection results to John A. Krakuszeski and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

89-068-2

HPCI Minimum Flow Calculation

Rev. 0

27-8-E41-06-F

NPSH Requirements - RCIC and HPSI

Rev. 0

BNP-E-6.079

Unit 1 & 2 - 125 V DC Battery Charger Sizing Calculation

Rev. 10

BNP-E-6.083

Unit 2 125/250 VDC Coordination Protection

Calculation

Rev. 10

BNP-E-6.085

Unit 2 125/250 V DC Coordination/Protection Calculation

Rev.8

BNP-E-6.087

Unit 2 124/250V DC Power Cable Ampacity

Rev. 12

BNP-E-6.120

25/250V DC System Battery Load Study

Rev.15

BNP-E-7.002

AC Auxiliary Electrical Distribution System Voltage/ Load

Flow/Fault Current Study

Rev. 16

DBD-51

DC Electrical System

Rev. 16

G0050A-12

BNP Unit No. 2 SWS Hydraulic Analysis

Rev. 13

G0050A-18

SW System Instrumentation and Control Setpoint Review

Rev.1

G0050A-20

Hydraulic Analysis of the Cooling Water Intake Canal and

Pump Intake Structure

Rev. 0

M-89-0021

HPCI/RCIC NPSH with Suction from the CST

Rev. 0

M-89-0021

HPCI/RCIC NPSH with Suction from the CST

Rev. 0

OSWB-0006

SW Intake Structure Heat Loads and Ventilation

Requirements

Rev.1

Calculations

PCN-G0050A-13

NSW and CSW Pressure Switch Setpoints for Pump Auto

Start,

Rev. 4

71111.21M

Corrective Action

Documents

717634,

258503,

259496,

261604,

277159,

287709,

2343684,

2349302,

2375869,

2380075,

2383437,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2391622,

2411224,

2421361, 96-

01675,

283394,

2337098,

2349404,

2349869,

2354643,

2359058,

2364279,

2396560, AR

106230-10, AR

00697175

25459

Typographical Error in Calculation PCN-G0050A-13

26668

Pipe Stress Calcs not Analyzed to Maximum Allowed

Temperature

27208

Inadequate Documentation - SW Shear Key Failure

Evaluations

Corrective Action

Documents

Resulting from

Inspection

NCR 1676661

Missing Documentation of scaled model testing of the CST

C24004

Inservice Inspection Isometric for Class II High Pressure

Coolant Injection System

Rev. 2

D-02041

Sht. 2, Piping Diagram, Service Water System

Rev. 67

D-02041

Sht. 1, Piping Diagram, Service Water System

Rev. 65

D-02529

Sht. 1, Piping Diagram, Reactor Core Isolation Cooling

System

Rev. 62

D-25023

Reactor Building High Pressure Coolant Injection System

Piping Diagram

Rev. 61

F-03026

Emergency Key One Line Diagram 4160V, 480V, 120/208V,

20/240V AC & 24/48V, 125/250V DC

Rev. 13

Drawings

F03006

Single Line Diagram 125/250V DC System Distribution

Switchboard 2A & 2B

Rev.39

416835

RWCU Valve 1-G31-F004 Replacement

Engineering

Changes

417289

Valve Data Sheet for 1-G31-F004

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EC 054587

HPCI CST Vortexing Update

05/11/2007

EC 055880

Evaluate LL3 Avoidance with RCIC Operation Post Scram

Rev.1

EC 074364

RCIC Pump Performance Criteria Revision to OPT-10.1.1

Rev. 0

EC 286411

Jet Air Assist Upgrades

Rev. 56

EC 286413

Relay and Timing Upgrades

Rev. 62

EC 295433,

Service Water Pump Replacement Master

Rev. 16

EC 296794

Replace CST Low Water Level Transmitters

Rev. 8

EC 400469

Service Water Pump Replacement Child EC

Rev. 5

EC 408563

Emergency Diesel Generator No. 1 Sync Check Relay

Rev. 0

Engineering

Evaluations

8001818-ER-1

Evaluation of the Flywheel 2301A Governor Upgrade on

Nordberg Model FS-1316-HSC EDG

2/08/2013

AR 02144470

For Master EC 295433 - SW Pump Replacements

08/17/2017

BN-16.0.1

RCIC System

Rev. 5

CSD-EG-DEP-

0106

AC and DC Overcurrent Protection and Coordination

DBD-19

High Pressure Coolant Injection System

Rev. 27

DBD-39

Emergency Diesel Generator and Supplemental Diesel

Generator System

Rev. 28

DBD-43

Service Water System

Rev.18

DBD-46

Instrument Air & Service Air Systems

Rev. 19

FP-3808

Battery Charger Manual

Rev. H

FP-3902

Stationary Battery Manual

Rev. M

PGB005-PR-01

Diesel Generator Governor Replacement Study for the

Brunswick Nuclear Plant

8/13/2008

QCE 02061145-

1A NSW Pump Strainer Shear Pin Sheared

10/20/2016

SD-43

Service Water System

Rev. 27

Time Critical

Operator Action

Validation ASSD

RCIC In Service and Injecting into Reactor Pressure Vessel

11/25/2017

Miscellaneous

Time Critical

Operator Action

Battery Chargers are Re-Energized

09/25/2016

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Validation SBO 2

0AOP-18.0

NSW System Failure

Rev. 34

0AOP-19.0

Conventional Service Water System Failure

030

0AOP-19.0,

CSW System Failure

Rev. 30

0AOP-20.0

Pneumatic (Air/Nitrogen) System Failures

Rev. 52

0AOP-39.0

Loss of DC Power

2

0ASSD-01

Alternative Safe Shutdown Procedure Index

0ASSD-02

Control Building

0EOP-01-ATWS

ATWS

000

0EOP-01-FSG-16

Loss of All AC and DC Powered Injection

004

0EOP-01-SBO-10

Battery Load Stripping

2

0PT-08.2.2B

LPCI/RHR System Operability Test Loop B

03/22/2022

0PT-09.2

HPCI System Operability Test

04/05/2022

0PT-09.8

HPCI System Coupled Overspeed Trip Test

2/17/2020

0PT-10.1.1

RCIC System Operability Test

04/05/2022

0PT-10.1.3

RCIC System Operability Test Flowrates at 150 psig

04/03/2022

0PT-10.1.8

RCIC System Valve Operability Test, Rev. 45,

01/12/2022

0SMP-GOV001

Governor Dynamic Tunning

Rev. 2

1EOP-01-SBO

Station Blackout

004

1OP-16

RCIC System Operating Procedure

Rev. 93

2OP-43

SWS Operating Procedure

Rev. 175

2PT-24.1-2

SW Pump and Discharge Valve Operability Test, Rev. 89

03/17/22

2PT-24.1-2

SW Pump and Discharge Valve Operability Test, Rev. 89

03/17/2022

AD-OP-ALL-0205

Time Critical Actions/Time Sensitive Actions

AD-PI-ALL-0100

Corrective Action Program

Rev. 26

AD-PI-ALL-0400

Operating Experience Program

AS-OP-BNP-

205

BNP Time Critical Actions/Time Sensitive Actions

Supplement

FP-61761

Valves and operators

AG

Procedures

OPT-51.7

RCIC System EOP Component Functional Test, Rev. 4

03/16/2020

Work Orders

20066716-01,

20386029-02,

13527308-01,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

20410987-43,

20397484-05,

20397484-06,

20397581-05,

20411001-01,

20437889-03,

20465428-01,

20465428-02,

20483386-01,

20483386-02,

20495775-01,

20499261-01,

20499261-02,

20512084-01