ML22363A100
| ML22363A100 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/07/2022 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2022-17234 | |
| Download: ML22363A100 (1) | |
Text
.LJt::L.. U / 1 L.UL.L.
Page 1 of 2
- MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2022-17234
USER INFORMATION:
GERLACH*ROSEY M EMPL#: 028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194
TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY M 12/07/2022 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON I
THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID !S THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS AR.oM THE; HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF
,alfRRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1
REMOVE MANUAL TABLE OF CONTENTS DATE: 12/05/2022
ADD MANUAL TABLE OF CONTENTS DATE: 12/06/2022
CATEGORY: DOCUMENTS TYPE: TRMl
LJt::L.. U /, L.U.GL.
Page 2 of 2 ID: TEXT 2.2 REMOVE: REV:10
ADD: REV: 11
ANY DISCREPANCIES, WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIE,W THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL
Manual Name: TRMl
. anual Title : TECHNICAL REQUIREMENTS MANUAL UNIT 1
Table Of Contents Issue Date: 1 2/06/2022 Procedure Name Rev Issue Date Change ID Change Numb er TEXT LOES 96 01/03/201 9
Title:
LIST OF EFFECTIVE SECTIONS
TE XT TO C 28 05/13/2022 Title : TABLE OF CONTENTS
TEXT 1.1 1 0 1 /31/2014
Title:
US E AND APPLICATION DEFINITIONS
TEXT 2.1 2 04/28/2015
Title:
PLANT PROGRAMS AND
TEXT 2.2 11 12/06/20 22
Title:
PLANT PROGRAMS AND TRIP SETPOINT TABLE
TE XT 3.0 7 3 Title : TECHNICAL REQUIREMENT FO OP ERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)
APP L ICABILITY TEXT 3.1. 1 11 /09/2007
Title:
REACTIVITY CONTR AN T ICIPA TED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJ ECTI ON ( - INSTRUMENTATION TEXT 3. 1.2 0 11/18/2002
Title:
REACTIVIT CONT RO L ROD DRIVE (CRD) HOUSING SUPPORT
TEXT 3.1. 3 6 12/18/2017
Title:
REACTIVITY CONTROL SYS TEMS CONTR OL ROD BLOCK INSTRUMENTAT ION
TE XT 3.1. 4 1 10/12/2020
Title:
REACTIVITY CONTROL SYST EMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTAT ION &
CHECK VALVE TE XT 3.2.1 21 03/29/2022 Title : COR E OPERAT ING LIMIST REPORT (COLR)
Page 1 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
lanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
- TEXT 3.3.1 0 11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION
TEXT 3.3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION
TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION
TEXT 3.3.4 11 06/29/2017
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION
TEXT 3.3.5 0 11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK
'EXT 3. 3. 6 5 03/05/2019
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION
- TEXT 3.3.7 4 01/17/2022
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM
TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION INTENTIONALLY LEFT BLANK
TEXT 3.3.9 3 04/17/2008
Title:
OPRM INSTRUMENTATION CONFIGURATION
TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS
TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION
TEXT 3.3.12 2 04/02/2019
Title:
WATER MONITORING INSTRUMENTATION
- Page 2 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
.tanual
Title:
TECHNICAL REQUIREMENTS MANUAL DNIT 1
TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY
TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM INTENTIONALLY LEFT BLANK
TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS
TEXT 3.4.4 2 04/17/2008
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT
TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS
.'EXT 3. 4. 6, 3 05/13/2022
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION
TEXT 3.5.1 2 03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT
TEXT 3.5.2 2 -03 / 05/2019
~
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3 1 03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTRO~ AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS
TEXT 3.6.1 0 11/18/2002
Title:
CONTAINMENT VENTING OR PURGING
TEXT 3.6.2 3 01/03/2019
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION
TEXT 3. 6. 3 0 11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION
Page 3 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
!anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
- J
TEXT 3.6.4 0 11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES
TEXT 3.7.1 0 11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN
TEXT 3.7.2 0 11/18/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (URS) AND GROUND WATER LEVEL
TEXT 3.7.3.1 6 04/21/2022
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM
TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS
'EXT 3. 7. 3. 3 4 05/16/2016
Title:
PLANT SYSTEMS CO2 SYSTEMS
- TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS
TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS
TEXT 3.7.3.6 2 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES
TEXT 3.7.3.7 1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES
TEXT 3.7.3.8 13 12/18/2017
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION
TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM
- Page 4 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
.ranu~l
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT 3.7.5.1 1 03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR
TEXT 3.7.5.2 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE
TEXT 3.7.5.3 1, 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS
TEXT 3.7.6 3 06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION
TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING
- EXT 3.7.8 5 03/05/2015
Title:
PLANT SYSTEMS SNUBBERS
TEXT 3.7.9 3 03/05/2019
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC
TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1 11/01/2018
Title:
STRUCTURAL INTEGRITY
TEXT 3.8.1 3 04/22/2020
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES
TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS
TEXT 3.8.2.2 3 06/23/2021
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC
Page 5 of 16 Report Date: 12/06/22
(
SSES MANUAL
Manual Name: TRMl
tanual
Title:
TECFJNICAL REQUIREMENTS MANUAL UNIT 1
- TEXT 3.8.3 4 01/28/2020
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES
TEXT 3. 8. 4 0 11/18/2002
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM
TEXT 3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION
TEXT 3.8.6 2* 03/05/2019
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING
TEXT 3.8.7 2 02/25/2021
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM
'EXT 3. 9.1 0 11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME
- TEXT 3.9.2 0 11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS
TEXT 3.9.3 1 03/12/2019
Title:
REFUELING OPERATIONS REFUELING PLATFORM
TEXT 3.10.1 1 04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION
TEXT 3.10.2 3 06/19/2019
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION
TEXT 3.10.3 4 10/05/2022
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2 04/17/2008
Title:
INTENTIONALLY LEFT BLANK
- Page 6 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
.tanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT 3. 11. 1. 1 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION
TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE
TEXT 3. 11. 1. 3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM
TEXT 3. 11. 1. 4 2 10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION
TEXT 3. 11. 1. 5 3 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
."'EXT 3.11.2.1 4 03/12/2019 Title1 RADIOACTIVE EFFLUENTS DOSE RATE
TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES
TEXT 3. 11. 2. 3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM
TEXT 3. 11. 2. 4 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM
TEXT 3. 11. 2. 5 4 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM
TEXT 3.11.2.6 8 06/29/2017
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION
TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE
Page 7 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
1 {anual
Title:
TECHlHCAL REQUIREMENTS MANUAL UNIT 1
TEXT 3. 11. 4. 1 6 01/03/2022
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM
TEXT 3.11. 4. 2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS
TEXT 3. 11. 4. 3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM
TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL
TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS
'EXT 3.12. 3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT
- TEXT 4.1 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION
TEXT 4.2 1 01/03/2019
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION
TEXT 4.3 1 01/03/2019
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION
TEXT 4.4 1 12/18/2008
Title:
ADMINIS~TIVE CONTROLS PROCEDURES & PROGRAMS I
TEXT 4.5 1 07/01/2021 Title,: ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS
TEXT 4.6 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM
- Page 8 of* 16 Report Date: 12/06/22 SSES MANUAL
Manual Namez TRMl
.tanual Titlez TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT 4.7 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS TRAINING
TEXT B3.0 6 03/18/2021
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY
TEXT B3.l.l 2 04/29/2014.
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION
TEXT B3.l.2 0 11/19/2002
Title:
REACTIVITY, CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT
TEXT B3.l.3 4 12/18/2017
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION
- 'EXT B3.1. 4 1 10/12/2020
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMOLATORS INSTRUMENTATION AND CHECK VALVE
TEXT B3.2.l 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
- TEXT B3.3.l 1 01/31/2014 \\
Title:
INSTROMENTATION BASES RADIATION MONITORING INSTRUMENTATION
TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION
TEXT B3.3.3 3. 12/18/2008
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION
TEXT B3.3.4 7 06/29/2017
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION
TEXT B3.3.5 2 11/09/2007
Title:
INTENTIONALLY LEFT BLANK
Page 9 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
tanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
- TEXT B3.3.6 6 03/05/2019
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION
TEXT B3.3.7 4 01/17/2022
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM
TEXT B3.3.8 1 10/22/2003
Title:
INTENTIONALLY LEFT BLANK
TEXT B3.3.9 4 01/03/2019
Title:
OPRM INSTRUMENTATION
TEXT B3. 3.10* 3 os/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS
'EXT B3.3.ll 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION
- TEXT B3.3.12 1 04/02/2019
Title:
WATER MONITORING INSTRUMENTATION
TEXT B3.4.l 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY
TEXT B3.4.2 1 04/16/2009
Title:
INTENTIONALLY LEFT BLANK
TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR
TEXT B3.4.4 0 l_l/19 /2 0 02
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND 'ROD LINE LIMIT
TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS
- Page 10 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
.tanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT B3.4.6 4 05/13/2022
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION
TEXT B3.5.1 2 03/17/2020
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYS~M ADS MANUAL INHIBIT r
TEXT B3.5.2 2 03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION
\\'
TEXT B3.5.3 2 03/05/2019
Title:
ECCS RPV WATER INVEN1'ORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS
TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING
.'EXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION
TEXT B3.6.3 2 04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION
TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES
TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UBS) GROUND WATER LEVEL
TEXT B3.7.3.1 4 02/16/2017
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM
TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS
Page 11 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
tanual
Title:
TECHNICAL REQUIREMENTS MANUAL TIN IT 1
TEXT B3.7.3.3 1 01/03/2019
Title:
PLANT SYSTEMS BASES CO2 SYSTEMS
TEXT B3.7.3.4 4 06/19/2019
Title:
PLANT SYSTEMS BASES HALON SYSTEMS
TEXT B3.7.3.5 1 04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS'
TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES
TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES
'EXT B 3. 7. 3. 8 3 09/27/2012
Title:
PLANT SYSTEMS BASES 'FIRE DETECTION INSTRUMENTATION
TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM
TEXT B3.7.5.l 0 11/19/2002
,Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR
TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE
TEXT B3.7.5.3 \\ 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS \\
TEXT B3.7.6 4 06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION
TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION
Page 12 of 16 Report Date: 12/06/22 SSES MANUAL
Manual* Name: TRMl
.tanual
Title:
TECHNICAL REQUIREMENTS MANUAL DNIT 1
TEXT B3.7.8 4 01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS
TEXT B3.7.9 3 03/05/2019
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC
TEXT B3.7.10 1 12/14/2004 Titlez PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS
TEXT B3.7.ll 2 11/01/2018
Title:
STRUCTURAL INTEGRITY
TEXT B3.8.l 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES
.'EXT B3.8.2.l 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION - f CONTINUOUS (
TEXT B3.8.2.2 2 06/23/2021
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC
TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVI,TIES
TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM
TEXT B3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION
TEXT B3.8.6 3 03/05/2019
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING
TEXT B3.8.7 3 02/25/2021
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM
Page 13 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
Ianual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 I
TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME I
TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS
TEXT B3.9.3 1 03/12/2019
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM
TEXT B3.10.l 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION I
TEXT B3.10.2 1 03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION
'EXT B3.10. 3 3 10/05/2022
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 1 04/17/2008
Title:
INTENTIONALLY LEFT BLANK
TEXT B3.ll.l.l O 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION
TEXT B3. 11. 1. 2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE
TEXT B3.ll.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYS'TEM
TEXT B3.11.1. 4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION
TEXT B3.ll.l.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
Page 14 of 16 Report Date: 12/06/22 SSES MANUAL
Manual Name: TRMl
.Ianual
Title:
TECIDIICAL REQUIREMENTS MANUAL DNIT 1
TEXT B3.ll.2.l 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE
TEXT B3.11. 2. 2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE'- NOBLE GASES
TEXT B3.ll.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM
TEXT B 3. 11. 2. 5 5 07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM
.'EXT B3.ll.2.6 2 09/08/2016 Title; RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3. 11. 3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE
TEXT B3. 11. 4. 1 6 01/03/2022
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM
TEXT B3.ll.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS
TEXT B3.ll.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM
TEXT B3.12.l 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL
TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS
Page 15 of 16 Report Date: 12/06/22 SSES.MANO'AL
Manual Name: TRMl
tanual
Title:
TECHNICAL REQUIREMENTS MANUAL' UNIT 1
- TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS
/
r
Page 16 of 16 Report Date: 12/06/22 Instrument Trip Setpoint Program Rev. 11 2.2
2.0 PLANT PROGRAMS AND SETPOINTS
2.2 Instrument Trip Setpoint Table
The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements.
Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.
Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.
Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.
Reference:
MFP-QA-1220, Engineering Change Process Handbook
SUSQUEHANNA - UNIT 1 TRM /2.0-5 Instrument Trip Setpoint Program Rev. 11 2.2
- TABLE 2.2-1 (Page 1 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TROJ TRIP FUNCTION TRIP SETPOINT
22.1 Reactor Protection
2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux -~ 120/125 divisions of full scale High 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron s 18% of RATED 11-IERMAL PO'NER Flux - High (Setdown) 2.2.1.3 3.3.1.1 Average Power Range Monitor, Simulated 0.55 W + 58. 7%
Thermal Power - High, Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Simulated 0.55 0/V-11\\/v) + 58.7%Cbl Thermal Power - High, Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Simulated s 113.5% of RATED THERMAL Thetmal Power - High, Clamp POI/I/ER 2.2.1.6 3.3.1.1 Average Power Range Monitor, Neutron Flux -s 118% of RATED THERMAL High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High s 1087 psig 2.2.1.8 3.3.1.1 Reactor Vessel Water Level - Low, Level 3 ~ 13.0 inches<2 >
2.2.1.9 3.3.1.1 Main Steam Isolation Valve - Closure s 10"/4 closed 2.2.1.10 This Section Not Used 2.2.1.11 3.3.1.1 Drywell Pressure - High :s: 1.72 pslg 2.2.1.12 3.3.1.1 Scram Discharge Volume Water Level - s 65 gallons
- High - Level Transmitter 2.2.1.13 3.3.1.1 Scram Discharge Volume Water Level - s 61 gallons High - Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve - Closure s 5.5% closed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip ~500 psig Oil Pressure - Low
(a) See Figure 2.2-1 Cbl For Single loop operation, the value of 11W = 8.7
SUSQUEHANNA - UNIT 1 TRM /2.0-6 Instrument Trip Setpoint Program Rev. 11.2.2
TABLE 2.2-1 (Page 2 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE TRIP SETPOINT LCO [fRO] TRIP FUNCTION
2.2.1.16 OPRM Instrumentation
2.2.1..16.1 3.3.1.1 Sp PBA Amplttude Trip See COLR - TRO 3.2 2.2.1.162 3.3.1.1 Np PBA Successive Confinnat1on Count Trip See COLR - iRO 32 2.2.116.3 [3.3.9] TOL (E) Pencxi Tolerance 0.10 sec 2.2.1.16.4 [3.3.9] fc Conditioning Filter Cutoff Frequency 1.50 Hz 2.2.1.16.5 [3.3.9] Tmi OSCIilation Period Lower Time Limit 1.00 sec 2.2.1.16.6 [3.3.9] Tmax Oscillation Period Upper llme Limit 3.50 sec 2.2.1.16.7 [3.3.9] LPRMmin Minimum LRPMs/Cell Required for 2 Cell Operability 2.2.1.1.6.8 [3.3.9] 81 Peak Threshold Setpoint/ABA & GRBA 1.20 2.2.1.16.9 [3.3.9] S2 Valley Threshold. Setpoint/ABA & GRBA 0.85 2.2.1.16.10 [3.3.9] Smax Amplitude Tnp Setpolnt/ABA 1.50 2.21.16.11 [3 3.9] DR3 Growth Rate Factor Setpolnt/GRBA 1.60
2.2.2 Isolation ActuatJon Instrumentation
2.2.2.1 Primary Containment Isolation
2.22.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3 ~ 13.0 inches(aJ 2.2.21 2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2 ~ -38.0 ihches(aJ 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low, ~ -129 lnches(QJ Level 1 2.2.2.1.4 3.3.6.1 Drywell Pressure - High ;.::; 1.72 psig 2.2.2.1.5 3.3.6.1 SGTS Exhaust Radiation - High :,; 23.0 mR/hr 2.2.2.1.6 [3.3.6] Main Steam Line Radiation - High High ;.::; 15 x full power background without hydrogen injection
(a) See Figure 2.2-1
SUSQUEHANNA - UNIT 1 TRM / 2.0-7 Instrument Trip Setpoint Program Rev. 11 2.2
- TABLE 2.2-1 (Page 3 of 8)
INSTRUMENTATION SETPOI NTS
SYSTEM/REFERENCE LCO [fRO] TRIP !=UNCTION TRIP SETPOINT
2.2.2.2 Secondary Containment Isolation
2.2.2.2.1 3.3.6.2 Reactor Vessel Water Level - Low Low, ~ -38.0 lnches<e>
Level 2 2.2.22.2 3.3.6.2 Drywell Pressure - High s 1.n psig 2.2.2.2.3 3.3.6.2 Refuel Floor High Exhaust Duct Radiation - s 18 mR/hr High 2.2.2.2.4 3.3.6.2 Railroad Access Shaft Exhaust Duct Radiation - s 5 mR/hr High 2.2.2.2.5 3.3.6.2 Refuel Floor Wall Exhaust Duct Radiation - s 21 mR/hr High
2.2.2.3 Maih Steam Line Isolation
2.2.2.3.1 3.3.6.1 Reactor Vessel Water Level - Low Low Low, ~ -129 inches(aJ Level 1 2.2.2.3.2 3 3.6.1 Main Steam Line Pressure - Low ~ 861 pslg 2.2.2.3.3 3.3.6.1 Main Steam Line Flow - High s 173 psld 2.2.2.3.4 3.3.6.1 Condenser Vacuum - Low ~ 9.0 inches Hg vacuum 2.2.2.3.5 3.3 6.1 Reactor Building Main Steam Line Tunnel s 177°F
~* Tempen:rture-High 2.2.2.3.6 This Section Not Used 2.2.2.3.7 This Section is not used.
2.2.2.3.8 [3.3.6] Turbine Building Main Steam Tunnel s 197°F Temperature - High
2.2.2.4 Reactor Water Cleanup System Isolation
2.2.2.4.1 3.3.61 Reactor Vessel Water Level - Low Low, ~ -38 inches(a)
Level2 2.2.2.4.2 3.3:6.1 RWCU I),. Flow - High s 59 gpm 2.2.2.4.3 3.3.6.1 RWOU Flow - High s462 gpm 2.2.2.4.4 3.3.6.1 RWCU Penetration Area Temperature - High s 131°F 2.2.2.4.5 This Sectlon is not used.
2.2.2.4.6 3.3.6.1 RWCU Pump Area Temperature - High s 147°F 2.2.2.4.7 ThisSection Is not used.
2.2.2.4..8 3.3.6.1 RWCU Heat Exchanger Area Temperature - :::; 147°F High 2.2.2.4.9 This Section is not used.
(a) See Figure 2.2-1
SUSQUEHANNA - UNIT 1 TRM / 2.0-8 Instrument Trip Setpoint Program Rev. 11 2.2
TABLE 2.2-1 (Page 4 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TRO] IBIP FUNCTION TRIP SETPOINT
2.2.2.5 Reactor Core Isolation Cooling System Isolation
2.2.2.5.1 3.3.6.1 RCIC Steam Line!!.. Pressure - High :S 188 inches H:zO 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Line Pressure - Low ;:,; 60 pslg 2.2.2.5.3 3.3.6.1 ~CIC Turoine Exhaust Diaphragm Pressure - :S 10.0 pslg High 2 2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High :S 167°F 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature - High :S 167°F 2.2.2 5.6 3.3.6.1 RCIC Emergency Area Cooler Temperature - :S 167°F High 2.2.2.5.7 3.3.6.1 Drywell Pressure - High :S 1.72 psIg 2.2.2.5.8 This section Is not used.
2.2.2.5.9 This section Is not used.
2.2.2.6 High Pressure Coolant Injection System Isolation
2.2.2.6.1 3.3.6.1 HPCI Steam Line!!.. Pressure - High :S 370 inches HzO 2.2.2.6.2 3.3.6.1 HPCI Steam Supply Line Pressure - Low ;:,; 104 psig 2.2.2.6.3 3.3.6.1 HPCI Turbine Exhaust Diaphragm Pressure - :S 10 pslg High
High 2.2.2.6.6 3.3.6.1 HPCI Pipe Routing Area Temperature - High :S 167°F 2.226.7 3.3.6.1 Drywall Pressure - High :S 1.72 pslg 2.2.2.6.8 This section is not used.
2.2.2.6.9 This section is not used.
2.2.2.7 Shutdown Cooling/System Isolation
2.2.2.7.1 3.3.6.1 Reactor Vessel Water Level - Low, Level 3 ;:,; 13.0 inches(e) 2.2.2.7.2 3.3.6.1 Reactor Vessel Stealil Dome Pressure - High :S 98 psig 2.2.2.7.3 [3.3.6] RHR Flow - High :S 25,000 gpm
- 2.2.3 ECCS Actuation
2.2.3.1 Core Spray System
2.2.3.1.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, ;:,; -129 inches(a)
Level 1 2.2.3.1.2 3.3.5.1 Drywall Pressure - High :S 1.72 pslg 2.2.3.1.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low ;:,; 396.5, :S 428.5 pslg injection permissive
(a) See Figure 2.2-1
SUSQUEHANNA - UNIT 1 TRM / 2.0-9 Instrument Trip Setpoint Program Rev. 11 2.2
TABLE 2.2-1 (Page 5 of 8)
- INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [fRO] TRIP FUNCTION TRIP SETPOINT
2.2.32 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, :e: -129 lnches(a)
Level 1 2 2.3.2.2 3.3.5.1 Drywall Pressure - High s 1.72 psig 2.2.32.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low, ~ 396.5, s 428.5 psig Injection permissive 2.2.32.4 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low, ~ 236 pslg, decreasing Recirculation Discharge Valve permissive
2.2.3.3 HPCISystem 22.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low, ~ -38 inches(a)
Level2 2.2.3.3.2 3.3.5.1 Drywall Pressure - High s 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low :e: 40.5 Inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level - High, Level 8 s54 lnchas
2.2.3.4 Automatic Depressurlzatlon System (ADS) 2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, z -129 inches Level 1
- 2.2.3.4.2 3.3.5.1 Drywall Pressure - High s 1.72 psig 22.3.4.3 3.3.5.1 ADS Timer s 1 02 seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High ~ 135, s 155 pslg 2.2 3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump ~ 121, s 129 pslg Discharge Pressure - High 2.2.3.4.6 3.3 5.1 Reactor Vessel Water Level - Low, Level 3 z 13 lnches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer s 420 seconds
2.2.3.5 Loss of Power - ECCS Actuation
2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)
2.2.3.5.1.1 3.3.8.1 Bus Undervoltage ~ 823.2, s 856.8 Volts 2.2.3 5.1.2 3.3.8.1 Time delay :e: 0.4, s 0.6 seconds
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-10 Instrument Trip Setpoint Program Rev. 11 2.2
TABLE 2.2-1 (Page 6 of 8)
- INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [fRO] TRIP FUNCTION TRIP SETPOINT
2.2.3.5.2 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)
2.2.3.5.2.1 3.3.8.1 Bus Undervoltage ~ 2641.1, s 2748.9 Volts 2.2.3.5.2.2 3.3.8.1 11me delay ~ 2.7, s 3.3 seconds
2.2.3.5.3 4.16kV ESS Bus Undervoltage (Degraded Voltage,< 93%)
2.2.3.5.3.1 3.3.8.1 Bus Undervoltage ~ 3829.3, s 3906.7 Volts 2.2.3.5.3.2 3.3.8.1 11me Delay (Non-LOCA) ~ 4 minute, 30 seconds s 5 minute, 30 seconds 2.2.3.5.3.4 3.3.8.1 Time Delay (LOCA) 2 9, s 11 seconds
2.2.3.5.4 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)
2 2.3.5.4.1 [3.8.5] 480V Basis ~ 308.9, s 315.1 Volts 2.2.3 5.4.2 [3.8.5] 11me Delay 2 4.5, s 5.5 seconds
2.2.3.5.5 480V ESS Bus 08565 Undervoltage (Degraded Voltage, < 92%)
2.2.3.5.5.1 [3.8.5] 480V Basis ~ 437.6, s 446.4 Volts
- 2.2.3.5.5 2 [3.8.5] llme Delay 2 9, s 11 seconds
2.2.4 ATWS Alternate Rod Injection and Recirculation Pump Trip
2.2.4.1 3.3.4.2/{3.1.1] Reactor Vessel, Water Level - Low Low, 2 -38 inches(a)
Level 2 2.2.4.1 3.3.4.2/[3.1.1] Reactor Vessel Steam Dome Pressure - High s 1135 psig
2.2.5 End of Cycle Rearculation Pump Trip
2 2.5.1 3.3.4.1 Turbine stop Valve-Closure s 5.5% closed 2.2.5.2 3.3.4.1 Turbine Control Valve - Fast Closure ~ 500 psig
2.2.6 Reactor Core Isolation Cooling System Actuation
2.2.6.1 3.3.5 2 Reactor Vessel Water Level - Low Low, ~ -38 inches{a)
Level 2 2.2.6.2 3.3.5.2 Reactor Vessel Water Level - High, Level 8 s 54 inches{a) 2.2 6.3 3.3.5.2 Condensate Storage Tank Level-Low ~ 36.0 inches above tank bottom
(al See Figure 2.2-1
SUSQUEHANNA - UNIT 1 TRM / 2.0-11 Instrument Trip Setpoint Program Rev. 11 2.2
TABLE 2.2-1 (Page 7 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [fRO] TRIP FUNCTION TRIP SETPOINT
2.2.7 Control Rod Block
2.2.7.1 Rcx:I Block Monitor
2.2.7.1.1 3.3.2 Low Power Range - Upscale See COLR TRO 3.2 3.3.2 Intermediate Power Range - Upscale See COLR TRO 3.2 3.3.2 High Power Range - Upscale See COLR TRO 3.2 2.2.7.1.2 3.3.2 Low Power Range Setpoint See COLR TRO 32 3.3.2 Intermediate Power Range Setpoint See COLR TRO 3.2 3.3.2 High Power Range Setpolnt See COLR TRO 32
2.2.7.2 APRM
2.2.7.2.1 [3.1.3] Slmi.Jlated Thermal Power-High - Two Loop 0.55W + 54.2%
Operation 22.7.2.2 [3.1.31 Simulated Thermal Power-High - Single Loop 0.55 (:N-b.W) + 54.2% (cl Operation
0 [3.1.3] Simulated Thermal Power-High - Clamp s 108% of RATI:D THERMAL 2.2.7.2.3
,
- POWER 2.2.72.4 [3.1.3] Downscale ~ 5% of RATED THERMAL POWER 2.2.72.5 [3.1.3] Neutron Flux - High (Setdown) s 12% of RATI:D THERMAL POWER
2.2.7.3 Source Range Monitors
2.2.7.3.1 [3.1.3] Upscale s2E5 cps 2.2.7 3.2 [3.1.3] Downscale ~ 3.0 cps(bl
2.2.7.4 Intermediate Range Monitors
2.2.7.4.1 [3.1.3] Upscale s 108/125 divisions of full scale 2.2.7.4 2 [3.1.3] Downscale ~ 5/125 divisions offull scale
2.2.7.5 Scram Discharge Volume
2.2.7.5.1 [3.1.3] Water Level - High s 35.9 gallons
2.2.7.6 Reactor Coolant System Recirculation Flow
2.2.7.6.1 [3.1.3] Upscale 114%
(bl Wrth a signal-to-noise ratio ~ 2, or within the limits of Figure 2.2-2.
(c) For single loop operation, the value of ll.W = 8..7
SUSQUEHANNA - UNIT 1 TRM / 2.0-12 Instrument Trip Setpoint Program Rev. 1.1 2.2
TABLE 2.2-1 (Page 8 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SErPOINT
2.2.8 CREOASS
2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake ~5 mR/hr Radiation Monitor 2.2.8.1.1 3.3.7.1 ReactorVessel Water Level - Low Low, 2 -38.0 lnches<0 >
Level 2 2.2.8.1.2 3.3.7.1 Drywall Pressure - High ~ 1.72 pslg 2.2.8.1.3 3.3.7..1 Refuel Floor High Exhaust Duct ~ 18 mR/hr Radiation - High 2.2.8.1.4 3.3.7.1 Rallroad Access Shaft Exhaust Duct Radiation ~ 5 mR/hr
-High 2.2.8.1.5 3.3.7.1 Refuel Floor Wall Exhaust Duct ~ 21 mR/hr Radiation - High
2.2.9 Feedwater/Maln Turbine Trip System Actuation
2.2.9.1 3.3.2.2 Reactor Vassal Laval - High ~ 54.0 lnchas< 8 l
22.10 MVP Isolation
2.2.10.1 [3.3.11] Main Steam Line Radiation - High High ~ 15 x full power background without hydrogen injaci:lon
(al See Figl!re 2.2-1
SUSQUEHANNA - UNIT 1 TRM /2.0-13 Instrument Trip Setpoint Program Rev. 11 2.2
WATER LEVEL IOENCLATlRE Nil VESSEL ZERO READING 1£IlifT ABOVE
<IN.)
(8) :591, :s +54 (7) ~:s +39 (4) ~.:s +30 (3) ~:s +13 (2) 489. 5 -38
( 1) 398. 5 -129
BOTTOM ClF STEAM DRYER SKIRT
FEED 498. ~-~,
WATER
-129
1:50 a>>f'TRIBUTE TD ADS CLOSE MSIY' S
e50
OUTLET 1:50 RECIRC 161, ~---1
ttJZZLE
100
- 50 NDTE* SCALE IN INCHES ABOVE VESSEL ZERD
REACTOR VESSEL WATER LEVEL FIGURE 2. 2-1
SUSQUEHANNA - UNIT 1 TRM / 2.0-14 lnstrumer,t Trip Setpoint Program Rev. 11 2.2
Instrument Trip Setpoint Table 2.2
3 2.8 2.6 2.4 2.2 \\
2 \\
..--.. 1.8 (/) \\
0.. \\
(.)
'-' 1.6 w
~ 1.4 \\ \\ Acceptable
~ ~ "
- ) 1.2 '
0 I'-- -- --- --- -
(.) 1
- :::i!:
0:::, 0.8
(/)
0.6 Not Acceptable 0.4
0.2 0
2 6 10 14 18 22 26 30
Signal-to-Noise Ratio
Figure 2.2-2 Minimum SRM Trip Setpoint Versus Signal~to-Noise Ratio SUSQUEHANNA - UNIT 1 TRM / 2.0-15