PLA-2466, Monthly Operating Repts for Apr 1985
| ML20132D846 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/30/1985 |
| From: | Kenyon B, Kuczynski L PENNSYLVANIA POWER & LIGHT CO. |
| To: | Beebe M NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| PLA-2466, NUDOCS 8507170547 | |
| Download: ML20132D846 (9) | |
Text
. . - _ . __ _ _ . - . _ . . .
l l
- UNIT 1
-SUSQUEHANNA STEAM ELECTEIC STATION Docket No. 50-387 Date May 2, 1985 Completed by L.A. Kuczynski Telephone (717)S42-3759
'a Challenges to Main Steam Safety Relief Valves.
None.
l Changes to the Of f site Dose Calculation Manual .
None.
Major Changes to Radioactive Waste Treatment Systems.
None.
t l
[
t i-i l
l s hM$
R 7
PDR-I .TE'Z4 1//
_ _ _ _ - _ _ _ _ _ _ _ = _ _
Y&@ + ,
AVERAGE DAILY UNIT POWER LEVEL N0i 0 ?
Cf) W E DOCKET NO. 50-388 k? ' 4 UNIT Two Ip g DATE May 2, 1985 Kuczynski R[C $Y COMPLETED BY t..A.
TELEPHONE (717)S42-3759 Apri1. 1985 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1045 37 1054 2 1056 gg 1048 3 1054 g, 1040 _
4 1052 20 1042 5 1047 21 1039 6 1051 1038 22 7 1053 23 1041 _
s 1057 24 1052 9 1058 1045 25 10 1057 26 571 1, 1055 0 27 12 1053 0 28 13 1052 0 29 14 1049 30 0 15 1048 3g 16 1047 l
INSTRUCTIONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole negawatt.
l 1
(9/77) l
N g U-[ [ g7 .
m _ . ----. _ _ 3 -
tV. ^2r* J OPERATING DATA REPORT C DOCKET NO. 50-388 T 4 DATE May 2. 1985 klC 6N COMPLETED ElY L.A. Kuc7ynski TELEPilONE (717)S42-3759 OPERATING STATUS Unit 2 b
- 1. Unit Name: Susauchanna Steam Electric Staticn
- 2. Reporting Period: Apri1. 1985 3,293
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 1.152
- 5. Design Electrical Rating (Net MWe): 1.065
- 6. Maximum Dependable Capacity (Gross MWe):
1,068
- 7. Maximum Dependable Capacity (Net MWe): 1.032
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
None
- 9. Power Letel To Which Restricted. If Any (Net MWe): None
- 10. Reasons For Restrictions,if Any: None This Month Yr..to.Date Cumulatise
- 11. Hours In Reporting Period 743 1.895 1.895
- 12. Number Of Hours Reactor Was Critical 619 1,688.9 1,688 9
- 13. Reactor Reserve Shutdown Hours 124 206.1 206.1
- 14. Hours Generator On-Line 617 1,665.I 1,665.I
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWil) 2.012.910 5.312.155 5.312.155
- 17. Gross Electrical Energy Generated (MWH) 665.488 1.752.902 1.752.902
- 18. Net Electrical Energy Generated (MWH) 641,651 1,690,998 1,690,998
- 19. Unit Service Factor 83 87.9 87.9
. 20. Unit Availability Factor 83 87.9 87.9
- 21. Unit Capacity Factor (Using MDC Net) 83.7 86.5 86.5
- 22. Unit Capacity Factor (Using DER Net) 81.1 83.8 83.8 1
- 23. Unit Forced Outage Rate 17 12.I 12.I j
- 24. Shutdowns Scheduled Oser Next 6 Months (Typ'e.Date.and Duration of Eacht:
None l 1
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Mw 3 - 1905 l
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed i
INITIA L CRITICA LITY l INITIAL ELECTRICITY ___
l 1
COMM ERCI A L OPER ATION l
1 iu/77i
i
! *pANN4 l s D.
s I
> h.k.k !
>y .
~
1 l -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 g R UNIT N AME Two e M DATE May 2. 1985 *
- 4fC 5 COMPLETED BY L.A. Kuczynski REPORT MONTH AnriI . 1988; TELEPHONE (717)S42-3759 i
3 _
=_ ee 3 .o : 5
., 2e 5 7 54 Licensee E.e,, gvb Cause & Corrective .
. No . Date g 3g :; jg5 Event u7 E '" Action to
" $5 5 j5y Report a <E 0 Prevent Recurrence .
1 I
5 8 850426 F 126 A 2 N/A HA GENERA Controlled Unit' shutdown completed to permit repair of the generator stator cooling water leak.
NOTE: An LER will not :e submi :ted i or Unit shutdown h6. Occur ence subs yquently determined not reportable.
I 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Ucensee C. Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)
EOperator Training & Ucense Examination from previous month F-Administratise 5-Reduction 5 G-Operational Error iExplain) Exhibit I - Same Source 19/77) llother (E xplain) 9-Other
UNIT 2 SUSQUEHANNA STEAM ELECTRIC STATION
^
Docket No. 50-388 Date May 2, 1985 Completed by L. A. Kuczynski Telephone (717)S42-3759 l
Challenges to Main Steam Safety Relief Valves.
! None.
i i
Changes to the Offsite Dose Calculation Manual.
None, Major Changes to Radioactive Waste Treatment Systems.
l None.
I l
$ WNA 4 ,
AVERAGE DAILY UNIT POWER LEVEL i . l lD7 D \ l \ E (f) M g DOCKET NO. 50-387 L .* " %J UNIT One
<p s0 DATE May 2, 198s 074gc 3 COMPLETED BY L.A. Kuczynski TELEPHONE (717)S47-3759 g April, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1 0 g7 0 2 0 gg 0 3 0 g, 0 _
4 0 0 20 5
0 0 23 0 0 6 y 0 0 7 D -
8 0 0 24 9 0 0 3
10 0 0 26 11 0 0 27 12 0 0 3
13 0 0 29 14 0 0 30 15 0 3g 16 0 INSTRUCTIONS On this format list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.
(9/77)
'. ghNN4 ye &m: #
'y !
W 7 h_ _ 3 LN- CF' J OPERATING DATA REPORT DOCKET NO. 50-387 4 ,gO DATE May 2. 1985 OpNIC sip COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-3759 OPERATING STATUS Unit 1 b"I'5
- 1. Unit Name: Suscuehanna Steam Electric Station
- 2. Reporting Period: Aor11. 1995
- 3. Licensed Thermal Power (MWt): 3.293
- 4. Nameplate Rating (Gross MWe): 1.152
- 5. Design Electrical Rating (Net MWe): 1.065
- 6. Maxirnum Dependable Capacity (Gross MWe): 1.068
- 7. Maximum Dependable Capacity (Net MWe): 1.032
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
None
- 9. Power Level To which Restricted. If Any (Net MWe): None
- 10. Reasons For Restrictions.If Any: None This Month Yr..to.Date Cumulatise i1. Hours in Reporting Period 7t 3 2.903 16,656
- 12. Number Of Hours Reactor Was Critical 0 896 11,288.7
- 13. Reactor Reserve Shutdownllours 0 41.8 513 2
- 14. Hours Generator On.Line 0 883 9 11.030.8
- 15. Unit Reserse Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWil) 0 2.529.541 33.158.531
- 17. Gross Electrical Energy Generated (MWil) 0 823,150 10,813,680
- 18. Net Electrical Energy Generated (MWil) -5.017 769,123 10.349,693
- 19. Unit Service Factor 0 30.4 66.2
- 20. Unit Asailability Factor 0 30.4 66.2
- 21. Unit Capacity Factor (Using MDC Net) 0 25.7 60.2
- 22. Unit Capacity Factor (Using DER Net) 0 24.9 58.4
- 23. Unit Forced Outage Rate 0 5.8 13.4
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each t:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: June 19. 1985.
- 26. Units In Test Status (Prior io Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY CO\t\lERCIAL OPER ATION to/77)
'#pANN4
- 3
,l 4)@
- g- -:-
'hb8)I .
(T '
Lh M UNIT SHUTDOWNS AND POWER REDUCTIONS . DOCKET NO. 50-387 -
g R UNIT NAME one
<p 0 DATE May 2. 1985
- 4fC Si COMPLE Y K z Ski REPORT MONTil Apri1. 1985
- E E
, 3g 3j{ jY5 Licensee E t, %
g, Cause & Corrective -
No. Date g 3g .g g 5 Event g? g3 ,
Action to H
$= 5 jg Report a mv gO Prevent Recurrence 6
2 850209 S 743 C 4 NA NA NA Manual Scram to commence first ref uel,ing outage.
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Mar.ual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation '0161)
E-Operator Training & License Examination from previous month F-Administrative S Goperational Error (Explain) 5-Reduction Exhibit I - Same Source (9/77) II-Other (Explain) 9-Other
4 P
_.;. ^*,, -
- 4. ,
Q Pennsylvania Power & Light Company
' Two North Ninth Street
- Allentown, PA 18101
- 215 / 770L5151 9
Bruce D. Kenyon
' Vice President-Nuclear Operations 215/770-7502 l MAY 7 1985 Director Data Automation &
4 Management Inforntion Division i Attention: Mr. M. R. Beebe l Management Information Branch
! Office of Resource Management j - U.S. Nuclear Regulatory Commission l Washington, D.C. 20555 i
i SUSQUEHANNA STEAM ELECTRIC STATION ,
MONTHLY OPERATING REPORTS I
ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2466 50-388/NPF-22
Dear Mr. Beebe:
- The April 1985 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
1 Very trul yours, -'
i B. D.~Kenyo Vice Preside -Nuclear Operations i
Attachment ec: Dr. Thomas E. Murley Regional Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 i Director
! Office of Inspection and Enforcement
- . U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn
- Document Control Desk (12 copies)
~
Mr. R. H..Jacobs -NRC Ms. M.-J. Campagnone - NRC
[
s
{
r~ . - . _ . - , .
.,,rg,.,.-3. . , , , . .,%,..,y- y ,.xymr---- ,,%. - - , y e r m e m,',-.,.n.,,.,,ry,...m. -mm-o w vw.y . .s r y. -,p -y.,
, , - . . ,, ~ . - , -y,~,9--,.- ,,,e