PLA-2466, Monthly Operating Repts for Apr 1985
| ML20132D846 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/30/1985 |
| From: | Kenyon B, Kuczynski L PENNSYLVANIA POWER & LIGHT CO. |
| To: | Beebe M NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| PLA-2466, NUDOCS 8507170547 | |
| Download: ML20132D846 (9) | |
Text
.. - _. __
l l
UNIT 1
-SUSQUEHANNA STEAM ELECTEIC STATION Docket No.
50-387 Date May 2, 1985 Completed by L.A. Kuczynski Telephone (717)S42-3759 Challenges to Main Steam Safety Relief Valves.
'a None.
l Changes to the Of f site Dose Calculation Manual.
None.
Major Changes to Radioactive Waste Treatment Systems.
None.
t l
[
t i-i l
l s
hM$
7 R
PDR-I
.TE'Z4 1//
=
Y&@
AVERAGE DAILY UNIT POWER LEVEL
+
N0i
?
0 E
DOCKET NO.
50-388 Cf)
W k?
4 UNIT Two I
DATE May 2, 1985 p
g R[C $Y COMPLETED BY t..A.
Kuczynski TELEPHONE (717)S42-3759 Apri1. 1985 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 1045 1054 37 2
1056 1048 gg 3
1054 1040 g,
4 1052 20 1042 5
1047 1039 21 1051 6
22 1038 7
1053 1041 23 s
1057 1052 24 9
1058 1045 25 10 1057 571 26 1,
1055 0
27 1053 0
12 28 13 1052 0
29 14 1049 0
30 15 1048 3g 16 1047 INSTRUCTIONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole negawatt.
l 1
(9/77)
N g
U-[ [ g.
7 m
3 tV.
^2r* J OPERATING DATA REPORT C
DOCKET NO. 50-388 4
DATE May 2.
1985 T klC 6N COMPLETED ElY L.A.
Kuc7ynski TELEPilONE (717)S42-3759 OPERATING STATUS Unit 2 b
- 1. Unit Name:
Susauchanna Steam Electric Staticn
- 2. Reporting Period:
Apri1. 1985
- 3. Licensed Thermal Power (MWt):
3,293
- 4. Nameplate Rating (Gross MWe):
1.152
- 5. Design Electrical Rating (Net MWe): 1.065
- 6. Maximum Dependable Capacity (Gross MWe):
1,068
- 7. Maximum Dependable Capacity (Net MWe):
1.032
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Letel To Which Restricted. If Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
This Month Yr..to.Date Cumulatise
- 11. Hours In Reporting Period 743 1.895 1.895
- 12. Number Of Hours Reactor Was Critical 619 1,688.9 1,688 9
- 13. Reactor Reserve Shutdown Hours 124 206.1 206.1
- 14. Hours Generator On-Line 617 1,665.I 1,665.I
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWil) 2.012.910 5.312.155 5.312.155
- 17. Gross Electrical Energy Generated (MWH) 665.488 1.752.902 1.752.902
- 18. Net Electrical Energy Generated (MWH) 641,651 1,690,998 1,690,998
- 19. Unit Service Factor 83 87.9 87.9
- 20. Unit Availability Factor 83 87.9 87.9
- 21. Unit Capacity Factor (Using MDC Net) 83.7 86.5 86.5
- 22. Unit Capacity Factor (Using DER Net) 81.1 83.8 83.8
- 23. Unit Forced Outage Rate 17 12.I 12.I j
- 24. Shutdowns Scheduled Oser Next 6 Months (Typ'e.Date.and Duration of Eacht:
None 1
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Mw 3 - 1905
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed i
INITIA L CRITICA LITY INITIAL ELECTRICITY 1
COMM ERCI A L OPER ATION iu/77i
i
- pANN4 D.
l s
h.k.k I
>y s
1 $
~
l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 g
R UNIT N AME Two e
M DATE May 2.
1985 COMPLETED BY L.A.
Kuczynski
- 4fC 5 REPORT MONTH AnriI. 1988; TELEPHONE (717)S42-3759 i
3
=_
ee 3.o :
5 54 Licensee E.e,,
gvb Cause & Corrective 2e 5
7
. No.
Date g
3g jg5 Event u7 E '"
Action to
$5 5
j5y Report a
<E 0 Prevent Recurrence 1
5 I
8 850426 F
126 A
2 N/A HA GENERA Controlled Unit' shutdown completed to permit repair of the generator stator cooling water leak.
NOTE:
An LER will not
- e submi :ted i or Unit shutdown h6.
Occur ence subs yquently determined not reportable.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Ucensee C. Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)
EOperator Training & Ucense Examination from previous month F-Administratise 5
5-Reduction G-Operational Error iExplain)
Exhibit I - Same Source 19/77) llother (E xplain) 9-Other
UNIT 2 SUSQUEHANNA STEAM ELECTRIC STATION
^
Docket No.
50-388 Date May 2, 1985 Completed by L. A. Kuczynski l
Telephone (717)S42-3759 Challenges to Main Steam Safety Relief Valves.
None.
i i
Changes to the Offsite Dose Calculation Manual.
- None, Major Changes to Radioactive Waste Treatment Systems.
l None.
I l
WNA 4
AVERAGE DAILY UNIT POWER LEVEL l lD i.
7 D
\\
l
\\
E (f)
M g
DOCKET NO. 50-387 L.*
" %J UNIT One
<p 0
DATE May 2, 198s s
074gc 3 COMPLETED BY L.A. Kuczynski TELEPHONE (717)S47-3759 g
April, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 1 0
0 g7 2
0 0
gg 3
0 g,
0 4
0 20 0
0 5
23 0
0 6
y 0
7 0
0 D
8 0
0 24 9
0 3
0 10 0
26 0
11 0
0 27 12 0
0 3
13 0
0 29 14 0
0 30 15 0
3g 16 0
INSTRUCTIONS On this format list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.
(9/77)
ghNN4
&m:
e
'y yW 7 h_ _
3 LN-CF' J OPERATING DATA REPORT O
DOCKET NO. 50-387 4
,g DATE May 2.
1985 OpNIC sip COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-3759 OPERATING STATUS Unit 1 b"I'5
- 1. Unit Name: Suscuehanna Steam Electric Station
- 2. Reporting Period:
Aor11. 1995
- 3. Licensed Thermal Power (MWt):
3.293
- 4. Nameplate Rating (Gross MWe):
1.152
- 5. Design Electrical Rating (Net MWe): 1.065 1.068
- 6. Maxirnum Dependable Capacity (Gross MWe):
1.032
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
None
- 9. Power Level To which Restricted. If Any (Net MWe): None
- 10. Reasons For Restrictions.If Any:
None This Month Yr..to.Date Cumulatise i1. Hours in Reporting Period 7t 3 2.903 16,656
- 12. Number Of Hours Reactor Was Critical 0
896 11,288.7
- 13. Reactor Reserve Shutdownllours 0
41.8 513 2
- 14. Hours Generator On.Line 0
883 9 11.030.8
- 15. Unit Reserse Shutdown Hours 0
0 0
0 2.529.541 33.158.531
- 16. Gross Thermal Energy Generated (MWil) 0 823,150 10,813,680
- 17. Gross Electrical Energy Generated (MWil)
- 18. Net Electrical Energy Generated (MWil)
-5.017 769,123 10.349,693
- 19. Unit Service Factor 0
30.4 66.2
- 20. Unit Asailability Factor 0
30.4 66.2 0
25.7 60.2
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 0 24.9 58.4
- 23. Unit Forced Outage Rate 0
5.8 13.4
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each t:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
June 19. 1985.
- 26. Units In Test Status (Prior io Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY CO\\t\\lERCIAL OPER ATION to/77)
'#pANN4 4)@
3
'hb8)I (T g-
,l UNIT SHUTDOWNS AND POWER REDUCTIONS
. DOCKET NO.
50-387 Lh M
R UNIT NAME one g
0 DATE May 2.
1985
<p COMPLE Y
K z Ski
- 4fC Si REPORT MONTil Apri1. 1985 E
E 3g 3
jY5 Licensee E t, g,
Cause & Corrective No.
Date g
3g j{
.g g 5 Event g?
g3 Action to gO Prevent Recurrence
$=
5 jg Report a mv H
6 2
850209 S
743 C
4 NA NA NA Manual Scram to commence first ref uel,ing outage.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Mar.ual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation
'0161)
E-Operator Training & License Examination from previous month F-Administrative 5-Reduction S
Goperational Error (Explain)
Exhibit I - Same Source (9/77)
II-Other (Explain) 9-Other
P 4
^ *,,
4.
Q Pennsylvania Power & Light Company
' Two North Ninth Street
- Allentown, PA 18101
- 215 / 770L5151 9
Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 l
MAY 7 1985 Director Data Automation &
Management Inforntion Division 4
i Attention:
Mr. M. R. Beebe l
Management Information Branch Office of Resource Management j
- U.S. Nuclear Regulatory Commission l
Washington, D.C.
20555 i
i SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS I
ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2466 50-388/NPF-22
Dear Mr. Beebe:
The April 1985 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
1 Very trul yours, i
B. D.~Kenyo Vice Preside -Nuclear Operations i
Attachment ec:
Dr. Thomas E. Murley Regional Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 i
Director Office of Inspection and Enforcement
. U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn: Document Control Desk (12 copies)
~
Mr. R. H..Jacobs
-NRC Ms. M.-J.
Campagnone - NRC
[
{
s r~
.,,rg,.,.-3..,,,.
.,%,..,y-y
,.xymr----
,,%. - -, y e r m e m,',-.,.n.,,.,,ry,...m.
-mm-o w vw.y..s r y.
-,p
-y.,
~. -,
-y,~,9--,.-
,,,e
.