ML20204J237

From kanterella
Revision as of 03:17, 7 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search

Forwards Radiological Assessment Branch SER Re Tech Spec Change to Facilitate Hydrogen Addition.Changes Should Be Approved
ML20204J237
Person / Time
Site: Pilgrim, 05000000
Issue date: 03/13/1985
From: Johnston W
Office of Nuclear Reactor Regulation
To: Lainas G
Office of Nuclear Reactor Regulation
Shared Package
ML20204E974 List:
References
FOIA-86-58 TAC-56820, NUDOCS 8503250298
Download: ML20204J237 (2)


Text

4 -

5[<Y"%[9 y

4 g

UNITED STATES NUCLEAR REGULATORY COMMISSION

/j/fl' p yjc d-J 5 j WASHINGTON. D. C. 20555

% /

MAR 131985 Docket No. 50-293 MEMORANDUM FOR: Gus C. Lainas, Assistant Director for Operating Reactors Division of Licensing FROM: William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering

SUBJECT:

SAFETY EVALUATION FOR TECHNICAL SPECIFICATION CHANGE TO FACILITATE HYDR 0 GEN ADDITION - PILGRIM hUCLEAR POWER STATION (TAC #56820)

Plant Name: Pilgrim Nuclear Power Station, Unit 1 Suppliers: General Electric Company; Boston Edison Company Licensing Stage: OR Docket No.: 50-293 Responsible Branch & Project Manager: ORB #2; P. Leech CMEB Reviewer: F. J. Witt Description of Task: Technical Specification Change to Facilitate Hydrogen Addition Status: Safety Evaluation Complete By letters dated February 1 and 15, 1985, the licensee requested a temporary Tech Spec change to the main steam line high radiation trip level set point.

The purpose of the requested Tech Spec change is to conduct an operational test of hydrogen additive reactor water chemistry.

The Radiological Assessment Branch (RAB) has reviewed the request for Technical Specification changes. Attached is the evaluation and SALP prepared by RAB.

We recommend that the proposed technical specification changes be approved.

Q/ A {,br Y (wL William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering

Attachment:

As stated

Contact:

F. Witt x28360 cc: See next page p2p

. ~850 325M W XA r. ,

. + ,

MAR 131995 Gus C. Lainas cc: J. Knight H. Thompson V. Benaroya C. McCracken D. Vassallo P. Leech T. Sulliven '

S. Pawlicki F. Witt F. Congel M. Lamastra

=

i

)