ML20237B777
| ML20237B777 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 08/12/1998 |
| From: | Dromerick A NRC (Affiliation Not Assigned) |
| To: | Cruse C BALTIMORE GAS & ELECTRIC CO. |
| References | |
| GL-97-05, GL-97-5, TAC-MA0452, TAC-MA0453, TAC-MA452, TAC-MA453, NUDOCS 9808190249 | |
| Download: ML20237B777 (3) | |
Text
. August 12, 1998 Mr. Chades H. Cruse Vice President - Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
EVALUATION OF BALTIMORE GAS AND ELECTRIC COMPANY RESPONSE TO NRC GENERIC LETTER 97-05 FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (TAC NOS. MA0452 AND MA0453)
Dear Mr. Cruse:
The NRC staff has completed its review of licensee responses to NRC Generic Letter (GL) 97-05, " Steam Generator Tube inspection Techniques." The focus of GL 97-05 was to verify that ,
licensee stear,i generator tube inspection practices were consistent with existing regulatory I requirements and plant licensing bases. Baltimore Gas and Electric Company submitted a response to this GL on March 16,1998, as supplemented on June 16,1998, that included a description and technical basis for allinspection techniques used to size the depth of steam generator tube degradation at Calvert Cliffs, Units 1 and 2. The staff's review of this response did not identify any concems with the steam generator tube inspection techniques employed at Calvert Cliffs that would indicate the licensee is not in compliance with the current licensing basis for this facility. Therefore, we have determined that this issue is closed for Calvert Cliffs Nuclear
}
Power Plant, . < iits 1 and 2.
1 Sincerely, I
Original Signed by:G.Vissing, Acting PM j Alexander W. Dromerick, Senior Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 ,
l cc: See next page O
DISTRIBUTION:
,D Dk PDl-1 R/F C. Hehl, Region I l
J. Zwolinski (A) g\
S. Bajwa G,i c~gr S. Little . ptT?O P - ! "' ^. , x ; EA E A. Dromerick LLIN b ! A " ~
l DOCUMENT NAME: G:\CC120452.CLO To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E"
= Copy with attachment / enclosure "N" = No copy a / l OFFICE PM:PDI-1 f,j E LA:PDI1O(/ l D:PD!kl # //, l l l [
NAME ADromerick:tect/[ Slittle F ' SBajde\ l#
DATE 08/ ls-/98 08/ll /98 08/tV/48 08/ /98 08/ /98 Official Record Copy
} 9808190249 980012 PDR ADOCK 05000317 P PDR a
, TAM 4 3 u UNITED STATES
/ y ; NUCLEAR REGULATORY COMMISSION
- WASHINGTON, D.C. 20666 4 31 8 August 12, 1998
+,*****,o Mr. Charles H. Cruse Vice President - Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
EVALUATION OF BALTIMORE GAS AND ELECTRIC COMPANY RESPONSE TO NRC GENERIC LETTER 97-05 FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 AND 2 (TAC NOS. MA0452 AND MA0453)
Dear Mr. Cruse:
The NRC staff has completed its review of licensee responses to NRC Generic Letter (GL) 97-05, " Steam Generator Tube inspection Techniques." The focus of GL 97-05 was to verify that licensee steam generator tube inspection practices were consistent with existing regulatory requirements and plant licensing bases. Baltimore '3as and Electric Company submitted a response to this GL on March 16,1998, as supplemented on June 16,1998, that lncluded a description and technical basis for all inspection techniques used to size the depth of steam generator tube degradation at Calvert Clifis, Units 1 and 2. The staffs review of this response did not identify any concems with the steam generator tube inspection techniques employed at Calvert Cliffs that would indicate the licensee is not in compliance with the current !icensing basis for this facility. Therefore, we have determined that this issue is closed for Calvert Cliffs Nuclear Power Plant, Units 1 and 2.
Sincerely, Alexander W. Dromeric , Senior Project Manager {
Project Directorate 1-1 j
Division of Reactor Projects - 1/11 i Office of Nuclear Reactor Regulation i Docket Nos. 50-317 l and 50-318 l cc: See next page l
l l
l t -
3..
Mr. Charles H. Cruse Baltimore Gas & Electric Company . Calvert Cliffs Nuclear Power Plant cc:
President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Commission of Commissioners Maryland 175 Main Street Engineering Division Prince Frederick, MD 20678 6 St. Paul Centre Baltimore, MD 21202-6806
- James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire Baltimore Gas and Electric Company Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 >
Baltimore, MD 21202-1631 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge Patricia T. Bimie, Esquire i
2300 N Street, NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Bruce S. Montgomery, Director Baltimore, MD 21218 NRM l Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donatell l 1650 Calvert Cliffs Parkway NRC Technical Training Center Lusby, MD 20657-4702 5700 Brainerd Road Chattanooga, TN 37411-4017 Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 287 l
St. Leonard, MD 20685 Mr. Richard I. McLean, Manager Nuclear Programs l
Power Plant Research Program Maryland Dept. of Natural Resources i Tawes State Office Building, B3 i Annapolis, MD 21401
, Regional Administrator, Region i L U.S. Nuclear Regulatory Commission 475 Allendale Road l King of Prussia, PA 19406 1
L l
l