. . CCHANCHE PEAK REVIEW TEM POPULATION DESCRIPTION ",
s
)
Page 1 of 1 POPULATION NAME:Small Bore Piping and Instrument Tubing / Piping Welds / Material PREPARED BY: /epost. N M DATE: June 19,'1985 RESPONSIBLE QA/QC SUPPORT ENGINEER REV: 0 SYSTEM, COMFONENTS, AED STRUCTURES:
The population includes:
For safety related systems identified on Attachment A:
Safety tubing / piping diameter 2 inches and smallerrelated site-made wel'ds with nomin Safety related weld material and material of items associated with the
Site-made velds, weld material, and associated material for abandoned pipe support integral attachments.
POPULATION BOUNDARY:
Welds in the population (Units 1, 2, and common to both Units) which t
- are installation complete and Quality Control (QC) accepted.
[
Welds in the population that are shown (numbered) on Brown and Root, Inc., piping isometrics which have been developed for safety related
- piping systems.
i SPECIFIC INTERFACES:
The population shall not include:
Welds for pipe support integral attachments to pressure retaining components.
Supports". These are included in the population for "Small Bore Pipe Safety related branch process connection site-made velds, veld material and associated material for 2 inch and smaller connections coming off 2
inch and larger pipe. These are included in the population for "Large Bore Pipe-Welds /Haterial".
Piping Configuration. This is included in the "Small Bore Piping Configuration" population.
8606230234 860609 '
- A PDR APPROVED BY: ,
f DATE: /, ,1(, -d QA/C LEAD DISCIPLINE ENGI APPROVED BY: /(( W //- erfCv7.# DATE: 6 ~~N~'M QA/QC REINSPECTION E+9=---Tuc (dM ~
SUPERVISOR - -
l L """""""
-n . . - . . . - = . ..-. - - --- .. , . . - ~ _ - - - _ _ . . - - - _ _ - -
l
. ~
l i . . . _ - . .. .. ..-.. ____. _ - .
, [ 'Page 1 of 2 ATTACHMENT A SAFETY RELATED PIPING SYSTDIS ISOMETRIC SYSTD4 _
DESIGNATION SYSTDi DESCRIPTION AF Auxiliary Feedvater BR Boron Racycle
- CA Compressed Air CC Component Cooling Water CR ,
Chilled Water CS Chemical and Volume Control CT Containment Spray DD Demin and Reactor M/U Wtr.
DO Diesel Gen. Fuel Oil
MS Main Stear PS Process Sampling RC Reactor Coolant, RH Residual Heat Removal RM Radiation Monitoring SF Spent Fuel Fool Cooling and Cleanup SI Safety Injection
- SW Station Service Water VA Basting and Ventilation System e
0004-S(0)06/25/85
, _ _ _ . _ . ... =. _.. .__._. . -- . . . _ . .-
, Page 2 of 2 ISOMETRIC SYSTEM DESIGNATION SYSTD4 DESCRIPTION
. I VD Ventg,and Drains
. WP Weste Processing. Liquid
- CI - Compressed Air Inst.
- LT Leak Test
..
- PN Penetration Pneumstic and Hydraulic Conn.
i r
d C- C 1
l
- These systems, although not specifically identified in the CPSES PSAR as safety related, are included because they are a part of a
Containment Isolation System as identified in the.CPSES PSAR.
d' . i 0004-s(0)o6/22/85