ML20154A835
| ML20154A835 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 09/25/1998 |
| From: | Cowgill C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Feigenbaum T, Harpster T NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| Shared Package | |
| ML20154A841 | List: |
| References | |
| 50-443-98-05, 50-443-98-5, NUDOCS 9810050020 | |
| Download: ML20154A835 (3) | |
See also: IR 05000443/1998005
Text
_ _. . . _ . . . . _ . . _ . _ . _ _ _ _ _ _ _ _ . _ _ _ . _ . ~ . . . . _ . . _
.
i'
L-
J
=:
.
L'
+
September 25,1998
.
,
Mr. T. C. Feigenbaum
Executive Vice President and Chief Nuclear Officer
' Seabrook Station
North Atlantic Energy Service Corporation
c/o Mr. Terry L. Harpster
P. O. Box 300:
Seabrook, NH 03874
SUBJECT: NRC INTEGRATED INSPECTION REPORT NO. 50-443/98-05
~ Dear Mr. Feigenbaum:
On August 22,1998, the NRC completed an inspection at Seabrook Station.' The enclosed
report presents the results of _that inspection.
4
The plant was operated safely during the period. Operators performed routine activities
- includireg the plant start-up and power ascension well. Maintenance technicians performed
s
. several activities well, and engineering provided good support of the spent fuel pool rack
, modification. The security program was inspected during this period. The NRC determined
that'you are implementing a security program that protects against acts of radiological
<
sabotage. Also, a radiation protection program inspection took place. Overall, the NRC !
i found the radiation' protection program was effectively implemented. q
i in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
,.
and its enclosures will be placed in the NRC Public Document Room. j
q Sincerely,
Original Signed By:
lI
l
Curtis J. Cowgill, Chief
Projects Branch 5
?' Division of Reactor Projects
Docket No. 50-443
p License No: NPF-86
.
Enclosure: 1. NRC Inspection Report No. 50-443/98-05
i-
f-
~
l 9810050020 980925
PDR ADOCK 05000443
"
.i
f ,0l
G pm i
1
a
,- e.
. . . _ _ _ _ _ _ . _ . . . . . _ . _ . . . . _ _ . . . _ _ _ . _ . . = . . . . . _ . _ _ _ . - _.. , _ ._ .. _ , _.. .. ._ ._ . _ . . . . _ _ . . .
.
..
g Mr. Ted C. Feigenbaum 2 -
i
- cc w/ encl:
-
. _
l
B. D. Kenyon, President - Nuclear Group
J. S. Streeter, Recovery Officer - Nuclear Oversight
W. A. DiProfio, Station Director - Seabrook Station
R. E. Hickok, Nuclear Training Manager - Seabrook Station
D. E. Carriere, Director,' Production Se; vices
- L. M. Cuoco, Senior Nuclear Counsel
- W. Fogg, Director, New Hampshire Office of Emergency Management
D. C. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass. .
. R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire i
D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency
Management Agency
F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power
Corporation
R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts
Seacoast Anti-Pollution League i
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
S. Comley, Executive Director, We the People of the United States
W. Meinert, Nuclear Engineer
.
4
1
,
4
J-
!
i
$
l.
k
4
w - w- - , e m . - - + - a yw--~ry- w -
ryy
- _ _ ~ . .- . - . .
'4
.
Mr. Ted C. Feigenbaum 3
Distribution w/encI _l -
Region i Docket Room (with concurrences)
PUBLIC '
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
H. Miller, RA/W. Axelson, DRA
C. Cowgill, DRP
R. Summers, DRP
C. O'Daniell, DRP
Distribution w/encls (VIA E-MAIL):
B. McCabe, OEDO
R. Correia, NRR (RPC)
F. Talbot, NRR
D. Screnci, . PAO, ORA
Inspection Program Branch, NRR (IPAS)
DOCDESK
DOCUMENT NAME: G:\ BRANCH 5\98-05. SEA
To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure "E" = Copy with ettachment/ enclosure
"N' = No copy ,,,
OFFICE Rl/DRP (j Q Rl/DRP [/V l
NAME RLorson ' *[ f CCowgill
- DATE Jj /6/98 d pJ/98
..
OFFICIAL RECORD COPY