ML20154A835
| ML20154A835 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 09/25/1998 |
| From: | Cowgill C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Feigenbaum T, Harpster T NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| Shared Package | |
| ML20154A841 | List: |
| References | |
| 50-443-98-05, 50-443-98-5, NUDOCS 9810050020 | |
| Download: ML20154A835 (3) | |
See also: IR 05000443/1998005
Text
.
_ _.
.
. _ . .
. . _
.
. _ . _ .
_ _ _ _ _ _ _ _ . _ _ _
. _ . ~ . . . . _ . . _
i'
L-
J
=:
.
L'
+
September 25,1998
.
Mr. T. C. Feigenbaum
,
Executive Vice President and Chief Nuclear Officer
' Seabrook Station
North Atlantic Energy Service Corporation
c/o Mr. Terry L. Harpster
P. O. Box 300:
Seabrook, NH 03874
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NO. 50-443/98-05
~ Dear Mr. Feigenbaum:
On August 22,1998, the NRC completed an inspection at Seabrook Station.' The enclosed
report presents the results of _that inspection.
The plant was operated safely during the period. Operators performed routine activities
4
includireg the plant start-up and power ascension well. Maintenance technicians performed
. several activities well, and engineering provided good support of the spent fuel pool rack
s
modification. The security program was inspected during this period. The NRC determined
,
that'you are implementing a security program that protects against acts of radiological
sabotage. Also, a radiation protection program inspection took place. Overall, the NRC
<
i
found the radiation' protection program was effectively implemented.
q
i
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
, .
and its enclosures will be placed in the NRC Public Document Room.
j
q
Sincerely,
Original Signed By:
lI
l
Curtis J. Cowgill, Chief
Projects Branch 5
?'
Division of Reactor Projects
Docket No. 50-443
p
License No: NPF-86
.
Enclosure:
1. NRC Inspection Report No. 50-443/98-05
i-
f-
~
f ,0l
l
9810050020 980925
.i
"
ADOCK 05000443
G
pm
i
1
a
,-
e.
.w-=
. . . _ _ _ _ _ _ . _ . . . . . _ . _ . . . . _ _
. .
. _ _ _ . _ . . = . . . . . _ . _ _ _ .
-
_.. , _ ._ .. _ , _.. .. ._ ._ . _ . . . . _ _ . . .
.
..
g
Mr. Ted C. Feigenbaum
2
-
i
- cc w/ encl:
.
_
-
B. D. Kenyon, President - Nuclear Group
J. S. Streeter, Recovery Officer - Nuclear Oversight
W. A. DiProfio, Station Director - Seabrook Station
R. E. Hickok, Nuclear Training Manager - Seabrook Station
D. E. Carriere, Director,' Production Se; vices
- L. M. Cuoco, Senior Nuclear Counsel
- W. Fogg, Director, New Hampshire Office of Emergency Management
D. C. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass.
.
. R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire
D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency
Management Agency
F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power
Corporation
R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts
Seacoast Anti-Pollution League
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
S. Comley, Executive Director, We the People of the United States
W. Meinert, Nuclear Engineer
4
.
1
,
4
J-
!
i
$
l
.
k
4
w
-
w-
- ,
e
m
. - - + -
a
yw--~ry-
w
-
ryy
-
_ ~ .
.-
.
-
. .
_
'4
.
Mr. Ted C. Feigenbaum
3
Distribution w/encI -
_l
Region i Docket Room (with concurrences)
PUBLIC '
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
H. Miller, RA/W. Axelson, DRA
C. Cowgill, DRP
R. Summers, DRP
C. O'Daniell, DRP
Distribution w/encls (VIA E-MAIL):
B. McCabe, OEDO
R. Correia, NRR (RPC)
F. Talbot, NRR
D. Screnci, . PAO, ORA
Inspection Program Branch, NRR (IPAS)
DOCDESK
DOCUMENT NAME: G:\\ BRANCH 5\\98-05. SEA
To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure
"E" = Copy with ettachment/ enclosure
"N' = No copy
,,,
OFFICE
Rl/DRP
(j Q
Rl/DRP [/V
l
NAME
RLorson ' [ f
CCowgill
DATE
Jj /6/98
d pJ/98
..