, . _
Callaway Pl ant p ,
Post Office Bcx 620 Fu!:an, Missoun 65251 UNTON Eucnuc 33 November 6,1996 :
I U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop Pl-137 Washington, DC 20555-0001 l ULNRC-3485 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT OCTOBER 1996 The enclosed Monthly Operating Report for October 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
M R. D. ffolter Manager, Callaway Plant RDA/ Mall /Imf Enclosure f&:24'i 9611190218 961031 PDR ADOCK 05000483 R PDR
4 ULNRC-3485 l l November 6,1996 '
L . Page 2 cc: Mr. L. Joe Callan Regional Administrator l U.S. Nuclear Regulatory Commission l Region IV l 611 Ryan Plaza Drive, Suite 400 '
Arlington, TX 76011-8064 l
l- E.aior Resident Inspector
{
l Callaway Resident OITice l U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies) :
l Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation !
l U. S. Nuclear Regulatory Commission
! Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W. i Washington, DC 20037 !
I l
i ULNRC-3485 November 6,1996 f- , ' Page 3 bec: Institute of Nuclear Power Operations Records Center .
Suite 100 !
700 Galleria Parkway I Atlanta, GA 30339-5957 l Dottie Sherman
!~ '
American Nuclear Insurers 29 S. Main Street
- West Hartford, CT 06107 l l
Mr. T. M. Handlan I Westinghouse Electric Corp.
I1601 Lilburn Park Road St. Louis, MO 63146 Mr. Fred Yost -
Director of Research .
Utility Data Institute 1700 K. Street Northwest Suite 400 i Washington DC 20006 D. F. Schnell (400)
G. L. Randolph J. V. Laux/G. A. Hughes A. C. Passwater/D. E. Shafer (470)
M. P. Barrett (100)
P. L. Reynolds (470) NSRB R. J. Irwin (470)
M. E. Taylor
! H. D. Bono E210.0001 A160.0761 RDA Chrono Manager, Plant Support Wolf Creek Nuclear Operating Corporation PO Box 411 r
Budington,KS 66839
_ . _ _ ._ . . . . . . . . . . . . . _ ___ _ -_.__....._m . . . . __ _ . _ _ . . . _ _, . . . _ _
- =. .
l i
i i; -
?
DOCKET NO.: 50-483 UNIT NAME:
)
CALLAWAY UNIT 1'- '
DATE: 11/6/96 COMPLETED BY: M. A. llotmes I TELEPliONE: 573/676-8842 i FAX: 573/676-8562 T
l l
l PART A -OPERATIONS
SUMMARY
The plant started a refueling outage coast down during the month of October. The coast down stat ,d at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.
PART B- PORY AA 4. iFETY VALVE
SUMMARY
- l None.
i l
l l
1 Page1of4
.. - . . . .. -. - - ._ ~ . .. . - _ - - - . - -- . . . . - . . .- .-.
4 a
l PART C AVERAGE DAILY UNIT POWER LEVEL I l
DOCKET NO: 50-483 l UNIT: Callaway Unit 1 l DATE: 11/6/96
- {
COMPLETED BY:
M. A. Holmes -
TELEPHONE: 573/676-8842 FAX: 573/676-8562 MONTH: OCTOBER 1996 i
AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1.156 17 0 2 1.157 18 0 3 1.169 19 0 4 1.168 20 0 5 1.158 21 0 6 1.042 22 0 l l
7 1.001 23 0 8 1.010 24 0 9 936 25 0 10 721 26 0 1
i
.11 610 27 0 l 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 i
16 0 Page 2 0f 4
i .
1-
- i PART D l l OPERATING DATA REPORT 4
DOCKET NO.: 50-483 !
UNIT NAME: CALLAWAY UNIT 1
! DATE: 11/6/96 l I
COMPLETED BY: M. A. Holmes !
- TELEPHONE
- 573/676-8842 4
FAX: 573/676-8562 OPERATING STATUS:
(OCT) (YTD) (CUM)
'l. REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD: 745 7,320.0 104,005.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171
- 3. POWER LEVEL TO WillCH RESTRICTED (IF ANY)(MWe-Net): 100 %
4 REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF FLOURS REACTOR WAS CRITICAL, 266.0 6,814.0 91,939.5
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
- 7. IIOURS GENERATOR ON-LINE 264.3 6,787.0 90,428.4
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH 829,440 23,794,074 306,752,792 1
- 10. GROSS ELECTRICAL ENERGY GENERATED 281,418 8,092,356 104,613,210 l
- (MWH) l1. NET ELECTRICAL ENERGY GENERATED 261,293 7,713,757 99,537,129 (MWH)
- 12. REACTOR SERVICE FACTC'1 35.7 93.1 88.4
- 13. REACTOR AVAILABILITY FACTOR 35.7 93.1 88.4
- 14. UNIT SERVICE FACTOR 35.4 92.7 - 86.9
- 15. UNIT AVAILABILITY FACTOR 35.4 92.7 86.9 i
- 16. ~ UNIT CAPACITY FACTOR (Using MDC) 31.2 93.7 85.1
' 17. UNIT CAPACITY FACTOR (Using Design MWe) 30.0 90.0 81.7
- 18. ~ UNIT FORCED OUTAGE RATE 0.0 0.56 2.21
- 19. SilVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Date: 10/12/96 Duration: 42 days
- 20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:
Page 3 of 4
. t PART E '
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I ,
DATE: 11/6/96 !
COMPLETED BY: M. A. Holmes TELEPHONE: 573/676-8842 FAX: 573/676-8562 REPORT MONTH: OCTOBER 1996 i
METHOD GF i TYPE SHUTTING DOWN
} F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER ACTIONS / COMMENTS 7 961012 S 480.7 C 1 Refueling outage. See comments below.
SUMMARY
- 7. The plant started a refueling outage coast down during the month of October. The coast down started at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.
REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM '
C: REFUELING 3: AUTOMATICSCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN) l H: OTHER(EXPLAIN)
Page 3 of 4
- l. _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ __________ ____