Monthly Operating Rept for Oct 1996 for Callaway Plant Unit 1
ML20134K576
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/31/1996
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3485, NUDOCS 9611190218
Download: ML20134K576 (7)


Text

,

p Callaway Pl ant Post Office Bcx 620 Fu!:an, Missoun 65251 UNTON Eucnuc 33 November 6,1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop Pl-137 Washington, DC 20555-0001 ULNRC-3485 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT OCTOBER 1996 The enclosed Monthly Operating Report for October 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

M R. D.

ffolter Manager, Callaway Plant RDA/ Mall /Imf Enclosure f&:24'i 9611190218 961031 PDR ADOCK 05000483 R

PDR

4 ULNRC-3485 l

November 6,1996 L

Page 2 cc: Mr. L. Joe Callan Regional Administrator l

U.S. Nuclear Regulatory Commission l

Region IV l

611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 l

l-E.aior Resident Inspector l

Callaway Resident OITice U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies) l Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation l

U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

i Washington, DC 20037 I

l

i ULNRC-3485 November 6,1996 f-

' Page 3 bec: Institute of Nuclear Power Operations Records Center.

Suite 100 700 Galleria Parkway I

Atlanta, GA 30339-5957 Dottie Sherman l

!~

American Nuclear Insurers 29 S. Main Street

- West Hartford, CT 06107 Mr. T. M. Handlan Westinghouse Electric Corp.

I1601 Lilburn Park Road St. Louis, MO 63146 Mr. Fred Yost -

Director of Research Utility Data Institute 1700 K. Street Northwest Suite 400 i

Washington DC 20006 D. F. Schnell (400)

G. L. Randolph J. V. Laux/G. A. Hughes A. C. Passwater/D. E. Shafer (470)

M. P. Barrett (100)

P. L. Reynolds (470) NSRB R. J. Irwin (470)

M. E. Taylor H. D. Bono E210.0001 A160.0761 RDA Chrono Manager, Plant Support Wolf Creek Nuclear Operating Corporation PO Box 411 Budington,KS 66839 r

-_.__....._m

=.

l i

i i

?

DOCKET NO.:

50-483

)

UNIT NAME:

CALLAWAY UNIT 1'-

DATE:

11/6/96 COMPLETED BY:

M. A. llotmes I

TELEPliONE:

573/676-8842 i

FAX:

573/676-8562 T

l PART A -OPERATIONS

SUMMARY

The plant started a refueling outage coast down during the month of October. The coast down stat,d at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.

PART B-PORY AA

4. iFETY VALVE

SUMMARY

None.

i l

1 Page1of4

-. - -._ ~.

4 a

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-483 l

UNIT:

Callaway Unit 1 DATE:

11/6/96

{

COMPLETED BY:

M. A. Holmes -

TELEPHONE:

573/676-8842 FAX:

573/676-8562 MONTH: OCTOBER 1996 i

AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1 1.156 17 0

2 1.157 18 0

3 1.169 19 0

4 1.168 20 0

5 1.158 21 0

6 1.042 22 0

7 1.001 23 0

8 1.010 24 0

9 936 25 0

10 721 26 0

1 i

.11 610 27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

i 16 0

Page 2 0f 4

i 1-i PART D l

l OPERATING DATA REPORT 4

DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT 1 DATE:

11/6/96 I

COMPLETED BY:

M. A. Holmes TELEPHONE:

573/676-8842 4

FAX:

573/676-8562 OPERATING STATUS:

(OCT)

(YTD)

(CUM)

'l.

REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD:

745 7,320.0 104,005.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171

- 3.

POWER LEVEL TO WillCH RESTRICTED (IF ANY)(MWe-Net): 100 %

4 REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF FLOURS REACTOR WAS CRITICAL, 266.0 6,814.0 91,939.5 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

IIOURS GENERATOR ON-LINE 264.3 6,787.0 90,428.4 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH 829,440 23,794,074 306,752,792 1

10.

GROSS ELECTRICAL ENERGY GENERATED 281,418 8,092,356 104,613,210

- (MWH) l1.

NET ELECTRICAL ENERGY GENERATED 261,293 7,713,757 99,537,129 (MWH) 12.

REACTOR SERVICE FACTC'1 35.7 93.1 88.4 13.

REACTOR AVAILABILITY FACTOR 35.7 93.1 88.4 14.

UNIT SERVICE FACTOR 35.4 92.7

- 86.9 15.

UNIT AVAILABILITY FACTOR 35.4 92.7 86.9 i

16.

~ UNIT CAPACITY FACTOR (Using MDC) 31.2 93.7 85.1

' 17.

UNIT CAPACITY FACTOR (Using Design MWe) 30.0 90.0 81.7

18. ~ UNIT FORCED OUTAGE RATE 0.0 0.56 2.21
19. SilVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling Date: 10/12/96 Duration: 42 days

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

t PART E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT I DATE:

11/6/96 COMPLETED BY:

M. A. Holmes TELEPHONE:

573/676-8842 FAX:

573/676-8562 REPORT MONTH: OCTOBER 1996 i

METHOD GF i-TYPE SHUTTING DOWN

}

F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.

DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER ACTIONS / COMMENTS 7

961012 S

480.7 C

1 Refueling outage. See comments below.

SUMMARY

7. The plant started a refueling outage coast down during the month of October. The coast down started at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATICSCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN) l H: OTHER(EXPLAIN)

Page 3 of 4 l.

.