ML20137M984
| ML20137M984 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/21/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20137M990 | List: |
| References | |
| NUDOCS 8601290119 | |
| Download: ML20137M984 (1) | |
See also: IR 05000321/1985037
Text
r
/8/d
> .
1AN 211386
__
jATTN:eorgia Power
Mr. R. Company
J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT NO. 50-321/85-37
On December 26-27, 1985, NRC inspected activities authorized by NRC Operating
License No. DPR-57 for your Hatch facility. At the conclusion of the inspection,
the findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
\Sd
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-321/85-37
cp w/ encl:
W. T. Beckham, Vice President and
eneral Manager-Nuclear Operation
C. Nix, Site General Manager
,. E. Fornel, Site QA Supervisor
tE. Gucwa, Chief, Nuclear Engineer
c w/ encl:
C Resident Inspector 8601290119 e60121
gh S. Jordan, Executive Secretary PDR ADOCK 05000321
Document Control Desk G PDR
State of Georgia
RII~ RII
-
RIId
,A yA
lbg
TGi ons:bhg TConlon AHerdt
1//6'/86 1/g/86 1/ /86
,
'- .CEO l