ML20137M984

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-321/85-37 on 851226-27.No Violations or Deviations Noted
ML20137M984
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/21/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20137M990 List:
References
NUDOCS 8601290119
Download: ML20137M984 (1)


See also: IR 05000321/1985037

Text

r

/8/d

>

.

1AN 211386

__

jATTN:eorgia Power Company

Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

REPORT NO. 50-321/85-37

On December 26-27, 1985, NRC inspected activities authorized by NRC Operating

License No. DPR-57 for your Hatch facility. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

\\Sd

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-321/85-37

cp w/ encl:

W. T. Beckham, Vice President and

eneral Manager-Nuclear Operation

C. Nix, Site General Manager

,. E. Fornel, Site QA Supervisor

tE. Gucwa, Chief, Nuclear Engineer

c w/ encl:

C Resident Inspector

8601290119 e60121

gh S. Jordan, Executive Secretary

PDR

ADOCK 05000321

Document Control Desk

G

PDR

State of Georgia

RII

RIId

RII

A

,A

y

~

-

TGi ons:bhg

TConlon

AHerdt

1/ /86

l b g

1//6'/86

1/g/86

,

.CEO l

'-