ML20105B538
| ML20105B538 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/31/1992 |
| From: | Ted Carter, Daughtery L ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20105B539 | List: |
| References | |
| NUDOCS 9209210013 | |
| Download: ML20105B538 (4) | |
Text
'
f I Attachment 1 to GNR0-92/001Li DOCKET NO. 50-416 DATE 09/04/92 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334-OPERATING STATUS
- 1. Unit Name: GGNS UNIT 1 Notes: [
- 2. Reporting Period: A_ugust 1992
- 3. Licensed Thermal Power (MWT): 3833 MWT
- 4. NameplateRating(GrossMWE): 1372.5 MWT 5, Design Electrical Rating (Net MWe): 1250 MWE l
- 6. Maximum Dependable Capacity (Gross MWe): 1190 MWF;
- 7. Maximum Dependable Capacity (Net MWe): 1143 MWE
- 8. If Changes Occur in Capacity Ratings (Items Numlier TThrough 7) Since Last Report.
Give Reasons:
N/A
- 9. Power Level To Which Restricted, In Any (Wet MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A __
This Month Yr to Date Cumulative
- 11. Hours In Reporting Pericd 744 S,855 68,967
- 12. Number of Hours Reactor Was Critical 702.0' 4,420.0 54,617.1
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 679.6- 4,234.3 52,284,.7
- 15. Unit Reserve Shutdown 1:aurs 0~ 0 0
- 16. Gross Thermal Energy Generated (MWH) 2,466T47i 15,380,325 181 TOT,3I5
- 17. 'iross Elect.'ical Energy Generated (MWH) 780,844 4,901,436 57,471,546
- 18. Net Electrical Energy Generated (MWH) 748,890 _4,700,748 14,961,463
- 19. Unit Service Factor ~
91.3 72.3 78.3
- 20. Unit Availability Factor 91.1 72.3 78.3
- 21. Unit Capacity Factor (Using MDC Net) 88.1 ,
70.2 74 6
- 22. Unit Capacity Factor (Using DER Net) 80.5 64.2 67.6
- 23. Unit Forced Outage Rate 8.7 7.8 6.6
- 24. Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each):
s
- 25. If Shut Down At End of Report Period. Estimated pate of Startup:
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY ~
10/20/84 COMMERCIAL OPERATION 07/01/86 9209210013 920914 PDR ADOCK 05 COO 416 R PDR
i 4
Attachment 2 to GNRO-92/00115
., l r
e i 1 DOCKET NO. 50-416 .!
i
! UNIT 1 i DATE 09/04/92 ;
i COMPLETED BY L. F. Daughtery ,
TELEPHONE 501-437-2334 i !
MONTH August 1992
~; 0 "' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i (MWe-Net) (MWe-Net) 1 1140 17 - 1186 i
2 1170 18 1182 ;
l 3 1169 19 1180 .
l 4
4 752 20 1180 [
. t 5 0 21 1178 l
6 0 22 1140 l
- 7 258 23 1162 ;
8 957 24 1134 9 883 25 1152 t j 10 1141 26 919 11 1086 27 1003 j 12 1112 28 1181 ;
i 13 1158 29 1044 i
14 1175 30 1053 15 1181 31 1142 :
i 16 1188 N/A l i
t
?
l i !
?
e i H00PAUG/SCMPFLR
', f
f.
Attachnent 3 to GNRO-92/00115 UNIT SHUTDOWNS AND POWER REDUCTIONS '
DOCKET NO. 50-416 UNIT NAME 1 _
DATE 09/04/92 '
COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH August 1992 i Method of ' Licensee Cause & Corrective No. Date Type Duration Reason Shutting Down Event System Component Actior. To Hours (2) Reactor Report # Code Code Prevent Recurrence (1)
(3) (4) (5) (C&CA) 65.0 3 92-017 TJ LT Reactor scram due to a spurious 92- 08/04/92 F A 006 low primary cooling water tank level signal when performing a grour.dit.g test with the test system malfunctioning.
92- 39.6 5 NA NA NA System dispatcher requested power 08/26/92 S H reduction for grid stability-007 during Hurricane Andrew.
f l
UNIT SHUTDOWNS AND POWER REDUCTIONS 4 i I 2' 3 _
Exhibit G - Instruc tions Method: !
F: Forced Reason:
A-Equipment Failure 1-Manual for Preparation of Data S: . Scheduled Entry Sheets for Licensee (Explain) 2-Manual Scram B-Maintenance or Test. 3-Automatic Scram Event Report (LER)
C-Rafueling 4-Continued File (NUREG-0161) i
}
D-Regulatory Restriction 5-Reduced load E-Operator Training & 6-Other.
Licensing Examination F-Administrative 5 G-Operational Error Exhibit 1-Same Source (Explain)
H-Other (Explain) 4 I
M00PAUG/SCMPFLR l
L
MAIN STEAM SAFETY RELIEF YALVE CHALLENGES 4 DOCKET NO. 50-416
. UNIT 1 i COMPLETED BY T. M. CARTER TELEPHONE 1601) 437-245T ,
August 04, 1992
~
04.cc of Occurrence:
Plant Operating Condition:
Rx Thermal Power 100% Rx Pressure (psia) 1047.9 Rx Mode 1 Rx Power (MWE) 1225.6 Rx Temperatures 545 F Number of mainsteam line SRVs: 20 ,
Number of SRVs affected by event: 2 Narrative:
On August 4, 1992, I reactor scram occurred due to primary water low generator trip.
a The following SRV's actuated automatically once:
B21-F051B B21-F0510 1
4 5
M M00PAUG/SCMPFLR i l 1
r t
-, _ . _