f I to GNR0-92/001Li DOCKET NO.
50-416 DATE 09/04/92 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334-OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 Notes:
[
2.
Reporting Period: A_ugust 1992 3.
Licensed Thermal Power (MWT): 3833 MWT 4.
NameplateRating(GrossMWE): 1372.5 MWT 5,
Design Electrical Rating (Net MWe): 1250 MWE l
6.
Maximum Dependable Capacity (Gross MWe): 1190 MWF; 7.
Maximum Dependable Capacity (Net MWe): 1143 MWE 8.
If Changes Occur in Capacity Ratings (Items Numlier TThrough 7) Since Last Report.
Give Reasons:
N/A 9.
Power Level To Which Restricted, In Any (Wet MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr to Date Cumulative
- 11. Hours In Reporting Pericd 744 S,855 68,967
- 12. Number of Hours Reactor Was Critical 702.0' 4,420.0 54,617.1
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 679.6-4,234.3 52,284,.7
- 15. Unit Reserve Shutdown 1:aurs 0~
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,466T47i 15,380,325 181 TOT,3I5
- 17. 'iross Elect.'ical Energy Generated (MWH) 780,844 4,901,436 57,471,546
_ 700,748 14,961,463
- 18. Net Electrical Energy Generated (MWH) 748,890 4,
- 19. Unit Service Factor 91.3 72.3 78.3
~
- 20. Unit Availability Factor 91.1 72.3 78.3
- 21. Unit Capacity Factor (Using MDC Net) 88.1 70.2 74 6
- 22. Unit Capacity Factor (Using DER Net) 80.5 64.2 67.6
- 23. Unit Forced Outage Rate 8.7 7.8 6.6
- 24. Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each):
s
- 25. If Shut Down At End of Report Period.
Estimated pate of Startup:
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84
~
COMMERCIAL OPERATION 07/01/86 9209210013 920914 PDR ADOCK 05 COO 416 R
i 4 to GNRO-92/00115 l
r i
e DOCKET NO.
50-416 1
UNIT 1
i i
DATE 09/04/92 i
COMPLETED BY L. F. Daughtery TELEPHONE 501-437-2334 i
MONTH August 1992
~;
0 "'
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net) 1 1140 17 -
1186 i
2 1170 18 1182 l
3 1169 19 1180 l
4 4
752 20 1180
[
t l
5 0
21 1178 6
0 22 1140 l
7 258 23 1162 8
957 24 1134 9
883 25 1152 t
j 10 1141 26 919 11 1086 27 1003 12 1112 28 1181 j
i 13 1158 29 1044 i
14 1175 30 1053 15 1181 31 1142 i
16 1188 N/A l
i t
l
?
i
?
e i
H00PAUG/SCMPFLR f
f.
Attachnent 3 to GNRO-92/00115 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME 1
DATE 09/04/92 '
COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH August 1992 i
Method of
' Licensee Cause & Corrective No.
Date Type Duration Reason Shutting Down Event System Component Actior. To (1)
Hours (2)
Reactor Report #
Code Code Prevent Recurrence (3)
(4)
(5)
(C&CA) 92-08/04/92 F
65.0 A
3 92-017 TJ LT Reactor scram due to a spurious low primary cooling water tank 006 level signal when performing a grour.dit.g test with the test system malfunctioning.
92-08/26/92 S
39.6 H
5 NA NA NA System dispatcher requested power reduction for grid stability-007 during Hurricane Andrew.
f l
UNIT SHUTDOWNS AND POWER REDUCTIONS 3
4 i
I 2'
Method:
Exhibit G - Instruc tions F: Forced Reason:
S:. Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test.
3-Automatic Scram Event Report (LER)
C-Rafueling 4-Continued File (NUREG-0161) i
}
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other.
Licensing Examination F-Administrative 5
G-Operational Error Exhibit 1-Same Source (Explain)
H-Other (Explain) 4 I
M00PAUG/SCMPFLR l
L
MAIN STEAM SAFETY RELIEF YALVE CHALLENGES DOCKET NO.
50-416 4
UNIT 1
i COMPLETED BY T. M. CARTER TELEPHONE 1601) 437-245T
~
04.cc of Occurrence:
August 04, 1992 Plant Operating Condition:
Rx Thermal Power 100%
Rx Pressure (psia) 1047.9 Rx Mode 1
Rx Power (MWE) 1225.6 Rx Temperatures 545 F Number of mainsteam line SRVs:
20 Number of SRVs affected by event:
2 Narrative:
On August 4, 1992, I reactor scram occurred due to primary water low generator trip.
a The following SRV's actuated automatically once:
B21-F051B B21-F0510 1
4 5
M M00PAUG/SCMPFLR i
l 1
r t
_