ML20085L518
| ML20085L518 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/24/1991 |
| From: | BOSTON EDISON CO. |
| To: | |
| Shared Package | |
| ML20085L516 | List: |
| References | |
| NUDOCS 9111040199 | |
| Download: ML20085L518 (2) | |
Text
- . - . . - . - . . _ . _ . . _ . . . . _ . . _ _ _ _ . . - _ . _ - . _ . _ _ . _ _ _ _ . - . _ . _ _ _ _ _ _ _ . . _ . _ _ ..
i.
l i
I 1
l ATTACHMENT B 10 BECo 91 136 P.rpposed Technical Soecification Paae 108 i
l 1
l-i
(
1 l
9211040199 911024 PDR ADOCK 050002o3 P PDR
^
LIKillNGCONDITIONFOROPERATION SURVEILLANCE REQUIREMENT 3.5.0 Reactor Core Isolation Cooling 4.5.0 Brattor Core Isolation Cooling iRCIC) System (RCIC) S.yligm
- 1. The RCIC system shall be operable 1. RCIC system testing shall be whenever there is irradiated fuel performed as follows:
in the reactor vessel, reactor pressure is greater than 150 a. Simulated Once/ operating psig, and reactor coolant Automatic cycle temperature is greater than Actuation 365'F1 except as specified in Test 3.5.0.2 below,
- b. Pump Once/ month 2.- From and after the date that the Operability RCICS is made or found to be inoperable for any reason, c. Motor Once/ month continued reactor power operation Operated is permissible only during the Valve succeeding seven days' provided i Operability that during such seven days the HPCIS is operable. d. Flow Rate at Once/3 months 1000 psig
- 3. If the requirements of 3.5.0 cannot be met, an orderly e. Flow Rate at Once/ operating shutdown'shall be initiated and 160 psig cycle the reactar pressure shall be reduced to or below 150 psig The RCIC pump shall deliver at within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. lea:t 400 gpm for a system head correspondiog to a reactor pressurc of 1000 to 150 psig.
l l