ML20085L518
| ML20085L518 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/24/1991 |
| From: | BOSTON EDISON CO. |
| To: | |
| Shared Package | |
| ML20085L516 | List: |
| References | |
| NUDOCS 9111040199 | |
| Download: ML20085L518 (2) | |
Text
-. -.. -. -.. _
i.
l i
I ATTACHMENT B 10 BECo 91 136 P.rpposed Technical Soecification Paae 108 i
l 1
l-i
(
1 l
9211040199 911024 PDR ADOCK 050002o3 P
^
LIKillNGCONDITIONFOROPERATION SURVEILLANCE REQUIREMENT 3.5.0 Reactor Core Isolation Cooling 4.5.0 Brattor Core Isolation Cooling iRCIC) System (RCIC) S.yligm 1.
The RCIC system shall be operable 1.
RCIC system testing shall be whenever there is irradiated fuel performed as follows:
in the reactor vessel, reactor pressure is greater than 150 a.
Simulated Once/ operating psig, and reactor coolant Automatic cycle temperature is greater than Actuation 365'F1 except as specified in Test 3.5.0.2 below, b.
Pump Once/ month 2.-
From and after the date that the Operability RCICS is made or found to be inoperable for any reason, c.
Motor Once/ month continued reactor power operation Operated is permissible only during the Valve succeeding seven days' provided i
Operability that during such seven days the HPCIS is operable.
d.
Flow Rate at Once/3 months 1000 psig 3.
If the requirements of 3.5.0 cannot be met, an orderly e.
Flow Rate at Once/ operating shutdown'shall be initiated and 160 psig cycle the reactar pressure shall be reduced to or below 150 psig The RCIC pump shall deliver at within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
lea:t 400 gpm for a system head correspondiog to a reactor pressurc of 1000 to 150 psig.
l l
- Except that power operation may I
continue until 6:02 PM on January l 14, 1992 only for the LC0 entered I on October 9,.1991 for RCIC l
inoperability due to the i
potential for undesirable DC bus i
voltage transient-induced trips I
of the RCIC inverter.
l Amendment No. 42, 109, Ild, 135, 108
.