Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Indian Point Energy Center S- Entergy P.O. Box 308 Buchanan, NY 10511 Tel 914 736 8001 Fax 914 736 8012 Robert J. Barrett Vice President, Operations Indian Point 3 January 9, 2002 IPN-02-004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-Pl-17 Washington, D.C. 20555-0001
Subject:
Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operating Report for December 2001
Dear Sir:
The attached monthly operating report, for the month of December 2001, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 5.6.4.
Indian Point 3 is making no commitments in this letter.
Very truly yours, Ro J. Barre~tt -
Vic. resident Operations Indian Point 3 Nuclear Power Plant cc: See next page j:iýý4
Docket No. 50-286 IPN-02-004 Page 2 of 2 Attachment cc: Mr. Hubert J. Miller Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point 3 Nuclear Power Plant P.O. Box 337 Buchanan, NY 10511-0337 U.S. Nuclear Regulatory Commission ATTN: Director, Office of Information Resource Management Washington, D.C. 20555 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957
OPERATING DATA REPORT DOCKET NO. 50-286 UNIT: Indian Point 3 DATE: 1-03-02 COMPLETED BY: T. Orlando TELEPHONE NO: (914) 736-8340 LETTER NO: IPN-02-004 ATTACHMENT PAGE 1 of 4 OPERATING STATUS
- 1. Unit Name: Indian Point No. 3 Nuclear Power Plant
- 2. Reporting Period: December 2001
- 3. Licensed Thermal Power (MWt): 3025
- 4. Nameplate Rating (Gross MWe): 1013
- 5. Design Electrical Rating (Net MWe): 965
- 6. Maximum Dependable Capacity (Gross MWe): 1000
- 7. Maximum Dependable Capacity (Net MWe): 965
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons for Restrictions, If Any:
This Month Yr-to-Date Cumulative 744 8,760 222,521
- 11. Hours In Reporting Period 744 8,156.38 137,607.73
- 12. Number Of Hours Reactor Was Critical 0 0 0
- 13. Reactor Reserve Shutdown Hours 744 8,131 134,797
- 14. Hours Generator On-Line 0 0 0
- 15. Unit Reserve Shutdown Hours 2,246,553 24,384,435 386,830,940
- 16. Gross Thermal Energy Generated (MWH) 758,275 8,212,605 123,883,463
- 17. Gross Electrical Energy Generated (MWH) 734,132 7,940,173 119,604,225
- 18. Net Electrical Energy Generated (MWH) 100 92.8 60.6
- 19. Unit Service Factor 100 92.8 60.6
- 20. Unit Availability Factor 102.3 93.9 56.4*
- 21. Unit Capacity factor (Using MDC Net) 102.3 93.9 55.7
- 22. Unit Capacity Factor (Using DER Net) 0 0 24.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Weighted Average
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-286 UNIT: Indian Point 3 DATE: 1-03-02 COMPLETED BY: T. Orlando TELEPHONE NO: (914) 736-8340 LETTER NO: IPN-02-004 ATTACHMENT PAGE 2 of 4 MONTH December 2001 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 987 17 987 2 987 18 988 3 987 19 987 4 988 20 988 5 987 21 987 6 987 22 987 7 973 23 987 8 987 24 987 9 987 25 987 10 987 26 987 11 987 27 988 12 986 28 988 13 987 29 989 14 987 30 988 15 987 31 989 16 986 INSTRUCTIONS: On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
DOCKET NO. 50-286 UNIT: Indian Point 3 DATE: 1-03-02 COMPLETED BY: T. Orlando TELEPHONE NO. (914) 736-8340 LETTER NO: IPN-02-004 ATTACHMENT PAGE 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 2001 METHOD OF NO. DATE TYPE DURATION REASON SHUTTING LICENSEE EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1 (HOURS) 2 DOWN REPORT # CODE CODE PREVENT RECURRENCE REACTOR 3 4 5 None 1 2 3 4 5 F: Forced Reason: Method: Exhibit G - Instructions Exhibit 1 S: Scheduled A- Equipment 1-Manual for Preparation of Data Same Source B- Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C- Refueling 3-Automatic Scram Event Report (LER) File D- Regulatory Restriction 4-Other (Explain) (NUREG - 0161)
E- Operator Training & Licensee Examination F- Administrative G- Operational Error H- Other (Explain)
DOCKET NO. 50-286 UNIT: Indian Point 3 DATE: 1-03-02 COMPLETED BY: T. Orlando TELEPHONE NO.: (914) 736-8340 LETTER NO. IPN-02-004 ATTACHMENT PAGE 4 of 4
SUMMARY
OF OPERATING EXPERIENCE December 2001 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross generation of 758,275 MWH.
On December 7, at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, a planned unit load reduction commenced in order to facilitate performance of surveillance test 3PT-Q1 07, "Main Turbine Stop and Control Valve Exercise and Vibration Monitoring." Following successful performance of the test, a load escalation commenced at 2134 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.11987e-4 months <br />. The unit achieved full load at approximately 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> and remained on line at full load for the remainder of the reporting period.