ML021340503

From kanterella
Jump to navigation Jump to search
December 2001 Monthly Operating Report for Indian Point Unit 3 Nuclear Power Plant
ML021340503
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/09/2002
From: Barrett R
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IPN-02-004
Download: ML021340503 (6)


Text

S-Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center P.O. Box 308 Buchanan, NY 10511 Tel 914 736 8001 Fax 914 736 8012 Robert J. Barrett Vice President, Operations Indian Point 3 January 9, 2002 IPN-02-004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-Pl-17 Washington, D.C. 20555-0001

Subject:

Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operating Report for December 2001

Dear Sir:

The attached monthly operating report, for the month of December 2001, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 5.6.4.

Indian Point 3 is making no commitments in this letter.

Very truly yours, Ro J. Barre~tt Vic.

resident Operations Indian Point 3 Nuclear Power Plant cc: See next page j:iýý4

Docket No. 50-286 IPN-02-004 Page 2 of 2 Attachment cc:

Mr. Hubert J. Miller Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point 3 Nuclear Power Plant P.O. Box 337 Buchanan, NY 10511-0337 U.S. Nuclear Regulatory Commission ATTN: Director, Office of Information Resource Management Washington, D.C. 20555 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957

OPERATING DATA REPORT DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

LETTER NO:

50-286 Indian Point 3 1-03-02 T. Orlando (914) 736-8340 IPN-02-004 ATTACHMENT PAGE 1 of 4 OPERATING STATUS Unit Name:

Indian Point No. 3 Nuclear Power Plant Reporting Period:

December 2001 Licensed Thermal Power (MWt):

3025 Nameplate Rating (Gross MWe):

1013 Design Electrical Rating (Net MWe):

965 Maximum Dependable Capacity (Gross MWe):

1000 Maximum Dependable Capacity (Net MWe):

965 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons for Restrictions, If Any:

11.

Hours In Reporting Period

12.

Number Of Hours Reactor Was Critical

13.

Reactor Reserve Shutdown Hours

14.

Hours Generator On-Line

15.

Unit Reserve Shutdown Hours

16.

Gross Thermal Energy Generated (MWH)

17.

Gross Electrical Energy Generated (MWH)

18.

Net Electrical Energy Generated (MWH)

19.

Unit Service Factor

20.

Unit Availability Factor

21.

Unit Capacity factor (Using MDC Net)

22.

Unit Capacity Factor (Using DER Net)

23.

Unit Forced Outage Rate This Month 744 744 0

744 0

2,246,553 758,275 734,132 100 100 102.3 102.3 0

Yr-to-Date 8,760 8,156.38 0

8,131 0

24,384,435 8,212,605 7,940,173 92.8 92.8 93.9 93.9 0

Cumulative 222,521 137,607.73 0

134,797 0

386,830,940 123,883,463 119,604,225 60.6 60.6 56.4*

55.7 24.0

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

25.

If Shut Down At End Of Report Period. Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Weighted Average Forecast

1.
2.
3.
4.
5.
6.
7.

8.

Achieved

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

LETTER NO:

50-286 Indian Point 3 1-03-02 T. Orlando (914) 736-8340 IPN-02-004 ATTACHMENT PAGE 2 of 4 MONTH December 2001 AVERAGE DAILY POWER DAY 987 987 987 988 987 987 973 987 987 987 987 986 987 987 987 986 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 987 988 987 988 987 987 987 987 987 987 988 988 989 988 989 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO.

LETTER NO:

50-286 Indian Point 3 1-03-02 T. Orlando (914) 736-8340 IPN-02-004 ATTACHMENT PAGE 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 2001 1

F: Forced S: Scheduled 2

3 Reason:

Method:

A-Equipment 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & Licensee Examination F-Administrative G-Operational Error H-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG - 0161) 5 Exhibit 1 Same Source METHOD OF NO.

DATE TYPE DURATION REASON SHUTTING LICENSEE EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1

(HOURS) 2 DOWN REPORT #

CODE CODE PREVENT RECURRENCE REACTOR 3 4

5 None

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO.:

LETTER NO.

50-286 Indian Point 3 1-03-02 T. Orlando (914) 736-8340 IPN-02-004 ATTACHMENT PAGE 4 of 4

SUMMARY

OF OPERATING EXPERIENCE December 2001 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross generation of 758,275 MWH.

On December 7, at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, a planned unit load reduction commenced in order to facilitate performance of surveillance test 3PT-Q1 07, "Main Turbine Stop and Control Valve Exercise and Vibration Monitoring." Following successful performance of the test, a load escalation commenced at 2134 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.11987e-4 months <br />. The unit achieved full load at approximately 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> and remained on line at full load for the remainder of the reporting period.