ML021680081
| ML021680081 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/03/2002 |
| From: | Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML021680081 (8) | |
Text
DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 06/03/02 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 55 11 IR 06/03/02 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: e49968 Vo I
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 55 dated 06/03/02 Immediately, upon receipt of the item(s) below, please insert and/or remove the documents indicated. Please destroy the removed documents. Please be sure that Revision 54 dated 3/22/02 has been inserted prior to inserting these pages.
Location Remove Insert In Front of TRM Manual Title Page Rev 54 03/22/02 Title Page Rev 55 06/03/02 Immediately following List of Effective Pages List of Effective Pages Title Page LEP- I through LEP- 4 Rev 54 03/22/02 LEP-1 through LEP- 4 Rev 55 06/03202 3.6 Containment Systems Page TRM 3.6-4 Rev 31 10/99 Page TRM 3.6-4 Rev 55 06/02 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMA4 TION DTC: TMTRM File: 1754 DSN: TRM VOL I Rev: 55 Date: 06/03/02 Recipient 5*
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 31 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 31 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3 - c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 39 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12 Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 31 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 31 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 39 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 TRM Vol. I LEP-I REV 55 06/03/02
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 47 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 31 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 31 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRP 3.7-5 Revision 31 TRM 3.12-8 Revision 40 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3 .8-a Revision 31 TRM 3.12-24 Revision 31 TRIM 3.8-1 Revision 31 TRM 3.12-25 Revision 31
-RM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 31 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3 .8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 TRM Vol. I LEP-2 REV 55 06/03/02
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-6 Revision 31 TRM B3.6.3-1 Revision 31 TRM 5.0-7 Revision 31 TRM B3.6.4-1 Revision 31 TRM 5.0-8 Revision 31 TRM B3.6.5-1 Revision 31 TRM 5.0-9 Revision 31 TRM B3.6.6-1 Revision 31 TRM B1.0-1 Revision 31 TRM B3.6.7-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3.0-1 Revision 31 TRM B3.7.1-1 Revision 31 TRM B3.0-2 Revision 31 TRM B3.7.2-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.7.3-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.4-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.4-2 Revision 31 TRM B3.0-6 Revision 54 TRM B3.7.5-1 Revision 31 TRM B3.0-7 Revision 54 TRM B3.7.6-1 Revision 31 TRM B3. 1-1 Revision 31 TRM B3.7.7-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.9-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.9-2 Revision 31 TRM B3.3.2-1 Revision 31 TRM B3.8.1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.3-1 Revision 31 TRM B3.8.3-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3.8.6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3.9.2-1 Revision 31 TRM B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRM B3.10-1 Revision 31 TRM B3.3.6-5 Revision 31 TRM B3.11.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.2-1 Revision 44 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 31 TRM B3.12.5-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1 Revision 31 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 34 TRM B3.4.1-3 Revision 34 TRM B3.4.1-4 Revision 34 TRM B3.4.1-5 Revision 34 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM B3.4.6-1 Revision 31 TRM B3.4.7-1 Revision 31 TRM B3.5-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM B3.6.2-1 Revision 31 TRM Vol. I LEP-3 REV 55 06/03/02
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 TRM Vol. I LEP-4 REV 55 06/03/02
PCIVs TR 3.6.3 TABLE TR3.6.3-I (Page 2 of 22)
Primary Containment Isolation Valves MAXIMUM ISOLATION TIME FUNCTION (seconds)(u)
- 1. Automatic Isolation Valves(a) (continued)
- c. Group 3 - Residual Heat Removal (RHR) System RHR Drywell Spray Isolation Valves Loop A: E1150-F016A 150 E1150-F021A 60 Loop B: E1150-FO16B 150 E1150-F021B 60 RHR Containment Cooling/Test Isolation Valves Loop A: E1150-F024A 45*'
Loop B: E1150-F024B 45*
RHR Suppression Pool Spray Isolation Valves Loop A: E1150-F027A 60 Loop B: EII50-F027B 60 RHR Suppression Pool Spray/Test Isolation Valves Loop A: E1150-F028A 45*
Loop B: E1i50-F028B 45*
- d. Group 4 - Residual Heat Removal Shutdown Cooling and Head Spray RHR Shutdown Cooling Suction Isolation Valves inboard: E1150-F009 51 Outboard: EI!50-F008 51 RýR Reactor Pressure Vessel Head Spray Isolation Valves
- nboard: E1150-F022 36 Outboard: E1150-F023 120
- e. Group i - Core Spray System Core Spray Pump Flow Test Valves' Loop A: E2150-F015A 150 Loop 5: E2150-F015B 150 (continued)
"-o ensure LPC: response time of 72 seconds per OPL-4.
TRMI Vol. i TRM 3 .6-4 REV 55 06/02