ML032880454
| ML032880454 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 10/09/2003 |
| From: | Widay J Rochester Gas & Electric Corp |
| To: | Clark R Document Control Desk, NRC/NRR/DLPM/LPD1 |
| References | |
| Download: ML032880454 (3) | |
Text
A 0 An Energy East Company ROCHESERGASANDECIRCCORPORATWON
- 89EAST AVENUEROCHFESERNY 146494001 585546-2700 vwwwre.om October 9, 2003 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for September 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuantto Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of September 2003.
Very truly yours, a --
hA. Widay ant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT 50-244 October 9, 2003 COMPLETED BY:
TLJohn V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS
- 1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
- 2. Reporting Period: September, 2003
- 3. Design Electric Rating (Net MWe): 470
- 4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative*
- 5. Number of hours Reactor Was Critical 340.8 6104.8 245121.7
- 6. Hours Generator On-line 340.3 6084.1 241943.2
- 7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
- 8. Net Electrical Energy Generated (MWH) 151107.0 2973607.3 110302516.3
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
IL DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: October 9. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: September 2003 (Month/Year)
NO. DATE TYPE DURATION REASON) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN2) COMMENTS 4 030915 S 379.7 C 1 Refueling and maintenanc, outage
SUMMARY
- End of fuel cycle coastdown began at the start of the month of September. Power gradually decreased from full power to 81% over the time period of September 1 through September 14, 2003. At 2329 on September 14, 2003, the unit began a manual shutdown for refueling and maintenance. The unit was taken off-line at 0420 on September 15, 2003. The shutdown continued through the end of the month.
(1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manuel B - Maintenance or Test 2 - Manual Trip/Scram C- Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Trainngflicense Examination 5 - Other (Explain)
F- Administrative G - Operational Error (Explain)
H -Other (Explain)